로트 스트리밍 흐름공정 일정계획의 스트레치 최소화 (On Lot-Streaming Flow Shops with Stretch Criterion)

  • 윤석훈
    • 산업경영시스템학회지
    • /
    • 제37권4호
    • /
    • pp.187-192
    • /
    • 2014
  • Lot-streaming is the process of splitting a job (lot) into sublots to allow the overlapping of operations between successive machines in a multi-stage production system. A new genetic algorithm (NGA) is proposed for an n-job, m-machine, lot-streaming flow shop scheduling problem with equal-size sublots in which the objective is to minimize the total stretch. The stretch of a job is the ratio of the amount of time the job spent before its completion to its processing time. NGA replaces the selection and mating operators of genetic algorithms (GAs) by marriage and pregnancy operators and incorporates the idea of inter-chromosomal dominance and individuals' similarities. Extensive computational experiments for medium to large-scale lot-streaming flow-shop scheduling problems have been conducted to compare the performance of NGA with that of GA.

Slack Degree에 의한 n/m Job-Shop 스케줄링 문제의 발견적 해법에 관한 연구 (A Study on the Heuristic Solution for n/m Job-Shop Scheduling Problems of Slack Degree)

  • 김제홍;조남호
    • 산업경영시스템학회지
    • /
    • 제19권39호
    • /
    • pp.275-284
    • /
    • 1996
  • It can be made a definition that scheduling is a imposition of machinery and equipment to perform a collection of tasks. Ultimately scheduling is an assessment of taking order for which would be perform. So it is called "sequencing" in other words. In a job shop scheduling, the main object is to making delivery in accordance with the due date and order form customer, not to producing lots of quantity with minimizing mean flow time in a given time. Actually, in a company, they concentrate more in the delivery than minimizing the mean flow time. Therefore this paper suggest a new priority dispatching rule under consideration as below in a n/m job shop scheduling problem with due date. 1. handling/transportation time, 2. the size of customer order With this algorithm, we can make a scheduling for minimizing the tardiness of delivery which satisfy a goal of production.roduction.

  • PDF

한정된 크기의 버퍼가 있는 흐름 공정 일정계획의 스트레치 최소화 (Minimizing the Total Stretch in Flow Shop Scheduling with Limited Capacity Buffers)

  • 윤석훈
    • 대한산업공학회지
    • /
    • 제40권6호
    • /
    • pp.642-647
    • /
    • 2014
  • In this paper, a hybrid genetic algorithm (HGA) approach is proposed for an n-job, m-machine flow shop scheduling problem with limited capacity buffers with blocking in which the objective is to minimize the total stretch. The stretch of a job is the ratio of the amount of time the job spent before its completion to its processing time. HGA adopts the idea of seed selection and development in order to improve the exploitation and exploration power of genetic algorithms (GAs). Extensive computational experiments have been conducted to compare the performance of HGA with that of GA.

퍼지 환경하에서의 FLOW SHOP 일정계획 방법에 관한 연구 (A Study on Flow Shop Scheduling Problems under Fuzzy Environment)

  • 김정자;이상완;박병주
    • 한국경영과학회지
    • /
    • 제13권2호
    • /
    • pp.163-163
    • /
    • 1988
  • This research shows that fuzzy set theory can be useful in modeling and solving flow shop scheduling problems with uncertain processing times and illustrates a method for solving job sequencing problem which the opinions of experts disagree in each processing time. In this study, FCDS (Fuzzified Campbell-Dudek-Smith) algorithm and FNEH (Fuzzified Nawaz-Enscope-Ham) algorithm are proposed to improve the fuzzified Branch & Bound algorithm that requires long run-time and computational complexities to find the optimal sequence. These proposed algorithms are also designed to treat opinions of experts. In this paper, Fuzzy processing times are expressed as triangular fuzzy numbers and comparison method use Lee-Li method and ranking method based on the dominance property. On the basis of the proposed method, an example is presented.

Hybrid Flow Shop with Parallel Machines at the First Stage and Dedicated Machines at the Second Stage

  • Yang, Jaehwan
    • Industrial Engineering and Management Systems
    • /
    • 제14권1호
    • /
    • pp.22-31
    • /
    • 2015
  • In this paper, a two-stage hybrid flow shop problem is considered. Specifically, there exist identical parallel machines at stage 1 and two dedicated machines at stage 2, and the objective of the problem is to minimize makespan. After being processed by any machine at stage 1, a job must be processed by a specific machine at stage 2 depending on the job type, and one type of jobs can have different processing times on each machine. First, we introduce the problem and establish complexity of several variations of the problem. For some special cases, we develop optimal polynomial time solution procedures. Then, we establish some simple lower bounds for the problem. In order to solve this NP-hard problem, three heuristics based on simple rules such as the Johnson's rule and the LPT (Longest Processing Time first) rule are developed. For each of the heuristics, we provide some theoretical analysis and find some worst case bound on relative error. Finally, we empirically evaluate the heuristics.

