The objective of this research aims preliminary assessments of the proposed plans of offshore wind farm development based on the recently established national offshore wind map and suitability assessment system of offshore wind farm. Incheon Mueodo, Busan Dadaepo-Gadukdo, Sinangun Haeodo have been assessed considering geographic constraints such as water depth, offshore distance, national park, grid connection, and meteorological constraint such as wind power density and wind direction. According to the assessment, Mueodo plan has a weak point in grid connection and several geographic limitations are involved in Haeodo plan while Dadaepo-Gadukdo seems the most possible plan among the review cases. Because of limited assessment in this research, more detail and further consideration are necessary to make a decision of a feasibility project at proposed sites.
This paper describes a monitoring system that monitors power quality and undesirable accidents when distributed generations are connected to the power grid. Prior to develop and operate a physical monitoring system, we constitute a simulation device to simulate the monitoring processes for the situations. The simulation system consists of the server and the client that connected by communication line. This system has various functions to monitor the power quality and the connection situation. Those functions are generation, transmission, acquisition and analysis of the simulated power data. This research seems very important to get the reliable and intelligent connection algorithm through the result of simulated monitoring system. Also hereafter, as this system uses the remote monitoring system through network and constitute the data base(DB), it will play an important role in building the automation of power system efficiently and systematically.
In this paper, multiple offshore wave energy converters with different output characteristics are connected to one power distribution substation. The connection between the power take-off of the different wave energy converters and the electrical power transmission system is presented in order to investigate whether multiple wave energy converters can augment energy yield and improve network integration capabilities. Moreover, the model of an array of wave energy converters is developed with the goal of analyzing the effects of the offshore wave farm on the electrical network to which it is connected. It is also developed to ensure that the electricity generated by the array is sufficiently controllable, and of a quality that can be integrate into the electricity supply network without unduly increasing the cost of connection, production or delivery.
In general, the voltage stability of induction generator is lower than synchronous generator. Induction generator has a number of advantages over the synchronous generator on the side of price and maintenance. So Induction generator has been applied to the small hydroelectric power of low output. Induction generator usually generates a high current during grid connection. The high current that occurs during grid connection can cause a voltage drop in the system. In order to increase the supply of the induction generator, it is necessary to propose a method of reducing high current. This paper proposes some method of the soft start to reduce voltage drop caused by the large starting current. soft-start method has high voltage drop effect than direct start method, control of firing angle can be increased the voltage drop effect.
A tendency to erect more wind turbines can be observed in order to reduce the environmental consequences of electric power generation. As a result of this, in the near future, wind turbines may start to influence the behavior of electric power systems by interacting with conventional generation and loads. Therefore, wind turbine models that can be integrated into power system simulation software are needed. In this paper, a model that can be used to represent all types of variable speed wind turbines in power system simulations is presented. Wind turbine characteristic equation of a wind turbine is implemented in the RTDS, and the real data of weather conditions are interfaced to the RTDS for the purpose of real time simulation of grid-connection wind power system. The outcomes of the simulation demonstrate the effectiveness of the proposed simulation scheme in this paper. The results show that the cost effective verifying for the efficiency and stability of WPGS.
In order to apply superconducting electric machineries such as a Superconducting Fault Current Limiter (SFCL) to the power grid, the single module should be connected in series to have reasonable size. Superconducting tapes in the module also should be stacked to satisfy requirements such as large operation current of the power grid. This is because a single superconducting tape has restricted applicable current capacity. Moreover especially in SFCL at the fault, there should be equal voltage distribution in series-connected SFCL modules. In this paper, we investigated the voltage distribution in fault current of series-connected YBCO coated conductors (CC). Depending on characteristics of the CC samples such as critical current, even voltage distribution could be achieved or not. In addition, the effect of stacked CC on the change of voltage distribution comparing to non-stack cases in series connection was confirmed by experiments. As the CC stacked, voltage difference could be reduced.
In this paper, a novel high gain bidirectional modular dc-dc converter (BMC) with unipolar and bipolar structures for dc network interconnections is proposed. When compared with traditional dc grid-connecting converters, the proposed converter can achieve a high voltage gain with a simple modular transformerless structure. A sub-modular structure for the BMC is proposed to eliminate the unbalanced current stress between the different power units (levels) in the BMC. This can realize current sharing and standardized production and assembling. In addition, phase-interval operation is introduced to the sub-modules to realize low voltage and current ripple in both sides of the converter. Furthermore, two types of bipolar topologies of the sub-modular BMC were proposed to extend its application in bipolar dc network connections. In addition, the control system was optimized for grid-connection applications by providing various control strategies. Finally, simulations of a 3-level unipolar sub-modular BMC and a 4-level bipolar sub-modular BMC were conducted, and a 1-kW experimental 3-level unipolar prototype was developed to verify the effectiveness of the proposed converter.
In this study, the surface marker method, one of the particle tracking methods, used to track the free surface is extended to cover the more general cases easily including the collision and separation of the free surface. In surface particle method to redistribute particles effectively using the grid system, the free surface is composed of the sum of quadrilaterals having four curves where fixed markers are placed at ends of each curve. Fixed markers are used to know how curves are connected to each other. The position of fixed markers can move as the free surface deforms but all fixed markers cannot be deleted during all time of simulation to keep informations of curve connection. In the case of the collision or separtion of the free surface where several curves can be intersected disorderly, severe difficulties can occur to define newly states of curve connection. In this study, the adaptable surface parTicle method without fixed markers is introduced. Intersection markers instead of the fixed markers are used to define quadrilaterals. The position of the intersection markers is defined to be the intersection point between the free surface and the edge of the grid and it can be added or deleted during the time of simulation to allow more flexibilities. To verify numerical schemes, two flow cases are simulated and the numerical results are compared with other's one and shown to be valid.
본 논문은 실용화 보급단계에 있는 대표적인 대체에너지 전원으로서, 태양전지, 직·교류(DC/AC) 인버터, 전력계통으로 구성되는 계통연계형 태양광발전시스템의 설계 및 시험결과에 대하여 기술하고자 한다. 계통연계를 위한 시스템 특성을 검증하기 위해 3상 직·교류 인버터를 포함한 50kW 계통연계 태양광발전시스템이 설계 제작되었다. 또한 d-q 변환을 이용한 PI 제어기를 갖는 전류제어방식의 3상 PWM 인버터 제어기법이 제시되었다. 실험결과들은 제안된 시스템이 계통연계 동작에 있어서 단위 역율로 안정하게 동작함을 보여준다.
본 연구는 스마트분전반 MG(;Micro-Grid) 구성의 중심축으로 모듈형 하이브리드 발전원과 DC버스를 통하여 링크를 갖으며 표준소켓을 사용하여 불법연결을 감지 차단하는 기능을 부여하고, 전력계통의 안정화를 달성함을 목적으로 한다. 전력변환장치, 스마트분전반, 통합제어시스템의 개발과 효율적인 수요관리가 필요하며, MG 전체시스템과의 호환성이 절실하다. 이는 공통 전력 연결 규약으로 안전하고 누구나 연결을 쉽게 할 수 있는 하이브리드발전시스템으로 데이터 관리가 용이해지고 다양한 제조사의 시스템 확대설치에 대한 대비가 가능하다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.