• Title/Summary/Keyword: harbor construction project

Search Result 19, Processing Time 0.027 seconds

Consideration of Surveying the Site for Lighthouse in Harbor Plan (항만계획에 있어서 등대부지측량의 고찰)

  • 장용구;이중우;강인준;이호
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.225-233
    • /
    • 1999
  • Harbor design and construction plan in Korea becomes the most hot issue both in the Maritime Affairs and Fisheries Office and in the related port industries. Production of the plane and cross section maps together with the profile map for harbor project is done firstly and is important in all procedure because it is the most basic datum in counting the constructional expense for determination of the area and capacity. As the expense assigned on surveying part among the total expenses of harbor planning and construction in Korea is very small, it is difficult to make exact maps. Moveover, because the method used to make such maps is mostly traditional surveying such as plane table surveying , offset surveying, stadia surveying and level surveying, etc, it is difficult to get precise three dimensional maps. Therefore, for making more precise map in the harbor project, we have to use the newest surveying equipment. This study discusses the method of old surveying and recent surveying used for the three dimensional map of the site for lighthouse which gives navigational aids for the in-and out-bound ships. The authors are proposing a method for more precise three dimensional positioning in this study.

Project Risk Management & Observational Method for soft ground improvement (연약지반을 대상으로 한 프로젝트 리스크와 현장계측의 과제와 대책)

  • Imanishi, Hajime
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.509-514
    • /
    • 2006
  • Considering the risk management, there are many examples and various studies for the corporation risk. However, I have never seen the project risk management that applied a construction site for practical approach. Therefore, I have developed a chart (I-Chart) for the project risk management, and also built a model (I-Chart scenario analysis) that I could use. I applied this model to container yard reclaimed land in harbor construction with approaching of geotechnical engineering.

  • PDF

The Application Plan for Value Engineering Redesign by Using The Simulation for The Port Facilities Construction Project (항만시설 프로젝트의 시뮬레이션을 활용한 재설계 VE 적용방안)

  • Yoon, Moo-Hee;Ahn, Kyung-Soo
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.19 no.6
    • /
    • pp.533-546
    • /
    • 2007
  • This paper studied the design VE (Value Engineering) process among the various methods to satisfy the requirement of user and cost saving in the overall redesign process for the Turn-key base construction project. This study has been estabilished the rational and practical analysis process with the stepwise by using the design VE process. The efficiency and safety were verified with the adoptian of computer simulation to cope with the problem of initial analysis and verification for design VE process in the large construction project. In the previous design VE process, there is a limitation for the analysis of design VE in the planing stage and the execution time period of the large construction project. The previous application of VE technique was only for the construction of harbor facilities, so there was no contribution of cost saving in the function and construction. However, this paper proposed the selection methodology of VE items and hence the redesign VE process can be efficiently improved. It can be also improved the process of functional analysis rationally and practically. About 4.6 billion won has been saved with applying to the harbor construction project with using the VE method proposed in this paper. The study gives the direction of VE to be accomplished efficiently in the similar project.

Establishment present of fish-road in Kangwondo and Study to apply fish-road is ice harbor 1-type (강원도 어도의 설치 현황 및 I형 아이스하버식 어도 적용성 연구)

  • Choi, Han-Kuy;Choi, Young-Soo;Jeon, Young-Soo
    • Journal of Industrial Technology
    • /
    • v.26 no.B
    • /
    • pp.63-71
    • /
    • 2006
  • The concerned object of the construction industry is environment. It is one of the main purposes of today's construction that human can live reasonably in nature. This study is about the fish-road connecting hydraulic structure in the river with nature. Chapter 2, starting with the general investigation about fish-road and helps comprehension for relatively general fish-road such as necessity, establishment purpose, history, study example, relating domestic law, design condition, consideration and form of fish-road. Chapter 3, containing the present condition of fish-road facilities in Gangwon-Do and thoughts of the problems and general countermeasures of existing fish-road. Chapter 4, Having Examined compatibility by amount of flowing water through hydraulic model test in the Ice harbor I-type model. chapter 5, Analyzation and arrangement to efficient establishment plan of fish-road and the result of the hydraulic model experiment to be beaconed a little in forward fish-road study. In the hydraulic model test result, when we suppose establishment of 1~3 in slope of 1/20, could know that applicable drought flow of the river is $0.06{\sim}3.0m^3/sec$ in case of Ice harbor I-type which transforming Ice harbor that was invented as studying project of the Ministry of Environment.

