• 제목/요약/키워드: in-situ hydraulic test

검색결과 96건 처리시간 0.024초

수압파쇄 현장시험을 통한 국내 지반의 초기응력 분포양상 해석 (Analysis of In-Situ Stress Regime from Hydraulic Fracturing Field Measurements in Korea)

  • 최성웅
    • 산업기술연구
    • /
    • 제28권B호
    • /
    • pp.111-116
    • /
    • 2008
  • Since the hydraulic fracturing field testing method was introduced first to Korean geotechnical engineers in 1994, there have been lots of progresses in a hardware system as well as an interpretation tool. The hydrofracturing system of first generation was the pipe-line type, and it has been developed to a wire-line system at their second generation. The current up-to-date system is more compact and is able to be operated by all-in-one system. With a progress in a hardware system, the software for analyzing in-situ stress regime has also been progressed. The shut-in pressure, which is the most ambiguous parameter to be obtained from hydrofracturing pressure curves, can now be acquired automatically from the various methods. While the hardware and software for hydrofracturing tests are being developed during the last decade, the author could accumulate the field test results which can cover the almost whole area of South Korea. Currently these field data are used widely in a feasibility study or a preliminary design step for tunnel construction in Korea. Regarding the difficulties in a site selection and a test performance for the in-situ stress measurement at an off-shore area, the in-situ stress regime obtained from the field experiences in the land area can be used indirectly for the design of a sub-sea tunnel. From the hydrofracturing stress measurements, the trend of magnitude and direction of in-situ stress field was shown identically with the geological information in Korea.

  • PDF

굴착영향영역(EDZ) 투수특성의 실험적 평가기술 (In-Situ Evaluation Technique for Hydraulic Conductivity in Excavation Disturbed Zone (EDZ))

  • 김형목;류동우;신중호
    • 터널과지하공간
    • /
    • 제18권2호
    • /
    • pp.91-97
    • /
    • 2008
  • 본 고에서는 공동굴착에 따른 주변 영향영역 암반의 투수 특성 변화를 간접적 방법이 아닌 직접적으로 측정 가능한 현장수리시험장비를 소개하고 국내 지하연구시설(URL) 현장실험에 적용한 결과를 수록하였다. 굴착공동 주변 수리학적 EDZ의 투수계수 측정의 정밀도 향상을 위해서는 잘 설계된 시험장비와 함께 시험결과를 분석 평가하는 기술이 통합된 시스템 개발이 필요할 것으로 생각된다. 이를 통해 지하수면 아래 건설되는 공동의 안정성 평가, 방배수 시스템 및 그라우팅 설계의 신뢰도 향상에 기여할 수 있을 것으로 기대된다.

결정질암체의 수리전도도에 대한 규모종속에 관한 분석 (Analysis on Scale Effects to Hydraulic Conductivities in Crystalline Rock)

  • 박동극
    • 지질공학
    • /
    • 제4권1호
    • /
    • pp.13-28
    • /
    • 1994
  • 파쇄대를 포함하고 있는 결정암체의 수리전도(K)는 현장조사에 의해서 기초자료가 얻어지고 해석학적 방법에 의해서 규명된다. 이러한 현장조사 방법 및 절차는 조사 목적 및 현장여건 그리고 결정암체의 특성에 따라서 결정된다. 파쇄대나 절리등의 불연속면을 포함하고 있는 결정질암체에서의 수리전도도는 주로 패커시험(Packer teat)과 스러그시험(Slug test)으로 결정한다. 동일 시험공에서 패커시험의 시험간격을 좁게 할수록 정상류 해석법에 의한 수리전도도가 켜지는 경향을 나타내며 Hvorslev의 이론에 부합되는 증거로서, 동일 시험공내에서도 주입구간의 간격에 따라서 수리전도도는 규모종속(scale effect)을 나타낸다고 할 수 있다. 또한 시험 순서에 따라서 수리전도도의 변화를 나타낸다고 할 수 있다. 수리지질할적으로 주요 불연속면이 포함된 패커시험구간에서 수리전도도의 수직분포를 볼때,패커시험간격을 달리한다고 하더라도,이러한 불연속면을 포함한 구간에서는 수리전도도의 상대적인 이상대를 나타낸다.스러그시험과 패커시험으로 구한 시험정의 전구간 평균수리전도도를 비교해 볼 때,일반적으로 상당히 부함되는 값을 나타낸다.

