• Title/Summary/Keyword: finishing works

Search Result 93, Processing Time 0.025 seconds

CHARACTERISTICS OF ACCIDENTS IN CONSTRUCTION PROJECT IN KOREA

  • Kyeong-Seok Chae;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.603-608
    • /
    • 2011
  • According to the labor related data from Korea Occupational Safety & Health Agency, accident victims of construction industry are increasing 6% annually since 2006. The major reason why the rate of accidents increases in Korea is that lots of labor working with another trades works simultaneously in various type of works. This study analyzes the current accident status in view of the type of building, type of works, and project size for the latest 3 years (2007~2009). As a result, 'single family & semi-detached houses' has the largest number of accidents among buildings. In addition, 'finishing work' shows the highest number in terms of work type. For the size, accidents occurred much for 'less than 300 million'. The results of this study can be used to focus on managing the highly hazardous area where the construction accidents mostly occur; therefore, it is anticipated to contribute to improve efficiency of safety management.

  • PDF

EVALUATING PRODUCTIVITY-AFFECTING FACTORS ON FINISHING WORKS IN HIGH-RISE HOUSING CONSTRUCTION

  • Chi-Joo Lee;Jae-Jun Kim;In-Suk Park;Sang-Hyo Lee;Yoon-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.398-406
    • /
    • 2007
  • Constructing high buildings is a global trend, and skyscrapers for residing are also increasing. But a period of works for finish construction is different depending on a company while a period of works for frame construction of skyscrapers for residing in the country is regular when considering a difference of a method of construction, and the increase of repeated construction for high buildings and number of related process for finish construction are stressing the importance of improving productivity through construction management and plan for works. Because there are many compositive factors affecting productivity other than technical factors, we should intensively study the way of improvement and prevention preferentially through analyzing factors affecting productivity. So in this study, we present important management factors for making systematic strategy and plan for improvement of productivity by finding factors affecting productivity depending on the degree of importance unifying factors affecting productivity of plan factor(internal factor of construction process) and management factor(outer factor of construction process).

  • PDF

Analysing Decision Factors of Delivery System for Finishing Work in High-Rise Building Construction (초고층건물 마감공사의 발주방식 선정요소에 대한 연구)

  • Lee Jae-Il;Ahn Byung-Ju;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.345-348
    • /
    • 2003
  • The overall ability to manage the construction projects from an integrated perspective is important due to the emerging of high-rise building constructions. Potential hazardous of low productivity exist in the finishing work of high rise building a distinct example of the projects. Especially, the number of activities that should be controlled during finishing work is more than during skeleton work. Thus field managers should attract more attention to manage finish work activities. The low productivity of these activities can diminish that of skeleton work. Decision factors of the delivery system for finishing works in the high-rise building project is established by means of literature review and questionnaire survey and a basis to analyze the effects of the criteria to the deli very system is presented.

  • PDF

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

Studies on Silk Textile Wash and Wear Finishing (絹織物 Wash and Wear 加工硏究)