  • PDF

Study on Ship Safety Pilotage in Shanghai Harbour by Way of FSA

  • Quangen, Fang;Zhenghua, Chen;Shenping, Hu;Yidong, Xue
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.10a
    • /
    • pp.11-18
    • /
    • 2006
  • Ship Pilotage is one of the most important parts in the construction and development of Shanghai International Shipping Center as it has the fundamental function for the promotion and speed-up of the ship navigation and cargo operation. Recently, Shanghai Maritime University and Shanghai Harbour Pilotage Administration Station had carried out a research project of 'Study on Ship Safety Pilotage in the Shanghai Harbour by Way of FSA (Formal Safety Assessment)'. The aim of this project is to put out some proposes of the decision-making for the improvement of the safety pilotage in Shanghai habour through the way of the FSA. Now these proposes of the decision-making have been adopted and conducted in practice and satisfactory results have been achieved. In the paper, some detailed information, methods and ideas about this research project have been introduced and explained for improving the safety pilotage in Shanghai Harbour.

  • PDF

Optimal Calculation of Size of Harbor Facility ensuring Maximum Resident's Participation using SNS and ICT (SNS와 ICT를 활용한 주민 참여를 최대한 보장하는 최적 항만 시설 규모 산정)

  • Park, Sang-Goul;Hwang, Chan-Gyu
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.9 no.10
    • /
    • pp.1153-1159
    • /
    • 2014
  • In this paper we propose novel method for cost of harbor facility of redevelopment of Mookho harbor at Donghae city by using ICT(Information Communication Technology) and Social Network System that is able to participate most residents instead of partly participation for harbor development. In order to do this, we analyze urban marketing which was maximally reflected opinion of resident by using previous simple questionnaire as well as various SNS (Social Network System) as method of effective resident's participation in process harbor redevelopment. We perform optimal selection for ratio of resident's participation. We also propose calculation of optimal construction cost and method of urban marketing.

A Study on Environmental Impact Assessment Guidelines for Marine Environments in Harbor Construction Projects (항만건설사업의 해양환경 환경영향평가 가이드라인 개발 연구)

  • Maeng, Junho;Kim, Taeyun;Lee, Haemi
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.3
    • /
    • pp.141-160
    • /
    • 2022
  • The harbor construction projects can lead to various marine environmental problems including habitat degradation and loss, marine water pollution, change of flow patterns, erosion, scour, sedimentation, and so on. The EIA is a measure to prevent various environmental problems in advance from examining and minimizing the environmental impacts before the proposed developments are implemented. In addition, institutions reviewing EIA reports have made efforts to conduct scientific and standardized EIA by applying EIA guidelines for each project. This study aims to create a EIA guideline focusing on the harbor construction projects. Based on the review comments of the harbor construction EIA reports for the past 13 years (2009-2021) and the EIA guidelines of different types of projects, we identified the marine environmental problems and provided the appropriate guideline. This guideline summarizes and presents the contents which must be reviewed in the baseline condition survey, impact assessment, mitigation, and post-environmental impact investigation in the fields of marine fauna and flora, marine physics, and marine water and sediment quality. In the case of a baseline condition survey of marine fauna and flora, a method for selecting survey points considering the characteristics of sea area and project was presented. When estimating the impact of marine fauna and flora, we presented methods for predicting the impact on them due to the spread of suspended sediments and the damage to benthic habitats due to dredging and reclamation. In consideration of the characteristics of the sea area, we divided the survey items of the marine physics into essential items and supplementary items. In predicting the impact of marine physics, various methods for major issues such as seawater circulation, suspended sediment and bottom sediment transport, water temperature and salinity diffusion, seawater exchange, wave transformation, harbor tranquility, and shoreline change were presented. The research results will contribute to protect the marine environment by inducing more systematic and scientific surveys, impact assessments, and mitigation in the EIA process.

