• Title/Summary/Keyword: integrated scheduling

Search Result 217, Processing Time 0.033 seconds

An Integrated Scheduling Approach for Real-Time Web Servers (실시간 웹서버 시스템을 위한 통합 스케줄링 방안)

  • Kang, Bong-Jik;Jung, Suk-Yong;Lee, Hyun-Suk;Choe, Gyeong-Hui;Jeong, Gi-Hyeon;Yu, Hae-Yeong
    • Journal of the Institute of Electronics Engineers of Korea CI
    • /
    • v.39 no.6
    • /
    • pp.36-46
    • /
    • 2002
  • This paper proposes an integrated scheduling mechanism for embedded system with real-time web server to meet the characteristics of real time task. The proposed scheduling mechanism may solve the so-called priority inversion problem in scheduling between urgent web requests and tasks with low priorities. The priority inversion problem happens because of operating two independent schedulers, web scheduler and operating system scheduler in a system without considering the requirements of each other. In the proposed mechanism, two schedulers are integrated in an operating system and the integrated scheduler schedules tasks for urgent web requests with real time characteristics and other application tasks together. Since all tasks are scheduled by one unified scheduler that knows the characteristics of tasks, the tasks are scheduled with their absolute priorities and thus the priority inversion problem can be eliminated. The performance is measured on a prototype embedded system with the proposed algorithm.

Hierarchical approaches for the FMS production planning and scheduling problems (FMS의 생산계획 및 일정계획을 위한 단계적 해법에 관한 연구)

  • 장성용;박진우
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1990.04a
    • /
    • pp.195-208
    • /
    • 1990
  • Flexible Manufacturing System(FMS) is an integrated, computer controlled complex of automated material handling devices and numerically controlled machine tools that can simultaneously process medium-sized volumes of a variety of part types. This paper discusses planning problems that can be solved for efficient use of an FMS and present an integrated decision support system for FMS production planning and scheduling problems. FMSDS(Flexible Manufacturing Systems Decision Support System) consists of data handling modules, part selection module, loading module, load adjusting module, scheduling module and simulation module etc. This paper presents the solution methodology of each subproblems and integrated interfaces between subproblems using hierarchical approaches and loop controls considering the relationships between subproblems. A case study by this model is presented.

  • PDF

A Model for Integration of Process Planning and Scheduling with Outsourcing in Manufacturing Supply Chain (생산공급사슬에서의 아웃소싱을 고려한 공정계획 및 일정계획의 통합을 위한 모델)

  • Jeong, Chan-Seok;Lee, Young-Hae;Moon, Chi-Ung
    • IE interfaces
    • /
    • v.13 no.3
    • /
    • pp.512-520
    • /
    • 2000
  • An integrated process planning and scheduling model considering outsourcing in manufacturing supply chain is proposed in this paper. The process planning and scheduling considering outsourcing are actually interrelated and should be solved simultaneously. The proposed model considers the alternative process plans for job types, precedence constraints of job operations, due date of production, transportation time and production information for outsourcing. The integrated states include:(1) Operations sequencing, (2) Machine selection, (3) Scheduling with outsourcing under the due date. To solve the model, a heuristic approach based on genetic algorithm(GA) is developed. The proposed approach minimizes the makespan considering outsourcing and shows the best operation-sequences and schedule of all jobs.

  • PDF

An Interactive Planning and Scheduling Framework for Optimising Pits-to-Crushers Operations

  • Liu, Shi Qiang;Kozan, Erhan
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.1
    • /
    • pp.94-102
    • /
    • 2012
  • In this paper, an interactive planning and scheduling framework are proposed for optimising operations from pits to crushers in ore mining industry. Series of theoretical and practical operations research techniques are investigated to improve the overall efficiency of mining systems due to the facts that mining managers need to tackle optimisation problems within different horizons and with different levels of detail. Under this framework, mine design planning, mine production sequencing and mine transportation scheduling models are integrated and interacted within a whole optimisation system. The proposed integrated framework could be used by mining industry for reducing equipment costs, improving the production efficiency and maximising the net present value.

STOCHASTIC CASHFLOW MODELING INTEGRATED WITH SIMULATION BASED SCHEDULING

  • Dong-Eun Lee;David Arditi;Chang-Baek Son
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.395-398
    • /
    • 2011
  • This paper introduces stochastic cash-flow modeling integrated with simulation based scheduling. The system makes use of CPM schedule data exported from commercial scheduling software, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, simulates the schedule network, computes the deterministic and stochastic project cash-flows, plots the corresponding cash flow diagrams, and estimates the best fit PDFs of overdraft and net profit of a project. It analyzes the effect of different distributions of activity durations on the distribution of overdrafts and net profits, and improves reliability compared to deterministic cash flow analysis.

