• Title/Summary/Keyword: existing load

Search Result 2,223, Processing Time 0.027 seconds

A novel preloading method for foundation underpinning for the remodeling of an existing building

  • Wang, Chengcan;Han, Jin-Tae;Kim, Seokjung;Jang, Young-Eun
    • Geomechanics and Engineering
    • /
    • v.24 no.1
    • /
    • pp.29-42
    • /
    • 2021
  • The utilization of buildings can be improved by extending them vertically. However, the added load of the extension might require building foundations to be underpinned; otherwise, the loads on the foundations might exceed their bearing capacity. In this study, a preloading method was presented aiming at transferring partial loads from existing piles to underpinning piles. A pneumatic-type model preloading device was developed and used to carry out centrifuge experiments to evaluate the load-displacement behavior of piles, the pile-soil interaction during preloading, and the additional loading caused by vertical extension. The results showed that the preloading devices effectively transfer load from existing piles to underpinning piles. In the additional loading test of group piles, the load-sharing ratio of a pile increased with its stiffness. The load-sharing ratio of a preloaded micropile was less than that of a non-preloaded micropile as a result of the reduction in axial stiffness caused by preloading before additional loading. Therefore, a slight reduction of the load-sharing capacity of an underpinning pile should be considered if the preloading method is applied. Further, two full scale preloading devices was developed. The devices preload underpinning piles and thereby produce reaction forces on a reaction frame to jack existing piles upward, thus transferring load from the existing piles to the underpinning piles. Specifically, screw-type and hydraulic-jack type devices were developed for the practical application of foundation underpinning during vertical extension, and their operability and load transfer effect verified via full-scale structural experiments.

Resistance Model for Reliability Analysis of Existing Steel Girder Bridges (강거더 교량의 신뢰성해석을 위한 저항모델 개발)

  • Eom, Jun Sik
    • Journal of Applied Reliability
    • /
    • v.13 no.4
    • /
    • pp.241-252
    • /
    • 2013
  • Because of financial and safety concerns, there are needs for more accurate prediction of bridge behavior. Underestimation of the bridge load carrying capacity can have serious economic consequences, as deficient bridges must be repaired or rehabilitated. Therefore, the knowledge of the actual bridge behavior under live load may lead to a more realistic calculation of the load carrying capacity and eventually this may allow for more bridges to remain in service with or without minor repairs. The presented research is focused on the reliability evaluation of the actual load carrying capacity of existing bridges based on the field testing. Seventeen existing bridges were tested under truck load to confirm their adequacy of reliability. The actual response of existing bridge structures under live load is measured. Reliability analysis is performed on the selected representative bridges designed in accordance with AASHTO codes for bridge component (girder). Bridges are first evaluated based on the code specified values and design resistance. However, after the field testing program, it is possible to apply the experimental results into the bridge reliability evaluation procedures. Therefore, the actual response of bridge structures, including unintentional composite action, partial fixity of supports, and contribution of nonstructural members are considered in the bridge reliability evaluation. The girder distribution factors obtained from the tests are also applied in the reliability calculation. The results indicate that the reliability indices of selected bridges can be significantly increased by reducing uncertainties without sacrificing the safety of structures, by including the result of field measurement data into calculation.

Experimental study on the tunnel behavior induced by the excavation and the structure construction above existing tunnel (기존터널 상부지반 굴착 후 구조물 설치에 따른 터널거동에 관한 실험적 연구)

  • Cha, Seok-Kyu;Lee, Sangduk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.640-655
    • /
    • 2018
  • Recently, the construction of the urban area has been rapidly increasing, and the excavation work of the ground has been frequently performed at the upper part of the existing underground structures. Especially, when the structure is constructed after the excavation of the ground, the loading and unloading process in the ground under the excavation basement can affect the existing underground structures. Therefore, in order to maintain the stability of the existing underground structure due to the excavation of the ground, it is necessary to accurately grasp the influence of the excavation and the structure load in the adjoining part. In this study, the effect of the excavation of the ground and the new structure load on the existing tunnel was experimentally implemented and the influence of the adjacent construction on the existing tunnel was investigated. For this purpose a large testing model with 1/5 scale of the actual size was manufactured. The influence of ground excavation, width of the load due to new structure, and distance between centers of tunnel and of excavation on the existing tunnel was investigated. In this study, it was confirmed that the influence on the existing tunnel gets larger, as the excavation depth get deeper. At the same distance, it was confirmed that the tunnel displacement increased up to three times according to the increase of the building load width. That is, the load width influences the existing tunnel larger than the excavation depth. As the impact of the distance between centers of tunnel and of excavation, it was confirmed that tunnel crown displacement decreased by 48%. The result showed that a tunnel is located in the range of 1D (D: tunnel diameter) from the center of excavation, the effect of excavation is the largest.