Design Structure Matrix: A Model Proposal and Implementation on Harbor and Building Design Project

  • Akram, Salman;Kim, Jeonghwan;Pi, Seungwoo;Seo, Jongwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.144-152
    • /
    • 2013
  • Design is an iterative, generative, and multidisciplinary process by its nature. Iteration occurs often in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. Contrary to simple design, isolation of the generative iterations in complex design systems is very difficult, but reduction in overall iterations is possible. Design depends upon the information flow within domain and also among various design disciplines and organizations. Therefore, it is suggested that managers should be aware about the crucial iterations causing rework and optimal sequence as well. In this way, managers can handle design parameters related to such iterations pro-actively. There are a number of techniques to reduce iterations for various kinds of engineering designs. In this paper, parameter based Design Structure Matrix (DSM) is chosen. To create this DSM, a survey was performed and then partitioned using a model. This paper provides an easy approach to those companies involved in or intend to be involved in "design and build projects".

Corrosion rate measurement of multiple reinforcements using the galvanostatic pulse technique with the guard ring

  • Weichung YEIH;Jiang-Jhy CHANG;Tai-An CHEN
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.224-230
    • /
    • 2024
  • This study investigates the corrosion rate measurements for multiple reinforcements in concrete by using the galvanostatic pulse technique. In order to know whether or not this technique can distinguish corrosion status for multiple reinforcements covered by the guard ring, two programs were conducted. For the first stage, a reinforcement was embedded in two concrete blocks and the part of reinforcement in one of the block was in a corrosion environment while another part of reinforcement in another block was not in a corrosion environment. Results reconfirmed that the galvanostatic pulse technique detected the local corrosion current owing to the help from guard ring. For the second stage, two parallel reinforcements (one epoxy-coated reinforcement and one plain reinforcement) were embedded in a chloride contaminated concrete block. Results showed that when two reinforcements were covered by guard ring, the galvanostatic pulse technique could not distinguish the corrosion current for each individual reinforcement and an average value would be obtained. In such a case, for the reinforcement which was not corroded one may overestimate its corrosion rate, and for the reinforcement which was corroded one may underestimate its corrosion. Therefore, results imply that a C-scan method (which is commonly used for the ultrasonic testing) may be required to obtain a correct measurement of corrosion rate.

Investment Ranking Decision Using MCDA in Dam Projects (MCDA 기법을 이용한 댐사업의 투자우선순위 결정)

  • Kim, Woo-Gu;Lee, Gwang-Man;Park, Doo-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.12 s.173
    • /
    • pp.1067-1080
    • /
    • 2006
  • In empirical evaluations of public projects and public provided goods, MCDA(multicriteria decision-making analysis) has helped decision makers with an adequate policy decision-making tool since it allows taking into account a wide range of assessment criteria. As a tool for decision-making of conflict management, MCDA has demonstrated its usefulness in many public projects such as road, dam and harbor construction. In this study, to use this merit of MCDA, dam project assessment indicators from points of social, economic, environmental and practical views are developed based on sustainable development of water resources, and weighting factors are also estimated by means of questionnaire survey. In order to decide project investment rank, developed evaluation indicators are applied to 6 existing dams under investigation for a rehabilitation project. In addition to, it is recognized that the project practicability has become more important indicator as well as environmental and social issues. This is because cooperation and support from a local government and people are regarded as one of the most important problems in public projects recently.