• Title/Summary/Keyword: in-situ construction

Search Result 564, Processing Time 0.03 seconds

Concrete Pavement for the Access Road using Recycled Concrete Aggregate Crushed in-situ (현장파쇄 재생골재를 사용한 부체도로 콘크리트 포장)

  • Shim Jae Won;Kim Jin Cheol;Jo Kyu Seong;Choi Kang Sick
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.348-351
    • /
    • 2004
  • In this study, the recycled concrete aggregates crushed in-situ were used for the access road pcc (portland cement concrete) pavement. Based on laboratory results, the properties of materials, mixture proportioning, blend rates, and application conditions were investigated prior to trial application, and the various problems on recycled concrete aggregate under construction have been comprehensively checked.

  • PDF

Micro Computer Tomography Applied Monotonic Pullout Test for Deformed Rebar Bonding Model (이형 철근의 콘크리트 부착 모델 수립을 위한 Micro-CT 활용 단조가력 시험)

  • Jang, Indong;Cho, Junghyun;Yi, Chongku
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.192-193
    • /
    • 2020
  • In reinforced concrete adhesion studies, the demolition of the specimen is inevitably involved, and the studies conducted are limited to the macro load-displacement analysis. In order to establish an elaborate model for concrete bonding reinforced rebars, it is necessary to observe the rebar bonding behavior in the in-situ state. In this study, specially manufactured reinforcing bars, micro-UTM and 𝝁-computer tomography (𝝁CT) are used to observe reinforcing bars in the in-situ state. As a result of the monotonic pullout test of the processed reinforcing bar, maximum bond stress were shown to be 16.7MPa, which is slightly higher than the existing 10 to 12 MPa, and then the empty space inside the specimen in which the pullout test was conducted using 𝝁CT was confirmed. Through additional research, the fracture phenomenon of concrete excluding voids will be studied.

  • PDF

Review of the Sintering Technologies Using In-situ Resources for Lunar Construction and Future Works (달 기지 건설을 위한 현지재료 활용 소결 기술 및 향후 과제)

  • Ryu, Geun U;Kim, Young-Jae;Shin, Hyu-Soung
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.50 no.12
    • /
    • pp.839-856
    • /
    • 2022
  • Over the last decade, the competition for space development has accelerated. The world's largest space agencies are aiming toward long-term lunar exploration and manned missions. For sustainable and safe lunar exploration, construction of infrastructures that include various habitats is essential. However, transporting construction materials from Earth for lunar base construction is extremely expensive. Thus, technologies for manufacturing construction materials using in-situ resources from the moon should be advanced. The sintering techniques have been actively studied using lunar soil. In this review, five sintering technologies, including radiation, solar, spark plasma, laser, and microwave sintering, for manufacturing construction materials using lunar soil are introduced, and future research is discussed.

Geotechnical parameters from pressuremeter tests for MRT Blue Line extension in Bangkok

  • Likitlersuang, Suched;Surarak, Chanaton;Wanatowski, Dariusz;Oh, Erwin;Balasubramaniam, Arumugam
    • Geomechanics and Engineering
    • /
    • v.5 no.2
    • /
    • pp.99-118
    • /
    • 2013
  • Construction of the extension project of the Bangkok MRT Blue Line underground railway was recently started in 2011. The construction of approximately 5 km long underground tunnel and 4 deep excavations of underground station are considered to be the most important geotechnical works. The pressuremeter was selected as a high-quality in situ testing of the soil to evaluate design parameters for the project. In addition, other field and laboratory tests such as vane shear and $CK_0U$ triaxial tests were included in the investigation programme. This paper aims to present the ground conditions encountered along the MRT Blue Line extension project as well as the site investigation and interpretation techniques with particular focus on the pressuremeter tests. The results are also compared with the pressuremeter investigation from the previous Bangkok MRT project.

A Study on the Behavior Prediction of Underground Structures by Back Analysis (역해석에 의한 지하구조체의 거동예측에 관한 연구)

  • 장정범;김문겸
    • Tunnel and Underground Space
    • /
    • v.8 no.2
    • /
    • pp.139-145
    • /
    • 1998
  • The reliable estimation of the system parameters and the accurate prediction of the system behavior are important to design underground structures safely and economically. Especially, the elastic modulus and the in-situ stresses are very important parameters in predicting the behavior of the underground structure. Therefore, the back analysis using the field measurement data is developed to determine accurately the elastic modulus and the in-situ stresses of the underground structural system in this study. A back analysis using the combined finite and boundary element is developed. It can consider the far field boundary condition and is efficient in computation. In this study, a back analysis is performed to predict behaviors of underground structures for the real construction site. The comparison between the results of the back analysis with field measurement data and the obtained material properties from the field test shows good agreement for the real construction site.

