Abstract
The harbor construction projects can lead to various marine environmental problems including habitat degradation and loss, marine water pollution, change of flow patterns, erosion, scour, sedimentation, and so on. The EIA is a measure to prevent various environmental problems in advance from examining and minimizing the environmental impacts before the proposed developments are implemented. In addition, institutions reviewing EIA reports have made efforts to conduct scientific and standardized EIA by applying EIA guidelines for each project. This study aims to create a EIA guideline focusing on the harbor construction projects. Based on the review comments of the harbor construction EIA reports for the past 13 years (2009-2021) and the EIA guidelines of different types of projects, we identified the marine environmental problems and provided the appropriate guideline. This guideline summarizes and presents the contents which must be reviewed in the baseline condition survey, impact assessment, mitigation, and post-environmental impact investigation in the fields of marine fauna and flora, marine physics, and marine water and sediment quality. In the case of a baseline condition survey of marine fauna and flora, a method for selecting survey points considering the characteristics of sea area and project was presented. When estimating the impact of marine fauna and flora, we presented methods for predicting the impact on them due to the spread of suspended sediments and the damage to benthic habitats due to dredging and reclamation. In consideration of the characteristics of the sea area, we divided the survey items of the marine physics into essential items and supplementary items. In predicting the impact of marine physics, various methods for major issues such as seawater circulation, suspended sediment and bottom sediment transport, water temperature and salinity diffusion, seawater exchange, wave transformation, harbor tranquility, and shoreline change were presented. The research results will contribute to protect the marine environment by inducing more systematic and scientific surveys, impact assessments, and mitigation in the EIA process.
Keywords
Harbor construction project; Maine environment; Environmental impact assessment (EIA); Marine fauna and flora; Marine physics; Guideline;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Chungcheongnam-do. 2010. The Environmental Impact Assessment Report for the Regional Fishing Port (Mongsanpo Port) Development Plan (draft).
2 Chungcheongnam-do. 2011. The Environmental Impact Assessment Report for the Regional Fishing Port (Mongsanpo Port) Development Plan.
3 Yeosu Regional Maritime Affairs and Port Office. 2010b. The Environmental Impact Assessment Report for the Gwangyang (Yucheon) Port Route Dredging Project (re-consultation).
4 MOF Official Blog. https://blog.naver.com/koreamof/222642285585 (2022.03.08. accessed)
5 Daesan Regional Office of Oceans and Fisheries. 2018. The Environmental Impact Assessment Report for the Daesan Port Management Pier Construction.
6 Chungcheongnam-do. 2018. The Environmental Impact Assessment Report for the Regional Fishing Port (Hagampo) Development Plan Changes (draft).
7 Daesan Regional Office of Oceans and Fisheries. 2017b. The Environmental Impact Assessment Report for the Oeyeondo Port Maintenance Work (draft).
8 Daesan Regional Office of Oceans and Fisheries. 2017c. The Environmental Impact Assessment Report for the Oeyeondo Port Maintenance Work.
9 GS Caltex Corporation. 2017. The Environmental Impact Assessment Report for the GS Caltex 3rd Product Pier Dredging Project.
10 Gunsan Regional Office of Oceans and Fisheries. 2010a. The Environmental Impact Assessment Report for the Janghang Port Maintenance Work (draft).
11 Gunsan Regional Office of Oceans and Fisheries. 2010b. The Environmental Impact Assessment Report for the Janghang Port Maintenance Work.
12 Pohang Regional Office of Oceans and Fisheries. 2016a. The Environmental Impact Assessment Report for the Ganggu Port Development Project (draft).
13 Daesan Regional Office of Oceans and Fisheries. 2017a. The Environmental Impact Assessment Report for the Daesan Port Management Pier Construction (draft).
14 Yeosu Regional Maritime Affairs and Port Office. 2010a. The Environmental Impact Assessment Report for the Gwangyang (Yucheon) Port Route Dredging Project (re-consultation) (draft).
15 Pohang Regional Office of Oceans and Fisheries. 2017. The Environmental Impact Assessment Report for the Ganggu Port Development Project (supplementation).
16 Pyeongtaek Regional Maritime Affairs and Port Office. 2010a. The Environmental Impact Assessment Report for the Asan Industrial Base Port Development Project (reconsultation) (draft).
17 Pyeongtaek Regional Maritime Affairs and Port Office. 2010b. The Environmental Impact Assessment Report for the Asan Industrial Base Port Development Project (reconsultation).
