• Title/Summary/Keyword: fireproofing performance

Search Result 9, Processing Time 0.021 seconds

Effect of Change of Sleeve Type on Fireproofing Performance of Through-Penetration Firestop System on Metallic Pipes (금속관 설비관통부 내화채움 시스템의 슬리브 종류 변화가 내화시험에 미치는 영향)

  • Choi, Hong-Beom;Jeong, A-Yeong;Lee, Hyung-DO;Park, Jin-O;Ok, Chi-Yeol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.327-328
    • /
    • 2023
  • In this paper, the effect of change of sleeve type on fireproofing performance of through-penetration firestop system on metallic pipes was analyzed. As a result, if the material of the sleeve is high in thermal conductivity and thick, a large amount of heat is transferred to the top of the support structure.

  • PDF

A Study on the Design Fire Model for Structural Fire Resistant Design in Buildings (건축구조물의 구조내화설계를 위한 설계화재모델에 관한 연구)

  • Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.256-257
    • /
    • 2019
  • Recently, the fire risk of architectural structures is increasing due to the super high - rise and super - size of the buildings. Therefore, the direction of fire safety design tends to change from the existing design to the performance - based design. In particular, domestic fire safety policies are divided into building law and fire fighting law. In case of fire fighting law, performance design is already carried out. Therefore, this study summarizes the prediction formula for fire characteristics among the structural fireproofing design field as shown in Fig. 1 according to this situation, and compares it with the standard method of each country in particular.

  • PDF

Experimental evaluation of fire protection measures for the segment joint of an immersed tunnel (침매터널 세그먼트조인트의 내화 대책에 대한 실험적 평가)

  • Choi, Soon-Wook;Chang, Soo-Ho;Kim, Heung-Youl;Jo, Bong-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.3
    • /
    • pp.177-197
    • /
    • 2011
  • In this study, a series of fire experiments under $HC_{inc}$ and ISO834 (duration of 4 hour) fire scenarios were carried out for three different types of fire protection measures for the segment joint to evaluate their applicabilities to an immersed tunnel. The experimental results revealed that an expansion joint installed to allow relative movements between concrete element ends in an segment joint is the most vulnerable to a severe fire. For the fire protection measure where the originally designed steel plates at an expansion joint arc replaced by fire-resistant boards, the experiments showed that they cannot achieve good fireproofing performance under both $HC_{inc}$ fire scenario and ISO834 (4 hour) fire scenarios since the installation of fire-resistant boards results in the reduction of the sprayed fire insulation thickness. On the other hand, the application of modified bent steel plates replacing the original steel plates was proved to be very successful in fireproofing of the expansion joint due to more sprayed materials filled in bent steel plate than in the original design concept as well as higher adhesion between the steel plate and the sprayed fire insulation layer.

Fire resistance assessment in construction joint of precast fireproof duct slab (프리캐스트 방식 내화풍도슬래브 시공조인트부의 화재저항성능 평가)

  • Choi, Soon-Wook;Kang, Tae-Ho;Lee, Chulho;Kim, Se Kwon;Kim, Tae Kyun;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.359-370
    • /
    • 2021
  • Duct slabs, which are used to build ventilation facilities in underground spaces with transverse ventilation system, need to secure fire resistance according to longitudinal and heavy vehicle traffic of tunnels. This study measured the temperature change at the construction joint of the precast fireproof duct slab which integrates fire resistance material and duct slab under the RWS fire scenario. As a result, it was confirmed that if there is no reinforcement of the construction joint, damage will occur in concrete inside the construction joint, leading to damage to the fireproofing layer. On the other hand, when one side of the construction joint was reinforced with fireproofing materials, it showed more than three times the fire resistance performance compared to when there was no reinforcement. At this time, cross-sectional losses of concrete and fireproofing layer were shown in blocks without reinforcement, but no damage was seen in the reinforced blocks.

A study on design development and construction application of precast concrete modular house (프리캐스트 콘크리트 모듈러 단독주택 설계 개발 및 시공 적용에 관한 연구)

  • Seo, Dong-Won;Jeon, Sang-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.230-231
    • /
    • 2021
  • In this study, Dr. Bae Kyu-woong of the Korea Institute of Construction Technology developed a concrete module that was lightweighted to 1700kN with KC modules and met housing performance standards. It solves Construction lifts problem that was the limit of the PC module, and is an innovative model that greatly improves Construction period and economics with boxed modules, and is manufactured in the factory by extruded molding in vibration, noise, fireproofing standards, etc., and has the advantage of excellent precision and high strength. Therefore, if the framing house of a precast concretecan only be standardized in construction, its potential for growth will be endless. To do this, standardization, standardization, and modularization of the design are essential.