  • Choe, Byong-Hee;Lee, Yang-Hoo
    • Journal of Sericultural and Entomological Science
    • /
    • v.23 no.1
    • /
    • pp.47-55
    • /
    • 1981
  • Silk textile finishing has been studied for many years by many workers in order to meet more utilities for various endusers. Such studies, however, could not be successful because any natural fibers are hardly change their natures by artificial treating methods. Textile finishing is of course to improve the mechandise qualities and the poor natures of silk so that it may be available as the best textile fiber in the world. Sometimes, famous trade marked textile plays more power than its quality in the silk market, nevertheless, this should be over line of research activities. Meantime, the silk demand has been also transferred from ladies stocking to other clothes since nylon or other synthetic fibers were developed. That is why, the extension of silk demand should be developed by various research works. Specially, silk is known as difficult textile to handle it during washing or ironing process which happened to depress down the silk usage for house wives. In order to solve such problems, the reporter has been worked for many years and now, he believes that he has developed a proper finishing method to coversuch problems. The developed finishing method may be said to eligible with economical aspect and shorten the dry duration after water washing in half against normal silk textile without harming the specific silk nature. As all of us know, silk fiber starts to denature since it was spinned by silkworm and the fiber is formed as overlapped "S" type curves during its concooning process. After it is made as raw silk or sericin silk, it shows as straight line form, but it changes in to waved form in case refining or degumming process in order return to its original spinned form. Such nature is continued during its textile form and ends with hard ironing nature than other textile fibers. Mean while, the silk fiber keeps to continue its denaturing and this is iniciated by repeat of washing and drying which takes many years to reach its final stage, The reporter has found the iniciating denature of silk by his finishing process, with out heat, decreasing the swollen nature which ended with shortening the drying duration after wash. Each washing was carried out by soaking the previously weighed sample in cold water for one hour, then pressed the sample for ten minutes to eliminate its free water component before weighing with same condition. According to this, the treated silk showed much denaturing after the finishing, but the standard silk progressed the denaturing by and by with the repeat of washing and drying, finally reached the same swollen degree of treated silk, Such treating result explains that the treated silk happened to be stebilized nature by the treating immediately. On the other that the treated silk happened to be stebilized nature by the treating immediately. On the other hand, standard silk may reach to such condition by the time of worn out clothes after repeat of washing and drying for many years while the clothes will be no more useful. The decreased swelling nature has brought about the drying period in half against standard silk after all. Not only the tests of tenacity and elongation but also crease resistance recovery, stiffness and shrinkage tests were carried out after each washing and drying which he has found better result on the treated silk textile against the standard silk. The most important thing was to keep the textile feeling of silk by such finishing work before improve any poor nature of silk. The general silk has a nature to absorb smoke or dirt from its surrounding air and reaches to dirty color shade upon such exposure, but the treated one has improved such nature because of its artificial denaturing, another word, it keeps clean longer than the normal silk. Many previous finishing works could improve some specific nature of silk, but it happened to deprave other important natures. The reporters work is, however, specialized to improve the silk to be useful as Wash and Wear Silk without harming its standard natures. So far, this work happened to be a overall innovative finishing method of silk textile.

  • PDF

A Basic Study on the Optional Composition for Apartment Housing Design (아파트 단위주호 개발에서 선택사양 구성을 위한 기초연구)

  • Cho, Sung-Heui;Lee, Eun-Joo
    • Journal of the Korean housing association
    • /
    • v.21 no.3
    • /
    • pp.67-76
    • /
    • 2010
  • The purposes of this study are to understand residents' needs in regard to living space and to suggest how to provide layout options for the infill, based on their needs, so that the residents can change their living space to suit their own need. This study analyzed residents' needs in terms of living spaces through literature reviews on apartment remodeling and related previous studies. The results are as follows: First, the residents remodeled the various infill, and remodeling works are then classified into five infill groups according to the flexible features: 1) structural elements, such as flooring, ceilings, interior walls, and windows/doors; 2) equipment elements, such as lighting and electricity, electrical wiring, heating arrangements, and water supply & drainage systems: 3) finishing material elements, such as finishing materials for floors, walls, and ceilings, skirting boards, moldings, and art walls; 4) furniture elements, such as built-in wardrobes, storage closets, and kitchen cabinets; and 5) bathroom facility elements such as faucets and sinks. Second, based on the remodeling features, four ways to provide options can be suggested. 1) options are provided for each room; 2) options are provided in connection with structural elements; 3) options are provided for each finishing material element; and 4) options are provided with the combinations of different bathroom facilities.

Flatness Control System of the Hot Strip by Using Tension Profile between Stands (스탠드간 장력프로파일을 이용한 열연판 평탄도 제어시스템)

  • 홍완기;이준정
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 1999.08a
    • /
    • pp.27-36
    • /
    • 1999
  • To have high flatness quality of hot rolled strip in the hot strip finishing mill train, a new inter-stand tension profile measuring device of segmented looper roll type(coined as Flatness Sensing Inter-stand Looper, FlatSIL) and a new flatness control system have been developed in this study. The device measures the strip tension profile across the strip width and informs the strip wave pattern to new flatness control system where work roll bending mode to relieve the strip wave is determined. The existing automatic shape control system which uses laser type shape-meter installed at the outlet of the last finishing mill stand strip tension between down coiler and last finishig mill since the latent wave concealed by the strip tension between down coiler and last finishing mill stand cannot be measured by the laser distance-meter. Thus the existing shape control system is not able to control the flatness through the full strip length. The new flatness control system, however, works for full strip length during strip rolling as far as the tension profile measuring device and work roll bender are on. With the new flatness control system, work roll bender is automatically controller to minimize the latent wave of the running strip and the flatness quality as well as strip travelling stability has been noticeably improved from strip head through body to tail.

