Effectiveness of a Business Model for Adopting a Construction Machine Guidance System (건설장비 가이던스 시스템 도입을 위한 비즈니스 모델 효과)

  • Moon, Sung-Woo
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.24-32
    • /
    • 2018
  • A construction machine guidance system is an assistance system that helps construction equipment operators dig grounds during excavation work at a construction site. This system has long been applied in the overseas countries of the United States, Japan and Europe. However, the system has not been paid much attention in Korea. The objective of this paper is to present a business model for adopting construction machine guidance systems in Korea and evaluate the effectiveness of applying the system to excavation work. The business model in this study shows a new process of applying construction machine guidance system, business stakeholders and revenues, and suggests the benefits to the business stakeholders. A field test of the construction machine guidance system proves that the system can be applied as a tool that can improve the productivity of excavation work. This productivity improvement consequently demonstrates that the business model in this study is a prospective challenge in improving the effectiveness of excavation work at the construction site.

Stereo-photogrammetry Analysis for Over-break Control (여굴 제어를 위한 입체사진측량기법 분석)

  • Kim, Byung-Ryeol;Jeong, Min-Su;Jin, Yeon-Ho;Choi, Sung-Oong
    • Explosives and Blasting
    • /
    • v.36 no.1
    • /
    • pp.12-19
    • /
    • 2018
  • When an underground limestone mine selects room-and-pillar mining method, in which the stability of mine openings is maintained by leaving safety pillars, the stability of safety pillars is always incompatible with their productivity. Therefore, the engineering decision for stability and productivity is essential. In this study, a progress of excavation faces by conventional blasting pattern has been examined in field for investigating over-break and stereo-photogrammetry method has been applied to this field measurement for improvement of accuracy. Also this result has been reflected instantly to composite blasting pattern by feedback, for minimizing overbreak. Field tests showed the relevant results that $3.5m^2$ in over-break out of $70m^2$ in total excavation face has been decreased, that is 5% of reduction rate in maximum.

CONSTRUCTION MANAGEMENT OF TUNNELLING IN SEVERE GROUNDWATER CONDITION

  • Young Nam Lee;Dae Young Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.655-661
    • /
    • 2005
  • For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3 km upstream of the powerhouse and headrace tunnel of 20 km in length and penstock of 440 m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site; the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20 bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflow raised the water level inside tunnel to 70 cm, 17% of tunnel diameter (3.9 m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made for the excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.

  • PDF

Performance Effectiveness Case Study of the Machine Guidance System for Dozer Eartwrok Grading Work (도저 정지작업 시 머신 가이던스 시스템 적용에 따른 토공성과 향상 사례분석)

  • Moon, Sungwoo;Kim, Sangtae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.78-86
    • /
    • 2020
  • Dozer is an expensive construction equipment and has a significant performance impact on earthwork performance. A machine guidance system has been applied to dozer equipment as a solution that can improve the performance. The system can provide earthwork-related information to equipment operators so that earthworks can be carried out with minimum support from surveyors. Construction Equipment Machine guidance has the function of supporting earthwork according to an earthwork plan by providing excavation-related information to machine operators. The objective of this study is to evaluate the performance improvement of a machine guidance system for an dozer earthwork operation, and to compare the machine guidance method with the traditional method. The performance has been evaluated in two folds: 1) productivity and 2) accuracy. The productivity shows the quantity of earthwork for a given unit time. The accuracy shows the deviation of grading level from the designed level on the construction drawing for earthwork. The machine guidance system has been applied to a testing bed in a construction site. Data comparison analysis showed that the earth earthwork had 46.59% improvement in productivity as well as 46.96% improvement in accuracy, and is expected to provide a tool for applying smart constrction to the earthwork operation.

Development of an Optimal Trajectory Planning Algorithm for an Automated Pavement Crack Sealer

  • Yoo, Hyun-Seok;Kim, Young-Suk
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.35-44
    • /
    • 2012
  • In the last two decades, several tele-operated and machine-vision-assisted systems have been developed in the construction and maintenance area, such as pavement crack sealing, sewer pipe rehabilitation, and excavation. In developing such tele-operated and machine-vision-assisted systems, trajectory plans are very important tasks for the optimal motions of robots whether their environments are structured or unstructured. This paper presents an optimal trajectory planning algorithm used for a machine-vision-assisted automatic pavement crack sealing system. In this paper, the performance of the proposed optimal trajectory planning algorithm is compared with the greedy trajectory plans, which are used in the previously developed pavement crack sealing systems. The comparison is based on the computational cost vs. the overall gains in crack sealing efficiency. Finally, it is concluded that the proposed algorithm plays an important role in the productivity improvement of the developed automatic pavement crack sealing system.

Tunneling in Severe Groundwater Inflow Condition (지하수 과다유입 조건하에서의 터널굴착)

  • Lee, Young-Nam;Kim, Dae-Young
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.2
    • /
    • pp.67-76
    • /
    • 2006
  • For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3 m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3km upstream of the powerhouse and headrace tunnel of 20km in length and penstock of 440m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflowraised the water level inside tunnel to 70cm, 17% of tunnel diameter (3.9m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made forthe excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.