  • PDF

Mechanical behavior of an underground research facility in Korea Atomic Energy Research Institute

  • Kwon S.K.;Cho W.J.;Hahn P.S.
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2005.11b
    • /
    • pp.245-252
    • /
    • 2005
  • An underground research facility (KURF) is under construction at KAERI for the in situ studies related to the validation of a HLW disposal system. For the safe construction and long-term researches at KURF, mechanical stability of the facility should be evaluated. In this study, 3D mechanical stability analysis using the rock mass properties determined from various in situ as well as laboratory tests was carried out. From the analysis, it was possible to predict the rock deformation, stress concentration, and plastic zone developed before and after the excavation. A test blasting was performed to characterize the site dependent dynamic response, which can be used for the prediction of the blasting impact on the facilities in KAERI.

  • PDF

A Decade's Experiences on the Hydrofracturing In-Situ Stress Measurement for Tunnel Construction in Korea (암반터널 설계를 위한 수압파쇄 초기지압 측정의 10여년 간의 경험)

  • Choe, Seong-Ung;Park, Chan;Sin, Jung-Ho;Sin, Hui-Sun
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2008.03a
    • /
    • pp.79-88
    • /
    • 2008
  • Since the hydraulic fracturing field testing method was introduced first to Korean geotechnical engineers in 1994, there have been lots of progresses in a hardware system as well as an interpretation tool. The hydrofracturing system of first generation was the pipe-line type, so it was not easy to handle. It had been modified to a wire-line system at their second generation. It was more compact one but it also needed an additional air-compressor. Our current system is much more compact and operated by all-in-one system, so it doesn't need an additional air-compressor. With a progress in a hardware system, the software for analyzing the in-situ stress regime has also been progressed. For example, the shut-in pressure, which is the most ambiguous parameter to be obtained from hydrofracturing pressure curves, can now be acquired automatically from the various methods. While the hardware and software for hydrofracturing tests are being developed during the last decade, the author could accumulate the field test results which can cover the almost whole area of South Korea. Currently these field data are used widely in a feasibility study or a preliminary design step for tunnel construction in Korea. Regarding the difficulties in a site selection and a test performance for the in-situ stress measurement at an off-shore area, the in-situ stress regime obtained from the field experiences in the land area can be used indirectly for the design of a sub-sea tunnel. From the hydrofracturing stress measurements, the trend of magnitude and direction of in-situ stress field was shown identically with the geological information in Korea.

  • PDF

A Study on Load Transfer between Soil and Nail Using In-situ Pull-out Tests (현장인발시험을 통한 흙-네일의 하중 전이특성에 대한 연구)

  • Kim, Jong-Soo;Yi, Chang-Tok;Min, Kyong-Jun;Lee, Song
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.167-174
    • /
    • 1999
  • A Land slide in Granitic Gneiss weathered soil was stabilized successfully with soil nailing using 929mm steel bar. To understand the behavior of load transfer between soil and nail, in-situ pdl-out tests were carried out. The strains of steel bars were measured using strain gauges during pull-out tests. Forces-strain data from laboratory tension tests on steel bar and grouted steel bar were examined to compare with those of the pull-out tests. Comparisons were made between the pull-out test results and laboratory test result to understand load transfer mechanism.

  • PDF

Study on Characteristics of In-situ Rock Stress State in Mountainous Region by Hydraulic Fracturing Method (수압파쇄시험에 의한 산악지역에서의 현지 암반 초기응력 측정 및 분포특성 연구)

  • Bae, Seong-ho;Jeon, Seok-won;Choi, yong-kun;Kim, Hak-soo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.1
    • /
    • pp.57-70
    • /
    • 2002
  • Since early in the 90's, the need for construction of underground rock structures such as long and large section traffic tunnel, energy storage cavern, industrial facility, etc. has been largely increased because the Korean territory is not wide and about 65 % of the land consists of mountainous region. The initial rock stress measurement has been widely conducted to provide the quantitative information on the stress state of engineering site at the design stage of underground rock structures. Among the diverse methods developed for measuring rock stress, hydraulic fracturing test is most popularly used because it is applicable at pre-construction stage and has no limit in testing depth. In this paper, the characteristics of initial rock stress state in mountainous region were studied on the basis of the in-situ hydraulic fracturing stress measurement results from the 60 test boreholes in various parts of Korea.

  • PDF

An Application of VRS-RTK Surveying in Construction Site (건설현장에서의 VRS-RTK측량 적용성 검토)

  • Kim, In-Seup;Joo, Hyun-Seung
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.6
    • /
    • pp.625-631
    • /
    • 2008
  • Correct evaluation of cut and fill volume of soil is one of the most important factors which controls construction cost in enormous construction sites. To achieve accurate computation of soil volume in construction site precise surveying is required, however most of construction sites adopt existing optical surveying instruments such as Total Station. The problem when using these optical instruments in construction sites is that these instruments take longer time in data acquisition. Due to insufficiency of computation time accurate and precise observation cannot be accomplished with these equipments. As a result roughly calculated earthwork volume may cause arguments between contractors and supervisors in the matter of reduction or increasement of total construction cost. In this study VRS-RTK Surveying is adopted to perform fast and accurate in-situ surveying for rapid computation of soil volume. This VRS-RTK Surveying system is proved to have more accurate three dimensional coordinates with high density and better economical solution with less manpower.