18 Tac DH, Oh HY, Kim GY, Lee DI. 2015. Assessment and Improvement of Documentation Status on the Statements for the Sea Area Utilization Consultation according to the Project of Ports and Fishery Harbors. Journal of the Korean Society of Marine Environment & Safety 21(4): 361-371.   DOI
19 West Sea Fisheries Management Service, Incheon Fishing Port Office. 2010b. The Environmental Impact Assessment Report for the Anheung Port Maintenance Project.
20 EIASS (Environmental Impact Assessment Information Suport System). https://eiass.go.kr (2019.05.13. accessed).
21 IFEZ (Incheon Free Economic Zone). 2009a. The Environmental Impact Assessment Report for the Songdo District 11 Public Water Reclamation Project (draft).
22 Gunsan Regional Office of Oceans and Fisheries. 2017. The Environmental Impact Assessment Report for the Eocheongdo Port Maintenance Work (draft).
23 Gyeongsangbuk-do. 2016. The Environmental Impact Assessment Report for the Gagok Port Maintenance Work (draft).
24 Gyeongsangbuk-do. 2017. The Environmental Impact Assessment Report for the Gagok Port Maintenance Work.
25 IFEZ (Incheon Free Economic Zone). 2009b. The Environmental Impact Assessment Report for the Songdo District 11 Public Water Reclamation Project.
26 IPA (Incheon Port Authority). 2009. The Environmental Impact Assessment Report for the Incheon South Port International Passenger Pier and Terminal Construction Project.
27 KEI (Korea Environment Institute). 2002. A Study on Reasonable Estimation and Assessment Method of Environmental Impact.
28 KEI (Korea Environment Institute). 2015. A Study on Environmental Impact Assessment Guidelines for Environment-Friendly Projects of Thermal Power Plant.
29 Lee DI, Park DS, Eom KH, Kim GY, Cho HS, Kim JK, Seo YK, Baeck GW. 2009. Improvement of the Marine Environmental Assessment for Dredging and Ocean Disposal of Coastal Sediment in Korea. Journal of Environmental Impact Assessment 18(3): 131-141.
30 KMI (Korea Maritime Institute). 2006. A Study on the Development of Marina in Multifunctional Fishing Port.
31 Masan Regional Office of Oceans and Fisheries. 2017a. The Environmental Impact Assessment Report for the Wonjeon Port Maintenance Project (draft).
32 Masan Regional Office of Oceans and Fisheries. 2017b. The Environmental Impact Assessment Report for the Wonjeon Port Maintenance Project.
33 Mokpo Regional Maritime Affairs and Port Office. 2009. The Environmental Impact Assessment Report for the Mokpo Port Entry Route Dredging Project.
34 Mokpo Regional Office of Oceans and Fisheries. 2017a. The Environmental Impact Assessment Report for the Sadong Port Fishing Port Facilities Project (draft).
35 Mokpo Regional Office of Oceans and Fisheries. 2017b. The Environmental Impact Assessment Report for the Sadong Port Fishing Port Facilities Project.
36 KEI (Korea Environment Institute). 2005. A Study on Effective Mitigation Measures for Environmental Impacts of Oceanic Reclamation Projects.
37 Mokpo Regional Office of Oceans and Fisheries. 2017c. The Environmental Impact Assessment Report for the Construction of Tug boat & Barge Pier at Mokpo New Port (draft).
38 Mokpo Regional Office of Oceans and Fisheries. 2018b. The Environmental Impact Assessment Report for the Construction of Tug boat & Barge Pier at Mokpo New Port.
39 Pohang Regional Office of Oceans and Fisheries. 2016b. The Environmental Impact Assessment Report for the Ganggu Port Development Project.
40 Mokpo Regional Office of Oceans and Fisheries. 2019. The Environmental Impact Assessment Report for the Supum Port Maintenance Project.
41 West Sea Fisheries Management Service, Incheon Fishing Port Office. 2010a. The Environmental Impact Assessment Report for the Anheung Port Maintenance Project (draft).
42 IPA (Incheon Port Authority). 2010. The Environmental Impact Assessment Report for the Gyeongin Ara Waterway Access Route and Port Area Protection Project (draft).
43 Mokpo Regional Office of Oceans and Fisheries. 2018a. The Environmental Impact Assessment Report for the Supum Port Maintenance Project (draft).
44 Ministry of Oceans and Fisheries, KIMST (Korea Institute of Marine Science & Technology Promotion). 2018. Development on Technology for Offshore Waste Final Disposal.