  • PDF

현장직접전단시험기의 개발 및 현장적용에 관한 연구 (Development of an In Situ Direct Shear Test Apparatus and Its Field Application)

  • 김용필;이영균;이성국;엄정기
    • 터널과지하공간
    • /
    • 제21권3호
    • /
    • pp.181-191
    • /
    • 2011
  • 단층대, 파쇄대 또는 풍화대가 발달한 암반은 실내시험을 위한 시료 성형이 어렵다. 기존에 현장에서 수행된 직접전단시험은 갱도 내벽의 수직반력을 이용하여 수행되었다. 이 연구에서 개발된 현장직접전단시험기는 터널내부 또는 노천의 현장상태 암반에서 시험을 수행할 수 있다. 현장직접전단시험기의 주요 구성은 전단하중 반력판 및 하중전달판, 유압실린더 시스템, 로드셀, 다단계 전단상자, 전단상자 고정장치, 수직하중 반력판 및 하중전달판, 마찰저항 감소용 롤러 등이다. 공시체는 각주형의 블록으로 최대 크기는 $400{\times}400{\times}460$ mm이며 현장에서 형성하는 방법 및 절차가 제시되었다. 개발된 시험기의 현장적용성 평가를 위하여 연구지역에 대한 지질공학적 조사 분석 연구를 통하여 성능시험을 위한 공시체 형성에 적합한 위치가 선정되었다. 현장적용 결과 개발된 현장용 시험기는 암석의 강도 및 변형과 관련하여 필요한 대부분의 정보를 제공할 수 있는 성능을 확보하였음을 확인하였다.

수압파쇄시험에 의한 산악지역에서의 현지 암반 초기응력 측정 및 분포특성 연구 (Study on Characteristics of In-situ Rock Stress State in Mountainous Region by Hydraulic Fracturing Method)

  • 배성호;전석원;최용근;김학수
    • 한국터널지하공간학회 논문집
    • /
    • 제4권1호
    • /
    • pp.57-70
    • /
    • 2002
  • 국토의 65 % 이상이 산악으로 구성된 이유로 90년대 이후 산악지형의 암반을 대상으로 한 대규모 교통터널, 에너지 비축시설 및 산업용 저장소와 같은 대형 토목구조물의 필요성이 크게 증가하고 있다. 암반내 시공되는 토목 구조물의 설계과정에서 현지 암반의 초기응력장에 대한 정량적인 자료가 주요한 핵심요소로 작용하며 이러한 초기응력장에 대한 제반 정보를 획득하기 위한 목적으로 국내에서는 정밀 지반조사 과정에서 수압파쇄법이 대표적으로 사용되고 있다, 본 논문에서는 국내 각지의 산악지형에서 얻어진 수압파쇄시험 현장 측정 자료들에 대한 해석결과를 바탕으로 국내 산악지형의 암반내 초기응력 분포 특성에 대한 분석을 수행하였다.

  • PDF

International Joint Research for the Colloid Formation and Migration in Grimsel Test Site: Current Status and Perspectives

  • Sang-Ho Lee;Jin-Seok Kim;Bong-Ju Kim;Jae-Kwang Lee;Seung Yeop Lee;Jang-Soon Kwon
    • 방사성폐기물학회지
    • /
    • 제20권4호
    • /
    • pp.455-468
    • /
    • 2022
  • Colloid Formation and Migration (CFM) project is being carried out within the Grimsel Test Site (GTS) Phase Ⅵ. Since 2008, the Korea Atomic Energy Research Institute (KAERI) has joined CFM to investigate the behavior of colloid-facilitated radionuclide transport in a generic Underground Research Laboratory (URL). The CFM project includes a long-term in-situ test (LIT) and an in-rock bentonite erosion test (i-BET) to assess the in-situ colloid-facilitated radionuclide transport through the bentonite erosion in the natural flow field. In the LIT experiment, radionuclide-containing compacted bentonite was equipped with a triple-packer system and then positioned at the borehole in the shear zone. It was observed that colloid transport was limited owing to the low swelling pressure and low hydraulic conductivity. Therefore, a postmortem analysis is being conducted to estimate the partial migration and diffusion of radionuclides. The i-BET experiment, that focuses more on bentonite erosion, was newly designed to assess colloid formation in another flow field. The i-BET experiment started with the placement of compacted bentonite rings in the double-packer system, and the hydraulic parameters and bentonite erosion have been monitored since December 2018.

순간변위시험(slug test)시 연직차수벽의 현장투수계수를 산정하기 위한 형상계수 연구 (General Steady-State Shape Factors in Analyzing Slug Test Results to Evaluate In-situ Hydraulic Conductivity of Vertical Cutoff Wall)

