• 제목/요약/키워드: expected total construction cost

검색결과 67건 처리시간 0.098초

Economic Efficiency of the Korean Container Terminals: A Stochastic Cost Frontier Approach

  • Seokwoo Jake Choi;Gi-Su Kim;BoKyung Kim
    • Journal of Korea Trade
    • /
    • 제26권3호
    • /
    • pp.23-44
    • /
    • 2022
  • Purpose - Recent issues such as vessel enlargement, strengthening of environmental regulations, and port smartization are expected to increase costs and intensify competition in the port industry. In the new normal era, when external growth has reached its limit, the efficient operation of ports is becoming indispensable for achieving sustainable growth. This study aims to identify the determinants of inefficiency by examining the cost structure and efficiency of container terminals in Korea and furthermore propose the political implications to derive the maximization of efficiency. Design/methodology - This study estimates the cost function of container terminal operators and identifies the efficiency of container terminals using stochastic cost frontier (SCF) in the first stage. In the second step, the SCF results are compared with the data envelopment analysis (DEA). Last, this paper proposes efficiency determinants on container terminal operation to establish appropriate strategies. Out of the 29 container terminal operators in South Korea, 13 operators participated in the survey. The translog cost function was estimated utilizing a total of 116 observations collected over the 2007-2017 period. Findings - Empirical analysis shows that economies of scale exist in Korea's container ports, which provides a rationale for the government's policy to establish the global terminal operator by integrating small terminal operators to enhance competitiveness. In addition, as a result of the determinants analysis, container throughput, weight of direct employment costs, and labour cost share have positive effects on improving cost efficiency, while inefficiency increases as the length of quay increases. More specifically, cost efficiency improves as the proportion of direct employment costs to outsourcing service costs increases. Originality/value - This study contributes to analyzing the inefficiency factors of container terminals through efficiency analysis with respect to a cost function. In addition, this study proposes the practical and political implications, such as establishing a long-term manpower pool, the application of the hybrid liner terminal system, and the construction of a statistical data system, to improve the cost inefficiency of terminal operators.

개방형 BIM을 활용한 벽체 거푸집설계 프로토타입 개발 (Development of A Prototype for Wall Formwork Designs using Open BIM)

  • 김승권;김현주;현창택;한상원
    • 한국건설관리학회논문집
    • /
    • 제19권6호
    • /
    • pp.3-13
    • /
    • 2018
  • 거푸집공사비는 건축공사비의 10~15%, 골조공사비의 30~40%로, 건축공사에서 차지하는 비중이 상당하다. 또한 거푸집 붕괴로 인한 사망재해가 빈번하게 발생하고 있어, 다른 공종에 비하여 상대적으로 재해강도가 높은 공종이라 할 수 있다. 이처럼 건설 프로젝트에서 거푸집을 설계할 때 정확한 물량산출과 구조계산은 매우 중요한 사항이다. 따라서 본 연구에서는 거푸집설계를 용이하게 하기 위하여 거푸집공사에 관련된 새로운 IFC Entity를 제안하였으며, "개방형 BIM 거푸집설계 프로토타입"을 개발하였다. 본 연구에서 제안하는 거푸집설계 접근법은 시공 관리자로 하여금 정확한 물량산출과 신속한 계획 및 시공을 수행하는데 도움을 줄 것으로 기대된다. 하지만 본 연구는 소규모 특정건축물과 유로폼 만을 대상으로 수행하였기 때문에, 그 외의 건축물의 거푸집공사에 적용하기에는 한계가 있고, 범용적으로 거푸집공사에 적용하기 위해서는 추가적인 연구가 필요할 것이다.