  • PDF

A Study on the Scheduling of Planned Maintenance for Multicomponent System with Hidden Failures : Focusing on Inspection Cost (다품목 시스템의 Hidden Failure를 고려한 계획정비 스케줄링에 관한 연구 : 검사비용을 중심으로)

  • Kim, Mansoo;Hyun, Do Kyung;Kim, Sung Hwan;Ji, Woong Ki;Kwon, Ki-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.149-158
    • /
    • 2019
  • The scheduling of planned maintenance problem of a system consisting of a number of components was studied. The purpose of maintenance scheduling is to minimize the cost of maintaining long-term operations. On the system side, the cost of a system shutdown can be minimized by grouping and inspecting a number of components. In addition, proper inspection cycles can be selected for each component to identify the failure sufficiently early to minimize the cost of the failure. To reduce the complexity of the calculations, the 'base interval approach' used in previous studies was applied and, in addition, the inspection cost savings from simultaneous inspections of multiple components were considered. To compare the effectiveness of inspection cost savings, this paper presents the results of simulation analysis performed by referring to the cases in the existing studies.

An Improved Genetic Algorithm for Integrated Planning and Scheduling Algorithm Considering Tool Flexibility and Tool Constraints (공구유연성과 공구관련제약을 고려한 통합공정일정계획을 위한 유전알고리즘)

  • Kim, Young-Nam;Ha, Chunghun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.2
    • /
    • pp.111-120
    • /
    • 2017
  • This paper proposes an improved standard genetic algorithm (GA) of making a near optimal schedule for integrated process planning and scheduling problem (IPPS) considering tool flexibility and tool related constraints. Process planning involves the selection of operations and the allocation of resources. Scheduling, meanwhile, determines the sequence order in which operations are executed on each machine. Due to the high degree of complexity, traditionally, a sequential approach has been preferred, which determines process planning firstly and then performs scheduling independently based on the results. The two sub-problems, however, are complicatedly interrelated to each other, so the IPPS tend to solve the two problems simultaneously. Although many studies for IPPS have been conducted in the past, tool flexibility and capacity constraints are rarely considered. Various meta-heuristics, especially GA, have been applied for IPPS, but the performance is yet satisfactory. To improve solution quality against computation time in GA, we adopted three methods. First, we used a random circular queue during generation of an initial population. It can provide sufficient diversity of individuals at the beginning of GA. Second, we adopted an inferior selection to choose the parents for the crossover and mutation operations. It helps to maintain exploitation capability throughout the evolution process. Third, we employed a modification of the hybrid scheduling algorithm to decode the chromosome of the individual into a schedule, which can generate an active and non-delay schedule. The experimental results show that our proposed algorithm is superior to the current best evolutionary algorithms at most benchmark problems.

Integrated Packet Scheduling for VoIP Service (VoIP 서비스를 위한 통합 패킷 스케줄링)

  • Lee, Eun-Joung;Park, Hyung-Kun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.11
    • /
    • pp.2124-2126
    • /
    • 2008
  • In the wireless communication systems, the demand of multimedia services is also increased. Unlike typical data packets, realtime service such as VoIP packets have delay bound and low loss rate requirement. In this paper we propose a new scheduling algorithm that be able to allocate resources to the different kinds of services such as VoIP and data packet. The proposed algorithm considers both time delay and channel condition toe determine the priority. Simulation results show that the proposed algorithm works more efficiently than the conventional algorithms.

Integrated Process Planning and Scheduling in Multiple Plants Chain (다중 플랜트 체인 구조에서 공정계획과 일정계획의 통합)

  • Moon, Chi-Ung;Kim, Kyu-Woong;Kim, Jong-Soo;Hur, Sun
    • IE interfaces
    • /
    • v.13 no.3
    • /
    • pp.388-395
    • /
    • 2000
  • In this paper, we propose an approach for integrated process planning and scheduling through analysis of the alternative operations sequences and machine selection in supply chain with multiple plants. It takes into account such factors alternative machine, alternative operations sequences, setup time, transportation time between plants, along with other manufacturing factors. The objective of the model is to minimize makespan of machine schedules for all parts, determines operations sequence for each part, and selects a machine for each operation simultaneously. Examples are presented to demonstrate the effectiveness of the proposed approach.

  • PDF

An optimization model for scheduling unloading operations at an integrated steel mill (일관제철소 원료 부두 하역 일정계획 최적화 모형)

  • Jang, Su-Yeong;Kim, Byeong-In
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.11a
    • /
    • pp.273-276
    • /
    • 2006
  • At an integrated steel mill, various raw material such as coal and iron ore are unloaded from a large ship. The unloaded raw material is then transported to storage yards through a complex belt conveyer network. We propose an optimization model for scheduling the unloading operations under the limitations of available berths, unloading equipments and transportation capacity of the belt conveyer network. We show that the problem is NP-Hard and propose a heuristic approach to the problem.

  • PDF