Structural behavior of R/C Beam Strengthened with Steel Plate, Carbon Fiber Sheets, and Carbon Fiber Laminate. (강판, 탄소섬유쉬트, 탄소섬유판으로 휨보강된 천근콘크리트보의 구조적 거동)

  • Lee, Young-Jea;Moon, Heui-Jeung;Lee, Kyung-Un;Jung, Sang-Jin;Chung, Lan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.10a
    • /
    • pp.691-696
    • /
    • 1997
  • In recent years, stengthening of beam by steel plate, carbon fiber sheets, and carbon fiber laminate is spotlighted in order to repair and rehabilitation of R/C structures. In this study, 3 method of rehabilitation technic are analyzed from the tests. Test parameters are the width of cracks, the method of repair and rehabilitation, the magnitude of existing load. Deflection, failure load, strains of reinforcing bar, strains of sheet and plates are measured during tests. The failure mode and ultimate load are analyzed from these measured data. Test result shows that the width of cracks and the magnitude of existing load do not make any difference of ultimate flexural capacity.

  • PDF

Experimental Study for Load Distribution Characteristics of Existing and Reinforcing Piles (기존말뚝과 보강말뚝의 하중분담 특성에 관한 실험적 연구)

  • Cho, Seonghun;Choi, Kisun;Cho, Samdeok;You, Youngchan;Choi, Changho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.12
    • /
    • pp.87-95
    • /
    • 2014
  • Recently, there are increasing technical needs for foundation retrofit project such as vertical extension of apartment building. This paper focuses on the load distribution characteristics of existing and reinforcing piles when reinforcing pile is installed to the existing foundation. Allowable bearing load was initially applied on the foundation slab supported with four existing piles and then, one reinforcing pile was installed at the center of foundation slab and additional load was applied. The experimental results showed the Load Distribution Ratio (LDR) between existing and reinforcing piles converged after the applied load exceeded allowable bearing capacity of all piles. Laboratory tests were also performed for the cases of 60 %, 80 %, 100 % unloading level of allowable bearing load. After unloading step, one reinforcing pile was installed at the center of foundation slab and additional load was applied. The results showed that reloading load level at which LDR between existing and reinforcing piles converged decreased as the amount of unloading load increased.

A Study on the Load Forecasting Methods of Peak Electricity Demand Controller (최대수요전력 관리 장치의 부하 예측에 관한 연구)

  • Kong, In-Yeup
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.9 no.3
    • /
    • pp.137-143
    • /
    • 2014
  • Demand Controller is a load control device that monitor the current power consumption and calculate the forecast power to not exceed the power set by consumer. Accurate demand forecasting is important because of controlling the load use the way that sound a warning and then blocking the load when if forecasted demand exceed the power set by consumer. When if consumer with fluctuating power consumption use the existing forecasting method, management of demand control has the disadvantage of not stable. In this paper, load forecasting of the unit of seconds using the Exponential Smoothing Methods, ARIMA model, Kalman Filter is proposed. Also simulation of load forecasting of the unit of the seconds methods and existing forecasting methods is performed and analyzed the accuracy. As a result of simulation, the accuracy of load forecasting methods in seconds is higher.