  • PDF

A Self-Tuning PI Control System Design for the Flatness of Hot Strip in Finishing Mill Processes

  • Park, Jeong-Ju;Hong, Wan-Kee;Kim, Jong-Shik
    • Journal of Mechanical Science and Technology
    • /
    • v.18 no.3
    • /
    • pp.379-387
    • /
    • 2004
  • A novel flatness sensing system which is called the Flatness Sensing Inter-stand Looper(FlatSIL) system is suggested and a self-tuning PI control system using the FlatSIL is designed for improving the flatness of hot strip in finishing mill processes. The FlatSIL system measures the tension along the direction of the strip width by using segmented rolls, and the tension profile is approximated through the tension of each segmented roll. The flatness control system is operated by using the tension profile. The proposed flatness control system as far as the tension profile-measuring device works for the full strip length during the strip rolling in finishing mills. The generalized minimum variance self-tuning (GMV S-T) PI control method is applied to control the flatness of hot strip which has a design parameter as weighting factor for updating the PI gains. Optimizing the design parameter in the GMV S-T PI controller, the Robbins-Monro algorithm is used. It is shown by the computer simulation and experiment that the proposed GMV S-T PI flatness control system has better performance than the fixed PI flatness control system.

Real Survey on Interior Surface Area and Applied Finishes in Recently-Planned Apartment Houses (공동주택의 실내부 표면적 및 사용 마감재 구성 실태분석)

  • Lee, Ji-Soon
    • KIEAE Journal
    • /
    • v.10 no.6
    • /
    • pp.115-121
    • /
    • 2010
  • This paper is an outgrowth of many years of practicing real interior work projects and one of my responses to the question not only about the actual dimension of interior work surface but also about the classification of contemporary finishing materials in basic interior project of high-rise apartment houses. For this purpose, 8 conventional apartment units which are already-built or designed have been surveyed and the results are interpreted in the form of proportion of space and finishes. The data can be applied to make up a schematic design in the selection of environment-friendly interior works and assessment of the degree of sustainability. For further study, the basic data provided here can be used as an index to differentiate the occupants' desire toward green interior design for their own apartment spaces, comparing to the conventional interior work in the Korean market. Not surprisingly, wall paper is dominated to make the interior surface in apartment houses. In the percentile of the utilization of finishing materials, wood-flooring and coating materials like wet paint also ranked at the upper position.

Establishment of Service Life of Educational Facilities - Focused on the rooftop waterproofing and floor finishing -

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.14 no.5
    • /
    • pp.5-12
    • /
    • 2014
  • Building has been deteriorated gradually owing to geographic, physical complex and other factors. School living condition has a key role to improve the learning ability, life attitude and qualifications to adopt to social life. Therefore, it is important for school environment to keep the living condition. Repair time and scope of school facilities are required to maintain the function and performance to plan the long term repair. But there are little information about the school maintenance such as repair time and function. In this paper, it aimed at providing the service life to suggest the repair time and scope in the roof-proofing and floor finishing which used the three estimation method in probabilistic approach. The service life has a key role to decide the repair time and to make the plan for the repair maintenance. Results of this study are as follows ; First, the 1st repair time were taken through three methods in probabilistic and deterministic functions to eliminate the estimation bias. Second, the service life is suggested 36 years of an elementary school, 34 years of a middle school and 41 years of a high school. Third, the service life of a floor finishing is 43 years of an elementary, 39 years of a middle school and 41 years of a high school. The above study could not include the detailed information about the materials and repair works. Therefore it needs a further study to reflect the detailed information and to make a repair strategy.