  • PDF

Evaluation of Adhesion Performance of High-Fireproofing Alumino-silicate Inorganic Mortar (알루미노 실리케이트계 고내화성 모르타르의 부착성능 평가)

  • Cho, Hyeon-Seo;Lee, Gun-Cheol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.6
    • /
    • pp.569-576
    • /
    • 2018
  • In modern society, a huge number of the buildings have been constructed with RC structure. RC structures have many structural instabilities due to earthquake, typhoon, construction fault, design phase errors. Therefore, many reinforcement methods are being implemented to solve this problem. In the reinforcement method, the organic epoxy adhesive used in the FRP reinforcing method is abruptly damaged when exposed to high temperature, which is directly connected to the fall of the reinforcing material. Therefore, the present study was conducted to develop inorganic refractory mortar with a certain level of adhesion ability to reduce the heat transferred to FRP reinforcement when exposed to high temperatures. As a result of the test, it showed high adhesion strength at room temperature condition with the inclusion of EVA resin, and showed no performance deterioration up to about $300^{\circ}C$ even under heating conditions. Also, it was confirmed that the backside temperature was lower as the thickness increased, and converged to a constant temperature of about $780^{\circ}C$ after 2 hours of heating.

Reviewing the fireproofing of lightweight aerataed concrete for fire door interior cores (방화문 내부 심재용 경량기포콘크리트의 방화성 검토)

  • Hong, Sang-Hun;Kim, Bong-Joo;Jung, Ui-In;Kim, Hae-Nah;Park, Jun-Seo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.43-44
    • /
    • 2023
  • Fire doors installed to prevent the spread of fire in buildings are made of paper honeycomb, glass wool, and other materials. Due to their high water absorption rate, they absorb ambient moisture and degrade, and their increased weight causes them to sag internally, creating voids that can warp in the event of a fire and allow flames to pass through. To overcome these issues, research is being conducted on the physical performance of lightweight aerated concrete. However, there is a lack of research on how to ensure fire resistance. Therefore, in this study, the backside temperature of lightweight aerated concrete formulations was measured and compared and analyzied with the physical performance. Since it is difficult to achieve low density by saturation alone, aerated concrete with EPS was produced, which resulted in a density reduction of 24'26%, but the strength increase per unit cement increase was 5'25%, which tended to be lower than the formulation without EPS. The results showed that the lightweight aerated concrete with EPS was 130~140℃ lower than the lightweight aerated concrete with EPS, which is believed to be due to the melting point of EPS delayed the heat diffusion. In the future, wo plan to conduct research to identify the optimal formulation for fire door core materials by varying the amount of EPS added and using industrial by-products to increase long-term strength.

  • PDF

Design and Construction of the Burj Dubai Concrete Building Project (버즈 두바이 콘크리트 건물의 설계와 시공)

  • Abdelrazaq, Ahmad
    • Magazine of the Korea Concrete Institute
    • /
    • v.20 no.6
    • /
    • pp.28-35
    • /
    • 2008
  • The Burj Dubai Project will be the tallest structure ever built by man; when completed the tower will be more than 700 meter tall and more than 160 floors. While the early integration of aerodynamic shaping and wind engineering considerations played a major role in the architectural massing and design of this multi-use/residential tower, where mitigating and taming the dynamic wind effects was one of the most important design criteria, the material selection for the structural systems of the tower was also a major consideration and required detailed evaluation of the material technologies and skilled labor available in the market at the time Concrete was selected for its strength, stiffness, damping, redundancy, moldability, free fireproofing, speed of construction, and cost effectiveness. In addition, the design challenges of using concrete for the design of the structural system components will be addressed. The focus on this paper will also be on the early planning of the concrete works of the Burj Dubai Project.

Fire resistance assessment of precast fireproof duct slab (프리캐스트 방식 내화풍도슬래브의 화재저항성 평가)

  • Choi, Soon-Wook;Kang, Tae-Ho;Lee, Chulho;Kim, Se Kwon;Kim, Tae Kyun;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.6
    • /
    • pp.669-680
    • /
    • 2020
  • In Korea, fireproof performance is evaluated through a series of fire-resistance tests for important structures, and the performance standard follows the guidelines suggested by ITA. The fireproof duct slab manufactured by combining the slab and the fireproof material with a precast method is effective in that it can eliminate the construction time of the fireproof material. In this study, a series of fire resistance tests was performed on the fire test specimens under the RWS fire scenario in order to secure the fire resistance performance of the precast fireproof duct slab. As a result of the test, it was found that the fireproof performance was secured when the thickness of the fireproof material was 30 mm or more. In both fireproof materials and concrete, the rate of temperature change initially increased, then decreased, and then increased again, and the temperature at the inflection point was measured as 110℃ for all fireproof materials and concrete. It is judged that this occurs when the C-S-H (CaO-SiO2-H2O) generated by the hydration reaction in both the fireproof material and concrete is dehydrated.