• 제목/요약/키워드: geotechnical monitoring

검색결과 360건 처리시간 0.025초

원위치 지반오염정화사업에서의 실시간 모니터링 시스템의 적용 사례 (Application of Real-Time Monitoring System to In-Situ Soil Remediation Project)

  • 정승용;김병일;한상재;김수삼;홍상기
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.1384-1389
    • /
    • 2005
  • A real-time monitoring system for in-situ soil remediation technologies is developed and then applied to electrokinetic remediation technique in the field trial tests during 150days. The developed system is consisted the controlled program based on internet web page, data logger, measurement instruments and so on. In the measured items there are pH, temperature, electrical current and potential, vacuum pressure. The results indicated that the system is successively applied to electrokinetic remediation technique, and further research considering economic view and multi purpose system for in-situ soil remediation technologies is needed.

  • PDF

불량 매립지에서의 지하수 오염특성과 환경오염 방지방안 (Characteristics of Groundwater Contamination in Uncontrolled Landfill and Pollution Control Measures)

  • 구자중;윤석표
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1993년도 지반.환경 매립에 관한 학술발표회 논문집
    • /
    • pp.28-44
    • /
    • 1993
  • Remediation actions in uncontrolled landfill site should be conducted after the investigation of contamination status and potential health risk or damage. Based on the above, proper control measures should be established and operated. Also continuous monitoring should be followed. In this study, the status of ground water contamination around Nanji Landfill Site was investigated. Monitoring wells were installed around the landfill and ground water was sampled once a month and analyzed. Water quality of each monitoring well was different depending on the horizontal and vertical distance from the landfill, and the seasonal leachate characteristics were not significantly changed because percolating water stayed long time in the deep waste layer. It was predicted that major multivalent cations were mainly precipitated as metal carbonate form, and chemical mass balances (CMBs) could be applied for the apportionment of leachate contamination to ground water quality of surrounding areas of Nanji Landfill. Parameters required to estimate pollutant flux to the receptor near landfill were listed and discussion to get these parameters was made. Finally, based on the above data, control measures of ground water contamination were suggested and discussed.

  • PDF

현장계측을 이용한 호안의 침하 및 안정성의 평가 (An Evaluation of the Settlement and Stability in the Reclaimed Revetment by Field Monitoring Method)

  • 김형주;양태선;최덕찬
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1992년도 가을학술발표회 논문집
    • /
    • pp.149-155
    • /
    • 1992
  • In case of construction of the final refuse disposal site on the ground where 20m soft clay layer is deposited, Sand Compaction Pile(SCP) was driven with a view to increase the strength and reduce the settlement when the reclaimed revetment intend to be constructed first in a short time. Field monitoring method is carried out in order to overcome the problems of settlement and stability in the construction of the reclaimed revetment and the assumed problems in the design of composite ground. In this paper the observed data from monitoring sections are analysed, fedback to the desigh and field, and compared with FEM analysis. Conclusions are as follow: in case of 70% replacement the use of modified soilparameters makes the FEM analysis of SCP possible. In case of 27% replacement, n(stress concentration ratio)=0.2-0.3, B(measured settleme reduction coefficient)=0.43 are evalated. Also, horizontal displacement is remarkably happened around the ground.

  • PDF

Geological Safety Evaluation and Monitoring of Nuclear Facility Sites in South Korea

  • Lee, Hyunwoo;Woo, Hyeon Dong;Chun, Hyun Ju;Im, Chang-Bock
    • 지질공학
    • /
    • 제24권4호
    • /
    • pp.609-613
    • /
    • 2014
  • The Korean Peninsula, located at the southeastern tip of the Eurasian Plate, is known to be tectonically stable, and no critical evidence has yet been found that would override the safety design of nuclear facilities in South Korea. Because a nuclear power plant, like other major social overhead capital facilities, could cause great damage to both the environment and society through an unexpected tectonic event, even one of extremely low probability, like the Fukushima accident, a defense-in-depth safety approach is required in geological and geotechnical site safety evaluation for nuclear projects. This paper introduces the regulatory procedures that are in place to confirm nuclear site safety and site monitoring (e.g., earthquakes and groundwater) systems applied to nuclear facilities in order to reduce inherent uncertainties within the site safety review of geological and seismological issues related with a NPP project.

Reliability Based Real-time Slope Stability Assessment

  • Lee, Seung-Rae;Choi, Jung-Chan;Kim, Yun-Ki
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.427-435
    • /
    • 2008
  • A reliability based slope stability assessment method is proposed and examined considering the variation of matric suction which is measured by a real time slope monitoring system. Mean value first order reliability method and advanced first order reliability method are used to calculate reliability indices of a slope. The applicability of methods is compared by applying them to the range of matric suctions measured by the real-time monitoring system. Sensitivity analysis is also performed to examine the contribution of random variables to the reliability index of slope. Finally, the proposed method is applied to a model slope. The results show that the reliability index of slope can be used for efficient slope management by quantifying the risk of slope in real time.