A Study on the Digital Unit Development for Turbine Load Set Control (Turbine Load Set 조정을 위한 Digital Unit 개발)

  • Moon Yong-Seon;Jeong Ho-Jin;Kang Sung-Ryul;Choi Hyeong-Yoon
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.9 no.3
    • /
    • pp.498-503
    • /
    • 2005
  • As important device that decide output load in superannuated thermoelectric power plant which do Turbine Load Set Motor device. This generation of electric power system operated Set Up Range Motor according to Set Up value that operator manufactures by hand circumvolve, and generation of electric power output load derision is consisted by internal action including Motor Therefore, in this research passively output load operated Turbine Motor Drive equipment that can have existing Turbine Load Set Motor Performance developing Digital Drive Unit device design. Also control algorithm implementation and existing Turbine Load Set Motor Drive and connection possibility through designed controlling system to connect basis function that decide development output load with Digital Drive Unit that designed also with existing Motor Drive Unit and can be operated.

Improvement to Crack Retardation Models Using ″Interactive Zone Concept″

  • Lee, Ouk-Sub;Chen, Zhi-Wei
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.3 no.4
    • /
    • pp.72-77
    • /
    • 2002
  • The load interaction effect can be best illustrated by the phenomenon of overload retardation. Some prediction methods for retardation are reviewed and the problems discussed in the present paper. The so-called under-load effect much of the retardation disappears if a very low level minimum stress follows the overload, is also of importance for a prediction model to work properly under random load spectrum. The concept of Interactive Zone (IZ) fully considering reversed plasticity during unloading was discussed. This IZ concept can be combined with existing models to derive some improved models that can naturally take account of the under-load effect. Some simulations by IZ improved models for test under complex load sequences including multiple overloads and both over/under loads are compared with test results. It is seen that the improvement by IZ concept greatly enhanced the ability of existing models to accommodate complex load interaction effects.

Design of Tower Damper Gain Scheduling Algorithm for Wind Turbine Tower Load Reduction (풍력터빈 타워 하중 저감을 위한 타워 댐퍼 게인 스케줄링 알고리즘 설계)

  • Kim, Cheol-Jim;Kim, Kwan-Su;Paek, In-Su
    • Journal of the Korean Solar Energy Society
    • /
    • v.38 no.2
    • /
    • pp.1-13
    • /
    • 2018
  • This paper deals with the NREL (National Renewable Energy Laboratory) 5-MW reference wind turbine. The controller which include MPPT (Maximum power point tracking) control algorithm and tower load reduction control algorithm was designed by MATLAB Simulink. This paper propose a tower damper algorithm to improve the existing tower damper algorithm. To improve the existing tower damper algorithm, proposed tower damper algorithm were applied the thrust sensitivity scheduling and PI control method. The thrust sensitivity scheduling was calculated by thrust force formula which include thrust coefficient table. Power and Tower root moment DEL (Damage Equivalent Load) was set as a performance index to verify the load reduction algorithm. The simulation were performed 600 seconds under the wind conditions of the NTM (Normal Turbulence Model), TI (Turbulence Intensity)16% and 12~25m/s average wind speed. The effect of the proposed tower damper algorithm is confirmed through PSD (Power Spectral Density). The proposed tower damper algorithm reduces the fore-aft moment DEL of the tower up to 6% than the existing tower damper algorithm.

A Study on the On-Line Fuzzy ULTC Controller Design Based on Multiple Load Center Points (다중 부하중심점에 기반한 온라인 퍼지 ULTC 제어기 설계에 대한 연구)

  • Ko, Yun-Seok
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.12
    • /
    • pp.514-521
    • /
    • 2006
  • The existing ULTC operation control strategy based on the measured data deteriorates the voltage compensation capability making the efficient corresponding to the load variation difficult by following the fixed load center point voltage. Accordingly, this paper proposes a new on-line fuzzy ULTC controller based on the designed multiple load center points which can improve the voltage compensation capability of ULTC and minimize voltage deviation by moving in real-time the load center point according to the load variation to an adequate position among the multiple load center points designed using the clustering technique. The Max-Min distance technique is adopted as the clustering technique for the decision of multiple load points from measured MTr load current and PTr voltage, and the minimum distance classifier is adopted for the decision of fuzzy output membership function. To verify the effectiveness of the proposed strategy, Visual C++ MFC-based simulation environments is developed. Finally, the superiority the proposed strategy is proved by comparing the fuzzy ULTC operation control results based on multiple load center points with the existing ULTC operation control results based on fixed load center point using the data for three day.