모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 - (Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works -)

  • 김주호;박문서;이현수;현호상
    • 한국건설관리학회논문집
    • /
    • 제19권2호
    • /
    • pp.50-60
    • /
    • 2018
  • 최근 인력자원 투입량 감소 및 공기단축이 가능한 모듈러 건축공법은 반복 공정이 많은 기숙사, 주거시설, 호텔 공사 등에 다양하게 적용되고 있다. 모듈러 건축공법은 유닛 설치비용을 제외한 현장 공사비에서 외장 마감공사 비용의 비중은 약 40%를 차지하며, 마감공사는 목표공기와 비용을 유지하는데 주요한 역할을 한다. 모듈러 현장에서 유닛 설치 및 마감공사 수행을 위해 한정된 장비가 후속 액티비티에 영향을 주지 않도록 공유되어야 하며 현장 마감 비중이 커지는 모듈러 프로젝트일수록 공정관리에서 양중 계획은 매우 중요하기 때문이다. 이와 같은 T/C 운용 계획은 단일 사이클 또는 다중 사이클의 형태를 가지게 되며 사이클 주기 조율은 장비효율을 높일 수 있다. 그러나 유닛 설치 및 마감공사를 지원하기 위한 T/C 운용 계획의 대안을 평가하는데 어려움이 있다. 따라서 본 연구는 모듈러 건축 현장에서 T/C 운용의 사이클 주기 설정에 따른 운용방식의 대안을 평가하기 위해 유닛 양중 시간 및 주기, 외장재 양중 시간, 마감 작업 소요시간을 변수화하여 T/C 가동시간과 공정에 주는 영향을 파악한다. 이러한 목적을 달성하기 위해 현장에서 이루어지는 작업 프로세스 분석을 바탕으로 작업 속도를 조절하여 T/C 효율을 증대시킬 수 있는 시뮬레이션 모델을 개발한다. 본 연구는 양중 사이클 개념을 적용한 자원 평준화 방법을 제시함으로써 학술적 기여가 있으며 실무적으로 현장관리자에게 장비 계획의 대안 선택을 위한 기초자료로서 활용될 수 있을 것이다.

건축구조용 고성능 강재 HSA800의 효율적 사용을 위한 초고층 건물의 적용성 평가 (Evaluation of Applicability on a High-rise Building for the Effective Usage of High Performance Steel for Building Structures)

  • 김도환;김주우;이동우;양재근;이명재
    • 한국강구조학회 논문집
    • /
    • 제26권5호
    • /
    • pp.463-471
    • /
    • 2014
  • 최근 건축물의 초고층화, 대형화 및 장경간화에 따른 요구 성능의 증대에 따라 강재 및 콘크리트 등의 구조재료가 지니는 재료강도 및 사용성 등을 향상시키고자 하는 노력이 지속적으로 이루어지고 있다. 본 연구에서는 개발된 건축구조용 고성능 강재의 기계적, 화학적 소재 특성을 평가하고, 실제 Project를 대상으로 대안설계를 수행하여 고강도 강재의 경제성을 평가하였다. HSA800은 고강도와 좋은 용접성을 갖추기 위해 TMCP 방식으로 제조되었으며, 기계적, 화학적 성질 모두 KS규격을 만족하였다. 또한 HSA800의 고층건물의 적용성 및 경제성 평가를 위해 SM490강재 모델과 사용성에 초점을 두고 비교 평가를 수행하였다. 그 결과 SM490대비 약 30% 물량절감이 가능하였다. HSA800의 사용은 추후 건축구조의 제작, 시공 뿐만아니라 공사비 절감에도 기여할 것으로 기대되어진다.

무선통신기반 열차제어시스템의 무선시스템 설계에 대한 검토(2) (On the Design of Radio System for Communication Based Train Control System(2))

  • 최규형;윤용기
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1297-1302
    • /
    • 2004
  • CBTC(Communication Based Train Control) System has many superior train control performances than conventional track-circuit-based train control system with higher train operation efficiency, and less installation and maintenance cost. It is expected that CBTC will replace the conventional train control systems in near future. As CBTC has different mechanisms from conventional track-circuit-based train control systems in identifying train positions, and communicating information between train and ground facility, we have to pay a earful attention to making the interface between CBTC equipments and other signalling devices. This paper provides the construction of the interface between CBTC equipment and other signalling equipments such as TTC(Total traffic Control) system. ATO. electronic interlocking devices.