  • PDF

Development of a Machine Control Technology and Productivity Evaluation for Excavator (굴착기 머신 콘트롤 기술 개발 및 생산성 향상 평가)

  • Lee, Min Su;Shin, Young Il;Choi, Seung Joon;Kang, Han Byul;Cho, Ki Yong
    • Journal of Drive and Control
    • /
    • v.17 no.1
    • /
    • pp.37-43
    • /
    • 2020
  • An intelligent excavator can be divided into Machine Guidance (MG), semi-automatic, and unmanned by technology. The MG technology excavator is equipped with a tilt sensor on each link of the excavator and a GPS is installed on the excavator body to inform the user of the position of the excavator bucket end. Machine control (MC) technology that assists the user's work can be divided into semi-automatic and fully automatic technology. The semi-automatic MC equipment has already been commercialized by Komatsu and Caterpillar. The MC excavator is equipped with an electro-hydraulic system, sensors and controllers to control the excavator bucket end according to the user's needs. In this study, the semi-automated excavator modified based on manual excavator, is equipped with an electro-hydraulic system, a controller system, multi-sensors and a control algorithm is developed to assist in excavation work such as leveling and grading. By applying the developed technology, it was possible to confirm productivity improvement compared to manual digging and leveling work. In the future, further research to improve the accuracy of the hydraulic precision control and collaborative work with heterogeneous construction equipment such as dump truck and automated collaboration tasks technology could be developed.

Development of an Optimal Trajectory Planning Algorithm for Automated Pavement Crack Sealer (도로면 크랙실링 자동화 장비의 최적 경로계획 알고리즘 개발)

  • Yoo, Hyun-Seok;Lee, Jeong-Ho;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.68-79
    • /
    • 2010
  • During the last two decades, several tele-operated and machine-vision-assisted systems have been developed in construction and maintenance area such as pavement crack sealing, sewer pipe rehabilitation, and excavation. In developing such tele-operated and machine-vision-assisted systems, trajectory plans are very important tasks for optimal motions of robots whether their environments are structured or unstructured. This paper presents an optimal trajectory planning algorithm used for a machine-vision-assisted automatic pavement crack sealing system. In this paper, the performance of the proposed optimal trajectory planning algorithm is compared with the greedy trajectory plans which are used in previously developed pavement crack sealing systems. The comparison is based on computational cost versus overall gains in crack sealing efficiency. Finally, it is concluded that the proposed algorithm plays an important role in productivity improvement of the automatic pavement crack sealing system developed.

Development of a Soil Distribution Method and Equipment Operation Models Using Worker's Heuristics (작업자의 휴리스틱을 적용한 토량배분 및 장비운영 모델 개발)

  • Lim, So-Young;Kim, Sung-Keun;Ahn, Seo-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.3
    • /
    • pp.551-564
    • /
    • 2016
  • Earthworks are the fundamental steps in a construction job, and are mainly comprised of smaller tasks performed by construction machinery. The productivity of the construction job can be improved by optimizing excavation, filling, and other such operations. Earthworks involve a lot of mechanical work performed by the collaboration between various kinds of construction equipment, which in turn leads to higher fuel consumption. Actual earthworks depend mostly on the intuition and experience of the driver of the machines, thus leading to inefficiency and environmental problems caused by unnecessary emission of carbon, Recently automated and information-oriented technologies are consistently being researched towards the improvement of efficiency of earthworks in the construction industry. The present research involves the introduction and understanding of the decision-making elements of heuristics which can be applied to the earthwork planning. A method is also suggested for creating an effective work path for construction machine to perform task packages (TP) for cutting and filling processes. A simulation test is performed to verify the effectiveness of suggested methods in terms of space interference and total moving distance of construction equipment.

Development of a Pavement Cutter for Eco-friendly Road Excavation Construction (친환경 도로굴착 시공을 위한 도로절단기 개발)

  • Kim, Kyoontai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.111-118
    • /
    • 2022
  • Recently, as underground facilities buried under roads in Korea are aging, the amount of underground facility maintenance work is rapidly increasing. For the maintenance and management of such underground facilities, the cutting work of the road pavement should be preceded. However, the conventional road pavement cutters used in Korea are not eco-friendly, and the reality is that they generate a lot of noise and cutting sludge (scattering dust). Therefore, in this study, the concept of the cutting sludge recovery device was derived, and an eco-friendly pavement cutter including this function was designed and manufactured. The developed equipment took about 20 to 30 seconds to cut 1m to a depth of 100 to 150mm. Also, the sludge suction performance was good in most sections, and the noise level of the equipment briefly measured at a distance of 2m was 82.7dB on average. However, due to the limitation that the developed equipment was at the level of the first prototype, the driving stability was somewhat low, and equipment abnormalities such as engine shutdown and sludge recovery performance decreased in some cases. The cutting performance and sludge recovery function will be more stable through tuning and improvement of the developed prototype in the future. In addition, we plan to quantitatively compare and analyze productivity by applying the improved prototype to actual field conditions.