  • PDF

풍화화강토 사면에서 강우로 인한 모관흡수력 변화에 대한 실험 연구 (In-situ Monitoring of Matric Suctions in a Weathered Granite Soil Slope)

  • 이인모;조우성;김영욱;성상규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.509-516
    • /
    • 2002
  • Rainfall-induced landslides in a weathered granite soil slope have mostly relative shallow slip surfaces above the groundwater table The pore-water pressure of soil above the groundwater table is usually negative. This negative pore-water pressure(or matric suction) has been found to make a large contribution to the slope stability. Therefore, the variation of in-situ matric suction profiles with time in a soil slope should be understood. In this study, a field measurement program was carried out from June to August, 2001 to monitor in-situ matric suctions and volumetric water contents in a weathered granite soil slope. The influence of climatic conditions on the variation of in-situ matric suctions could be found to decrease rapidly with depth. It could be found that decrement of matric suction induced by precipitation is affected not only by the amount and duration of rainfalls but also by the initial matric suction just prior to rainstorms. The soil-water characteristic from the field monitoring tends toward the wetting path of SWCC obtained from the laboratory test.

  • PDF

점증 재하를 고려한 선행재하 공법 적용 연약지반의 현장 계측을 통한 침하량 예측 방법의 개발 (Prediction Method of Settlement Based on Field Monitoring Data for Soft Ground Under Preloading Improvement with Ramp Loading)

  • 우상인;윤찬영;백승경;정충기
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.452-461
    • /
    • 2008
  • Previous settlement prediction method based on settlement monitoring such as hyperbolic, monden method were developed under instantaneous loading condition and have restriction to be applied to soft ground under ramp loading condition. In this study, settlement prediction method under ramp loading was developed. New settlement prediction method under ramp loading considers influence factors of consolidation settlement and increase accuracy of settlement prediction using field monitoring data after ramp loading. Large consolidation tests for ideally controlled one dimensional consolidation under ramp loading condition were performed and the settlement behavior was predicted based on the monitoring data. As a result, new prediction method is expected to have great applicability and practicability for the prediction of settlement behavior.

  • PDF

준설매립 초연약지반의 압밀침하 거동 및 계측 사례 (Case history in prediction of consolidation settlement and monitoring)

  • 전제성;이종욱;임은상;김재홍
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.1712-1716
    • /
    • 2008
  • Performance of ground improvement project using prefabricated vertical drains of condition, in which approximately 10m dredged fill overlies original soft foundation layer in the coastal area has been conducted. From field monitoring results, excessive ground settlement compared to predicted settlement in design stage developed during the following one year. In order to predict the final consolidation behavior, recalculation of consolidation settlements and back analysis using observed settlements were conducted. Field monitoring results of surface settlements were evaluated, and then corrected because large shear deformation was occurred by construction events in the early stages of consolidation. To predict the consolidation behavior, material functions and in-situ conditions from laboratory consolidation test were re-analyzed. Using these results, height of additional embankment is estimated to satisfy residual settlement limit and maintain an adequate ground elevation. The recalculated time-settlement curve has been compared to field monitoring results after additional surcharge was applied.

  • PDF

Multi Antenna GPS를 이용한 취약사면 상시모니터링 시스템 (The Monitoring System Using Multi Antenna GPS for Weak Slope)

  • 노원석;김완종;장현익;김학수
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.677-694
    • /
    • 2009
  • While the budget has been allocated more for repairs and reinforcements, casualties are gradually increased due to slope disaster. Slope disaster causes road damaged as well as casualties. It also causes significant social and economic loss. The measurement device, which is installed inside ground of slope like inclinometer, has the high loss rate when slope is being slided. The electric type and the vibrating wire type have low durability because of corrosion. To cover the demerit of the present slope monitoring, the measurement method using the Multi-Antenna GPS has been developed. The Multi-Antenna GPS has been installed in the local slope as the regular monitoring system for slope. Although the initial cost of the Multi-Antenna GPS for installation is high, the additional cost is low. So it is the suitable method for large slope. The regular monitoring system using the Multi-Antenna GPS is the suitable measurement method for watching slope collapse, which is occurred widely, because it is economical, has high durability, and collects data with high resolution.

  • PDF

Application of Multi-Antenna GPS Technology in Monitoring Stability of Slopes

  • Ding, X.L.;Dai, W.J.;Yang, W.T.
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.651-659
    • /
    • 2009
  • There are a great number of man-made and natural slopes in many parts of the world including Hong Kong and Mainland China. For example, there are over 40,000 slopes in Hong Kong registered by the Hong Kong Government. Landslides due to slope failures can often cause catastrophes that involve the loss of both lives and important facilities. GPS has been demonstrated to have great potentials for use in monitoring slope stability and landslides. However, the high hardware cost of GPS has limited the wide spread use of GPS for such applications. The multi-antenna GPS technology initiated by the research group and our collaborators has significantly reduced the cost of GPS and provided a solution to a number of associated problems such as data management and power supply. This paper discusses practical applications of multi-antenna GPS technology in slope monitoring, including system design, setting up, data transmission and management, and data quality analysis and control. Some slope monitoring examples are given to illustrate the points discussed.

  • PDF