  • PDF

The Polarization of Wealth: The Effect of Support of Knowledge Management on Knowledge Management Activity and Company Performance

  • Yang, Hoe-Chang;Lee, Chun-Ho;Kim, Jung-Ho
    • 동아시아경상학회지
    • /
    • 제5권2호
    • /
    • pp.1-11
    • /
    • 2017
  • This study attempts to verify effects of CEO' supports, compensation and educational training and those of individual annual salaries and company's sales on promotion of knowledge management expected to contribute to enhancing construction industry's competitiveness, from the perspective of person-organization fit. For the analysis, a total of 368 effective questionnaires were used to conduct independent sample t-test, regression analysis and hierarchical moderated regression analysis. The findings show that individual annual salaries have a positive relationship with company's performance and company's sales also have positive relationships with both knowledge management activities and company performance, and CEO's supports, compensation and educational training are important factors that can improve knowledge management activities. In addition, the principle that the rich get richer and the poor get poorer is also operated in construction industry, as in other industries. Therefore, members in a company should conduct optimal strategies to enhance the knowledge management activities through selection and concentration, while governmental agencies require the establishment of IT system for it and supports for related cost and consulting of it.

장기계속공사계약의 효율적 운영을 위한 제도 개선 (Systematic Improvement for Effective Operation of Long-Term Continuous Construction Contracts)

  • 조영준
    • 한국건설관리학회논문집
    • /
    • 제20권6호
    • /
    • pp.3-10
    • /
    • 2019
  • 수년에 걸쳐 장기적으로 사업을 추진해야 하는 대형건설공사를 위해서는 단년도에 편성된 예산의 한도내에서 공사를 차수별로 계약체결하는 장기계속공사계약과 전체공사에 대한 예산을 편성해 두고 연차적으로 집행해 나가는 계속비사업계약이 있다. 장기계속공사계약의 경우 매년도 예산편성에 따라 공사를 진행하게 되므로 최초 예산을 산출할 때 전체 사업기간을 예상할 수 없다. 또한 장기계속공사계약과 관련해서는 하자책임과 관련된 법령, 계약이행과 관련된 법령이 체계적으로 정립되어 있지 못하고 있다. 그러므로 실제 건설현장에서는 장기계속공사계약과 관련하여 하자책임이나 계약의 이행과 관련하여 많은 문제점이 발생되고 있다. 이에 본 연구에서는 장기계속공사계약의 효율적인 운영을 위해 다음과 같은 개선방향을 제시하였다. 첫째, 하자담보책임은 법적책임이므로 시행령이 아닌 법에 명시하여야 한다. 둘째, 장기계속공사에서 차수별 계약당사자가 달라질 경우 시행령에서 특약을 정할 수 있도록 명시해야 한다. 셋째, 장기계속공사의 공기연장으로 인한 간접비가 발생될 경우 총사업비관리지침의 예비비항목을 활용할 수 있도록 해야 한다. 넷째, 공사계약일반조건의 경우 손해보험의 가입, 검사, 인수, 하자보수 및 하자검사와 관련된 조항을 보완해야 한다.

군 복지시설의 지열시스템과 태양열시스템 경제성 평가 사례 연구 (A Case Study on Economic Analysis of a Solar Water Heating System and a Ground Source Heat Pump System Applied to a Military Building)

