Immunological imbalance eventually results in the development of various diseases. A typical example is an imbalance of cytokines with immunomodulatory abilities. In this paper, we propose a two-variable delay model to anti-pro-inflammatory cytokine therapy for autoimmune diseases, which are caused by an imbalance between the pro and anti-inflammatory cytokines. The interaction between pro- and anti-inflammatory cytokines were modeled mathematically to investigate the relevance of cytokines in disease processes. The delay time was estimated to maintain the stability of a biologically important steady state. In particular, the effects of delay with anti-pro-inflammatory cytokines therapy in autoinflammatory diseases were studied.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.22
no.6
/
pp.577-583
/
2011
Radar performance test is one of the major steps for radar system design. However, it is restricted by time and cost when radar performance tests are performed with opportunity targets. So various simulated target generators are developed and used to evaluate radar performance. To simulate the target's range, most of simulated target generators are developed with optical line or DRFM(Digital RF Memory) technique but there are many restrictions such as limit of range imitation and test scenario because of their original usage. In this paper, DDL(Digital Delay Line) module for development of simulated target generator is designed with precise range simulation and easily embodiment feature. And pulse recognition and delay gap detection technique are used to simulate the time delay without distortions. Developed DDL module performances are verified through their performance tests and test results are described in this paper.
Park, Jong-Dae;Park, Chan-Hong;Park, Byeong-Ho;Ahn, Chang-yeop;Seong, Hyeon-Kyeong
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2014.10a
/
pp.182-185
/
2014
In this paper, the ADC performs research and development for high speed data transfers to minimize the optical delay. Have more $6{\mu}s$ delay in the data signal converting optical repeater transmission system existing there has been a limit on the high-speed data transmission, and signal conversion. The need to develop a new technique to reduce the delay in time within $2{\mu}s$ data signal converted by using this direct conversion system. It is desired the development of the core technologies necessary for the signal transduction component, such as mobile communications LTE, LTE advanced service transport network is established, the delay time $3{\mu}s$ technology for reducing the delay time in the signal converting a revolutionary step is applied in this paper we have developed an ADC.
Kim, Tae Hyun;Lee, Sangkyung;Lee, Chang Hwa;Yim, Sin Hyuk
Journal of the Optical Society of Korea
/
v.20
no.2
/
pp.300-304
/
2016
A dual loop optoelectronic oscillator (OEO) based on an acousto-optic modulator (AOM) for single mode operation with an acousto-optic delay line is demonstrated in this paper. When the OEO operates, the free spectral range is a function of the total loop length of the OEO, which is mainly dependent on the propagation time of the acoustic wave in the AOM. Due to the huge difference in the magnitude between the speed of light and the acoustic velocity in the AOM, the effective loop length converted to light-propagation length of the OEO increases to 3.8 km. With 150 MHz oscillation frequency, phase noise of -118 dBc/Hz at 10 kHz frequency offset, and -140 dBc/Hz at 200 kHz frequency offset, is achieved.
The purpose of this study was to extend our understanding of the developmental antecedents of delay of gratification in infancy. The first goal was to examine direct effects of one feature of an infants’ temperament and of positive and negative parenting assumed at age one on children’s delay of gratification six months later. The second goal of the study was to test the interactive effect of early infant temperament and parenting on children’s delay of gratification. It was hypothesized that 1) less negative infants at 12 months would delay gratification longer six months later, 2) children of parents who provided more positive and sensitive feedback would delay gratification longer than children with parents who were more negative and less sensitive, and 3) there would be differential prediction of parenting for children who scored high and low in negative emotionality as infants. Toward this end, 81 infants were observed interacting at one year of age with their mothers and fathers during laboratory assessments to obtain measures of parenting and infant negative emotionality. At 18 months of age, the child’s capacity to delay touching attractive objects was measured. The main effects of infant negative emotionality and of mothering on children’s delay of gratification were not detected at standard levels of significance. Differential effects of parenting on children’s delay of gratification for infants with low or high negative emotionality, too, were not detected. However, the anticipated effect of fathering on delay of gratification was found in some analyses, indicating that the more positive fathering children received, the longer they could delay gratification in the laboratory six months later.
Journal of Construction Engineering and Project Management
/
v.2
no.3
/
pp.17-29
/
2012
Delays are one of the biggest problems facing by the construction industry and they have significant financial and social impact in construction projects. The paper presents a framework of Delay Analysis System (DAS) with the aim of analysing the impact of delay factors in Libyan construction projects. The system has designed by integrating the possible delay factors, critical activities of a project using@risk simulator. A case study of building project was demonstrated to identify the impact of delays and the sensitivity of delay factor. The case study result showed that the project might be delayed by 97 to 103 days in comparison to the planned duration. The developed DAS is a tool for analysing and identify the impacts of delay factors and assist to construction manager to take necessary measure in reducing the delay impact. The paper provides a methodology for analysing the possible delay impact in a construction project and informing to construction manager in advance of the possible delay factors.
The Transactions of the Korean Institute of Electrical Engineers D
/
v.53
no.7
/
pp.501-508
/
2004
In this paper, a coordinated scheduling algorithm is proposed to reduce end-to-end delay in distributed control of systems. For the algorithm, the analysis of practical end-to-end delay in the worst case is performed priory with considering implementation of the systems. The end-to-end delay is composed of the delay caused by multi-task scheduling of operating systems, the delay caused by network communications, and the delay caused by asynchronous timing between operating systems and network communications. Through some simulation tests based on CAN(Controller Area Network), the proposed worst case end-to-end delay analysis is validated. Through the simulation tests, it is also shown that a real-time distributed control system designed to existing worst case delay cannot guarantee end-to-end time constraints. With the analysis, a coordinated scheduling algorithm is proposed here. The coordinated scheduling algorithm is focused on the reduction of the delay caused by asynchronous timing between operating systems and network communications. Online deadline assignment strategy is proposed for the scheduling. The performance enhancement of the distributed control systems by the scheduling algorithm is shown through simulation tests.
The problem of sound source localization is to determine the position of sound sources using the measurement of the acoustic signals received by microphones. To develop a good sound source localization system which is applicable to a mobile platform such as robots, a time delay estimator with low computational complexity and robustness to background noise or reverberations is necessary. In this paper, an explicit adaptive time delay estimation method for a sound source localization system is proposed. Proposed explicit adaptive time estimation algorithm employs direct adaptation of the delay parameter using a transform-based optimization technique, rather than...
In this paper, a new GPS navigation algorithm which considering the SA fade away, is proposed. Ionospheric delay and Tropospheric: delay is modeled and estimated is the proposed method. The experimental results show that precise positioning without DGPS or other sensors can be possible. It will be easily applied to car or marine navigation without changes.
In this paper, we investigate some results on complex delay-differential equations of the classical Malmquist theorem. A classic illustrations of their results states us that if a complex delay equation w(t + 1) + w(t - 1) = R(t, w) with R(t, w) rational in both arguments admits (concede) a transcendental meromorphic solution of finite order, then degwR(t, w) ≤ 2. Development and upgrade of such results are presented in this paper. In addition, Borel exceptional zeros and poles seem to appear in special situations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.