• Title/Summary/Keyword: estimating unit

Search Result 415, Processing Time 0.031 seconds

A Study on Ship Motion Measurement System Using ADIS16480 Inertial Measurement Unit (ADIS16480 관성측정장치를 이용한 선체 운동 측정 시스템에 관한 연구)

  • Kim, Daejeong;Yim, Jeong-Bin
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2019.11a
    • /
    • pp.270-270
    • /
    • 2019
  • Although the Inertial Measurement Unit is applied to a variety of applications such as ships, submarines, and aircrafts, it is mainly used in the attitude measurement area. But since such equipment is expensive, it has been used only in special fields. In this study, the ship's seaworthiness is verified by measuring the speed, direction, gravity, and acceleration of the ship in real time using a low-cost Inertial Measurement Unit. A research method for estimating fIuid force coefficients was devised. Therefore, this study measured ship motion factors at sea, processed and analyzed the measured data, and evaluated the overall safety of the ship and estimated the resistance and steering performance of the ship.

  • PDF

Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage (사업기획단계에서의 현수교의 물량추정을 위한 모델연구)

  • Park, Weon-Tae;Chun, Kyoung-Sik
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.4
    • /
    • pp.24-29
    • /
    • 2015
  • Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF

Cost Estimating of Heat and Electricity on a Gas-Turbine Cogeneration (가스터빈 열병합발전에서 생산된 열과 전기의 원가산정)

  • Kim, Deok-Jin
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.351-356
    • /
    • 2008
  • When various kinds of outputs are produced from a single energy system, the methodology which allocates the common cost to each output cost is very important because it is directly related with the profit and loss of producers and purchasers. In the cost allocation methodology of the heat and the electricity on a cogeneration, there are energy method, work method, proportional method, benefit distribution method, various exergetic methods, and so on. On the other hand, we have proposed a worth evaluation method which can be applied to any system. The definition of this methodology is that the unit cost of a product is proportion to the worth. Where, worth is a certain evaluating basis that can equalize the worth of products. In this study, we applied this methodology to a gas-turbine cogeneration which produces 119.2 GJ/h of electricity and 134.7 GJ/h of heat, and then we allocated 3,150 $/h of fuel cost to electricity cost and heat cost. Also, we compared with various cost allocation methods. As the result, we conclude that exergy of various kinds of worth basis evaluates the worth of heat and electricity most reasonably on this system.

  • PDF

Improvement of the storage coefficient estimating mehod for the clark model (Clark 단위도의 저류상수산정방법의 개선)

  • 윤태훈;박진원
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2002.05b
    • /
    • pp.1334-1339
    • /
    • 2002
  • The objective of this study is to help practicing engineers easily use the Clark model which is used for estimating the magnitude of design flood for small stream. A representative unit hydrograph was derived on the basis of the past rainfall-runoff data and unit hydrographs, and the storage coefficient of Clark model was estimated by using hydrograph recession analysis. Since the storage coefficient(K) is a dominating factor among the parameters of Clark method, a mulitple regression formula, which has the drainage area, main channel length and slope as parameters, is propsed to estimate K value of a basin where measured data are missing. The result of regression analysis showed that there is a correlation between a storage coefficient(K) and aforemetioned three parameters in homogenious basins. A regression formular for K was derived using these correlations in a basin of Han River, Nakdong River, Young River, Kum River and Sumjin River

  • PDF

Cost Estimating of Electricity and Steam on a Gas-Turbine Cogeneration (가스터빈 열병합발전에서 생산된 전기와 증기의 원가산정)

  • Kim, Deok-Jin
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.21 no.4
    • /
    • pp.252-259
    • /
    • 2009
  • When various kinds of outputs are produced from a single energy system, the methodology which allocates the common cost to each output cost is very important because it is directly related with the profit and loss of producers and purchasers. In the cost allocation methodology of the heat and the electricity on a cogeneration, there are energy method, work method, proportional method, benefit distribution method, various exergetic methods, and so on. On the other hand, we have proposed a worth evaluation method which can be applied to any system. The definition of this methodology is that the unit cost of a product is proportion to the worth. Where, worth is a certain evaluating basis that can equalize the worth of products. In this study, we applied this methodology to a gas-turbine cogeneration which produces 119.2 GJ/h of electricity and 134.7 GJ/h of steam, and then we allocated 3,150 $/h of fuel cost to electricity cost and steam cost. Also, we compared with various cost allocation methods. As the result, we conclude that reversible work of various kinds of worth basis evaluates the worth of heat and electricity most reasonably.