퍼지 환경하에서의 flow shop 일정계획 방법에 관한 연구 (A study on flow shop scheduling problems under fuzzy environment)

  • 김정자;이상완;박병주
    • 경영과학
    • /
    • 제13권2호
    • /
    • pp.163-175
    • /
    • 1996
  • This research shows that fuzzy set theory can be useful in modeling and solving flow shop scheduling problems with uncertain processing times and illustrates a method for solving job sequencing problem which the opinions of experts disagree in each processing time. In this study, FCDS (Fuzzified Campbell-Dudek-Smith) algorithm and FNEH (Fuzzified Nawaz-Enscope-Ham) algorithm are proposed to improve the fuzzified Branch & Bound algorithm that requires long run-time and computational complexities to find the optimal sequence. These proposed algorithms are also designed to treat opinions of experts. In this paper, Fuzzy processing times are expressed as triangular fuzzy numbers and comparison method use Lee-Li method and ranking method based on the dominance property. On the basis of the proposed method, an example is presented.

  • PDF

딜리버리 윈도우 로트-스트리밍 흐름 공정 문제 (Lot-Streaming Flow Shop Problem with Delivery Windows)

  • 윤석훈
    • 대한산업공학회지
    • /
    • 제30권2호
    • /
    • pp.159-164
    • /
    • 2004
  • Lot-streaming is the process of splitting a job (lot) into a number of smaller sublots and then scheduling these sublots in order to accelerate the completion of jobs in a multi-stage production system. Anew genetic algorithm (NGA) is proposed for an-job, m-machine, equal-size sublot lot-streaming flow shop scheduling problem with delivery windows in which the objective is to minimize the mean weighted absolute deviation of job completion times from due dates. The performance of NGA is compared with that of an adjacent pairwise interchange (API) method and the results of computational experiments show that NGA works well for this type of problem.

기계가 2대인 흐름생산시스템에서 생산준비시간 분리와 이송배치를 고려한 일정계획 (Transfer Batch Scheduling for a Two-machine Flow Shop with Attached and Separated Setup Times)

  • 김중순
    • 한국경영과학회지
    • /
    • 제26권1호
    • /
    • pp.87-96
    • /
    • 2001
  • This paper considers the transfer batch scheduling problem for a two-machine flow shop with setup times consisting of attached setup time and separate setup time. The attached setup is attached to the processing and can be scheduled in anticipation of arriving work. Two cases of the separate setup are addressed. One is the case that the separate setup can be done only when a machine is idle. The other is the case that the separate setup can be done even though the machine is idle. the other is the case that the separate setup can be done even though the machine is operating. A scheduling rule similar to Johnson\`s rule is suggested to minimize makespan. the scheduling rule developed can be applied to most of the two-machine flow shop scheduling problems if some parameters are adjusted. A numerical example is presented to illustrate the scheduling rule.

  • PDF

Heuristics for Flow Shop Scheduling with Weighted WIP Costs

  • 양재환;김현수
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2006년도 춘계공동학술대회 논문집
    • /
    • pp.1124-1132
    • /
    • 2006
  • This paper considers a flow shop scheduling problem where a different WIP (work-in-process) state has different weight on the duration time. The objective is to minimize the sum of the weighted WIP. For the two machine flow shop case, the recognition version is unary NP-Complete. The three simple and intuitive heuristics H0, H1, and H2 are presented for the problem. For each heuristic, we find an upper bound on relative error which is tight in limit. For heuristic H2, we show that H2 dominates the other two heuristics.

  • PDF

2 단계 혼합흐름공정에서의 일정계획문제에 관한 연구 (Two-Stage Hybrid Flow Shop Scheduling: Minimizing the Number of Tardy Jobs)

  • 최현선;이동호
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2006년도 춘계공동학술대회 논문집
    • /
    • pp.1133-1138
    • /
    • 2006
  • This paper considers a hybrid flow shop scheduling problem for the objective of minimizing the number of tardy jobs. The hybrid flow shop consists of two stages in series, each of which has multiple identical parallel machines, and the problem is to determine the allocation and sequence of jobs at each stage. A branch and bound algorithm that gives the optimal solutions is suggested that incorporates the methods to obtain the lower and upper bounds. Dominance properties are also derived to reduce the search space. To show the performance of the algorithm, computational experiments are done on randomly generated problems, and the results are reported.

  • PDF