  • 이종찬;박용호;이강;이상호
    • 한국건설관리학회논문집
    • /
    • 제10권4호
    • /
    • pp.111-118
    • /
    • 2009
  • 본 연구는 군 복지시설인 육군 OO회관에 신 재생에너지 중 태양열 및 지열시스템을 적용했을 때, 각각의 효율성과 경제성을 분석하여 그 성능을 평가하였다. 연구 대상 건물은 철근콘크리트구조로서 건물 규모가 지하 1층 지상 3층이며 연면적이 약 2,917$m^2$인 건물이다. 건물의 용도는 목욕탕, 식당, 객실 및 사무실이며, 연간 냉 난방 에너지 소비량 판단 및 분석을 위해 e-Quest 시뮬레이션을 이용하였다. 신 재생에너지 적용에 대한 경제성 평가는 RETScreen 시스템을 이용하였다. 단, 신 재생에너지 시스템 사용은 연구대상 건물을 표준공사비로 판단했을 때 공사비의 5% 범위내로 한정하였다. 신 재생 에너지시스템 적용시 태양열시스템은 급탕용으로, 지열시스템은 냉방용으로 하였다. 연구결과 태양열시스템이 지열시스템보다 효과적이었다. 지열시스템은 투자비 상환시점이 약 16년 6개월 이후인 반면, 태양열시스템은 약 3년 11개월 이후에 가능한 것으로 판단되었다. 향후 화석에너지의 고갈과 지구온난화 등의 문제 해결을 위한 방안으로서 신 재생에너지의 이용 확대가 예상되며, 이에 군에서도 안정적인 에너지 수급을 위해 지속적인 발전이 되길 기원한다.

유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발 (Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm)

  • 김민정;박문서;이현수;이정훈;이광표
    • 한국건설관리학회논문집
    • /
    • 제16권5호
    • /
    • pp.54-64
    • /
    • 2015
  • 모듈러 건축공법은 공장 생산, 운송, 현장설치 프로세스를 통해 기존 현장중심 건축공법에 비해 품질향상 및 공기단축이 가능한 특징을 가지고 있다. 특히 모듈러 유닛의 제작과 시공이 분리되어 수행되기 때문에 다수의 프로젝트가 동시에 수행될 경우 각 프로젝트에 따라 생산해야하는 모듈의 크기, 수량, 납기일, 생산 유형 및 과정을 고려하는 SCM(Supply Chain Management) 관점의 공장 생산 공정 계획 수립이 필요하다. 그러나 현재 모듈러 유닛 공장 생산 계획은 개별 프로젝트 중심으로 수립되고 있어 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 프로젝트 요구조건들을 동시에 고려한 공장 생산계획을 도출하는데 한계가 있다. 따라서 본 연구에서는 다양한 변수 간 상호 연계성 및 제약조건으로 공정 계획 최적화 결과 도출이 가능한 유전자 알고리즘 방법을 통해 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 요구사항이 반영된 모듈러 유닛 공장 생산 공정계획 최적화 수립 모델을 제시하며 이를 사례분석을 통해 검증하였다. 연구 결과, 기존 다중프로젝트의 공장생산계획에 비해 평균 7.9%의 현장설치 공기단축 및 43%의 최대 야적장 이용률 감소가 가능하였다. 향후 본 연구 내용을 바탕으로 제약 조건 범위 확장 및 생산성 데이터 추가가 될 경우 다중 모듈러 건축 프로젝트의 모듈러 유닛 공장 생산 계획 수립과 현장시공프로세스 구축을 동시에 지원할 수 있는 기초 자료로 활용될 수 있다.

일본 공적역모기지의 변화와 시사점 (A Study on the Change and the Hint of Public Reverse Mortgage System in Japan)

  • 유선종
    • 한국주거학회논문집
    • /
    • 제16권5호
    • /
    • pp.49-56
    • /
    • 2005
  • This study will focus on status and structure of Japanese public reverse mortgage that has been changed since 1980. Especially, on newly introduced long-term supporting system for living fund after 2003. Private housing construction companies studied preceding cases of real estate products with reverse mortgage theory and also induced learning point from the change of Japanese public reverse mortgage market. From this on the purpose of this study is suggesting a better plan for successful reverse mortgage introduction in Korea. The data and articles of Japanese reverse mortgage are used for this study, also reverse mortgage related data are collected from web-site and research reports from the inside and outside of the country. From the total postal survey in September, 2004, the system contents after Year 2003 are described here. As described above, reverse mortgage is a way to support public social pension system and expected to play an important role as an assisting method for stable housing and supporting living cost to the aged. Eventually, it is necessary to find a way for introducing a public reverse mortgage as a welfare system for low income people.