Development of an Approximate Cost Estimating Model for River Facility Construction at Planning Stage (이.치수형 하천공사 개략공사비 산정모델 개발)

  • Lee, Si-Wook;Lee, Jeong-Yoon;Park, Sung-Hwan;Choi, Jae-Joon;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.95-103
    • /
    • 2009
  • The case of rivers facilities works, expense the standard unit cost for the quality and a rough public corporation expense estimating of the rivers public corporation which is fixed form with the information available which it follows basic design phase absently and possibility of fluctuation. It exists many difficulties in rough public corporation expense estimating. The rivers public corporation expense rough estimating method of existing produces does not exist the amount of material of representative section of the rivers dike and the rough public corporation expense estimating method which is systematic with the method which multiples the seniority (M). The research sees the rough public corporation expense predictive model from the planning stage which is not basic design to consider the quality of the rivers facility public corporation. From this study, it can prevent the waste of national budget from the general public corporation and is more accurate and public corporation expense production possibly.

Proper Estimating Method for Environmental Preservation Cost in Road Projects (도로공사 환경보전비의 적정 산출 방안)

  • Park, Ji-Sun;Lee, Sea-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.3-10
    • /
    • 2012
  • The current enforcement regulation of "Construction Technology Management Act" prescribes calculation standard of environmental preservation cost in construction site. According to this standard, environmental preservation cost is calculated by using the quantity-per-unit costing method or applied fixed rate on direct cost. However, when calculated by using the quantity-per-unit costing method it is few items to put in the budget according to standard of construction estimate and in the case of using the fixed rate on direct cost it is not considering various characteristics of the construction site. Therefore, it is needed a improvement plan of estimating method and management system for environmental preservation cost. In this study, it surveyed the actual state of the environmental preservation cost according to magnitude of project, site location, anti-pollution facilities and etc. over 38 road projects. The research reported in this paper environmental preservation cost was variously distributed over construction sites. Thus it needs to estimating method and management system to consider characteristics of construction site for environmental preservation cost.

An Evaluation of Sampling Design for Estimating an Epidemiologic Volume of Diabetes and for Assessing Present Status of Its Control in Korea (우리나라 당뇨병의 역학적 규모와 당뇨병 관리현황 파악을 위한 표본설계의 평가)

  • Lee, Ji-Sung;Kim, Jai-Yong;Baik, Sei-Hyun;Park, Ie-Byung;Lee, June-Young
    • Journal of Preventive Medicine and Public Health
    • /
    • v.42 no.2
    • /
    • pp.135-142
    • /
    • 2009
  • Objectives : An appropriate sampling strategy for estimating an epidemiologic volume of diabetes has been evaluated through a simulation. Methods : We analyzed about 250 million medical insurance claims data submitted to the Health Insurance Review & Assessment Service with diabetes as principal or subsequent diagnoses, more than or equal to once per year, in 2003. The database was re-constructed to a 'patient-hospital profile' that had 3,676,164 cases, and then to a 'patient profile' that consisted of 2,412,082 observations. The patient profile data was then used to test the validity of a proposed sampling frame and methods of sampling to develop diabetic-related epidemiologic indices. Results : Simulation study showed that a use of a stratified two-stage cluster sampling design with a total sample size of 4,000 will provide an estimate of 57.04%(95% prediction range, 49.83 - 64.24%) for a treatment prescription rate of diabetes. The proposed sampling design consists, at first, stratifying the area of the nation into "metropolitan/city/county" and the types of hospital into "tertiary/secondary/primary/clinic" with a proportion of 5:10:10:75. Hospitals were then randomly selected within the strata as a primary sampling unit, followed by a random selection of patients within the hospitals as a secondly sampling unit. The difference between the estimate and the parameter value was projected to be less than 0.3%. Conclusions : The sampling scheme proposed will be applied to a subsequent nationwide field survey not only for estimating the epidemiologic volume of diabetes but also for assessing the present status of nationwide diabetes control.

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.