  • 임지희;이동섭;윙 테 바오;최항석
    • 한국지반공학회논문집
    • /
    • 제27권10호
    • /
    • pp.105-116
    • /
    • 2011
  • 지금까지 순간 변위시험 (slug test)를 이용해 연직차수벽의 현장투수계수를 평가할 수 있는 이론해는 제시된 바가 없다. 최근 부분 관입된 우물(well)형상에 적용 가능한 이론해에 관한 연구가 발표되었으나, 이는 무한 경계조건인 대수층에만 국한되고 좁은 벽체형상의 연직차수벽의 경계 조건에는 그대로 적용될 수 없다. 이러한 연직차수벽 경계조건을 고려하기 위해, 본 연구에서는 가상 우물법(method of imaginary well)을 도입하여 기존 이론해를 수정하였다. 연직차수벽의 경계조건은 기존 문헌에서 제시한 두 가지 조건을 적용하였다. 첫 번째 경계조건은 연직차수벽 경계에 일정 수두 조건을 적용하고, 두 번째는 경계면에 불투수 경계조건을 적용하였다. 본 논문에서는 연직차수벽의 현장투수계수를 평가할 수 있도록 각 경계조건에 대하여 정상 상태 조건에 대한 일반적인 형상계수를 제시하였다. 첫 번째 경계조건의 경우, 연직차수벽의 투수계수가 연직차수벽이 존재하지 않는 대수층 조건보다 크게 평가되었으며, 두 번째 방법의 경우는 더 작게 평가되었다. 본 연구에서 제시한 수정 이본해를 통해 얻어진 투수계수는 경험식을 바탕으로 무한 대수층에 적용하기 위해 제안된 Bouwer and Rice 방법을 보정하여 다양한 연직차수벽 경계조건에 대해 실제 현장투수계수가 Bouwer and Rice 방법에 의한 결과 보다 1.2~1.7배 큼을 확인하였다. 또한, 연직차수벽 뒷채움재의 압축성을 고려한 기존 해석결과와 비교로부터, 본 논문에서 제시한 이론해는 뒷채움재가 비압축성에 상응하는 값을 제시하는 것을 확인할 수 있었다.

Rock Permeability Estimation from Hydraulic Injection Tests in a Sealed Borehole Interval

  • Quach, Nghiep Q.;Jo, Yeonguk;Chang, Chandong
    • 지질공학
    • /
    • 제28권1호
    • /
    • pp.1-9
    • /
    • 2018
  • We propose a borehole test technique to estimate permeability of rocks in borehole. The borehole tests are hydraulic injection tests such as leak-off test and hydraulic fracturing tests, which are originally conducted for stress or casing integrity assessment and not for permeability measurement. We use one-dimensional radial diffusion equation to interpret fluid injection test results in terms of permeability. We apply this technique to a leak-off test conducted at a depth of 700 m in a wellbore, where rock formation is mudstone. The estimated permeability is at an order of $10^{-16}m^2$, which is somewhat high but within the range reported for mudstones previously. Quantitative rick assessment suggests that an accurate measurement of open hole section length is important to improve reliability of results. More data may be needed to ensure the reliability of this technique. If validated, however, this technique can provide cost-effective estimation of in situ permeability without conducting independent permeability tests in borehole.

Estimating coefficient of consolidation and hydraulic conductivity from piezocone test results - Case studies

  • Hossain, Md. Julfikar;Chai, Jinchun
    • Geomechanics and Engineering
    • /
    • 제6권6호
    • /
    • pp.577-592
    • /
    • 2014
  • The methods for estimating in-situ hydraulic conductivity ($k_{hp}$) and coefficient of consolidation ($c_{hp}$) in the horizontal direction from piezocone penetration and dissipation test results have been investigated using test results at two sites in Saga, Japan. At the two sites the laboratory values of hydraulic conductivity ($k_v$) and coefficient of consolidation ($c_v$) in the vertical direction are also available. Comparing $k_{hp}$ with $k_v$ and $c_{hp}$ with $k_v$ values, suitable methods for estimating $k_{hp}$ and $c_{hp}$ values are recommended. For the two sites, where $k_{hp}{\approx}k_v$ and $c_{hp}{\approx}2c_v$. It is suggested that the estimated values of $k_{hp}$ and $c_{hp}$ can be used in engineering design.

대구경 샘플러의 개발 및 채취시료의 성질 분석 (Development of Large Diameter Sampler and Analysis of Sampling Soil Character)

  • 김영진;홍성완;김현민
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 가을 학술발표회 논문집
    • /
    • pp.353-360
    • /
    • 2000
  • We developed large diameter sampler (we called KICT type large diameter sampler) to obtain undisturbed clay and sand samples. In-situ test carried out in the In-Chon international airport and Kim-Hae. Also we obtained undisturbed sample with a hydraulic piston sampler in the nearly site and carried out unconfined compression test, consolidation test and triaxial test. The result, unconfined compression strength, secant modules, preconsolidation pressure and undrained shear strength of samples to obtain KICT type large diameter sampler are larger than that of samples to obtain hydraulic piston sampler. But failure strains and volume changes at the consolidation of samples to obtain KICT type large diameter sampler are smaller than that of samples to obtain hydraulic piston sampler

  • PDF