• Title/Summary/Keyword: critical management factor

Search Result 589, Processing Time 0.026 seconds

Analysis of Longevity Factor through Japan shinise (일본 시니세를 통해 본 장수요인분석)

  • Choi, Seung-Il;Kim, Dong-Il
    • Journal of Digital Convergence
    • /
    • v.13 no.1
    • /
    • pp.85-92
    • /
    • 2015
  • Recently more and more shortened of corporation's sustainable longevity at the enterprise, and enterprise environment is also changing drastically. In this study, we wanted to obtain a solution that enable to continue the company's corporate longevity through critical factor analysis of the Japan Shinise. In the analysis results of Japan corporation as Doraya, Deicoko, Shinise longevity, we can explain about critical factors like that credit, tradition, customization, products development, changes of management methods and finding a global new markets. Also, In this study, analyzed a significance of critical factors for focusing on each cases and theories using Analytic Hierarchy Process(AHP), and did prediction and analysis about critical longevity factors. However, it need to collect sufficient data and a lots of variables for input. because the sample may be it insufficient. Results of the study, will be expected to be a useful guide for analysis of longevity factors at the company in the future.

The Development of Risk Management Process Model during Bidding Phase for Success of Oversea Construction Projects (성공적 해외건설사업을 위한 입찰단계의 리스크 관리 프로세스 모델 개발 - 발전 플랜트 EPC 사업을 중심으로 -)

  • Seo, Jae-Pil;Ryu, Han-Guk;Son, Bo-Sik;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.76-86
    • /
    • 2016
  • Recently, the Contracts of International Construction Business has been decreased from the beginning of 2015 in Korea, although it has been steadily increased until 2014. This trend could be caused by Low-Price Contracts, the lack of Know-how and experience in operating, the poor management of Claims and Low-Profitability in Business. It has been recognized that the qualitative improvement of Business Contacts are necessary for successful Projects. In the Bidding Process, therefore, Experience data as In-House Data and Lessons Learned for projects should be strategically involved to assure riskless offers. Accordingly the Proposal Process are needed to be organized and enhanced by including processes for risks review about technical, marketing and commercial part during the bidding. This paper proposes a Risk Management Process model during Bidding Phase, using Risk Evaluation Method through the project life-cycle. The Concept of Model is to define CSF (Critical Success Factor) in the bidding process and Risk Factors are linked to CSF and Organization based on RAM (Responsibility assignment matrix).

Recipient Management before Lung Transplantation

  • Kim, Hyoung Soo;Park, Sunghoon
    • Journal of Chest Surgery
    • /
    • v.55 no.4
    • /
    • pp.265-273
    • /
    • 2022
  • Lung transplantation is considered a viable treatment option for patients with end-stage lung disease. Recent decades have seen a gradual increase in the number of lung transplantation patients worldwide, and in South Korea, the case number has increased at least 3-fold during the last decade. Furthermore, the waiting list time is becoming longer, and more elderly patients (>65 years) are undergoing lung transplantation; that is, the patients placed on the waiting list are older and sicker than in the past. Hence, proper management during the pre-transplantation period, as well as careful selection of candidates, is a key factor for transplant success and patient survival. Although referring and transplant centers should address many issues, the main areas of focus should be the timing of referral, nutrition, pulmonary rehabilitation, critical care (including mechanical ventilation and extracorporeal membrane oxygenation), psychological support, and the management of preexisting comorbid conditions (coronary artery disease, diabetes mellitus, gastroesophageal reflux disease, osteoporosis, malignancy, viral infections, and chronic infections). In this context, the present article reviews and summarizes the pre-transplantation management strategies for adult patients listed for lung transplantation.

Weight Analysis of Critical Success Factors for Business Intelligence System (비즈니스 인텔리젼스 시스템 성공요인의 중요도 분석)

  • Hong, Hyun-Gi
    • Journal of Digital Convergence
    • /
    • v.10 no.7
    • /
    • pp.93-98
    • /
    • 2012
  • The rapid change of business environments request the company to act more smart and intelligent in making business strategies and planning the business processes. To meet this requirement, we need to have smart Business Intelligent System(hereinafter "BI") in the company. On the one hand, many korean companies had already installed BI system, and the other hand some companies have plans to implement BI Systems additionally to their Information System. It is very important to have the pictures which factors are critical to the successful implementation of BI, and to survey which critical success factor(hereinafter CSF) are important compared to each factors. In this paper data was gathered from companies already have their BI Systems. We measured IT-Infra maturity, User Education, and Company Organization, and Company Business Strategy, which are the critical success factors for the BI System. After surveying the CSF of BI System, we measured the weights among these factors by AHP. Factor analysis resulted in 6 major factors (Eigenvalue > 1.0), and the AHP analysis showed the list of CSF's weight list according to its significance priorities. The results of this paper could be the valuable references for the implementing process of the BI System in korean company.

Study on the Critical Storm Duration Decision of the Rivers Basin (중소하천유역의 임계지속시간 결정에 관한 연구)

  • Ahn, Seung-Seop;Lee, Hyeo-Jung;Jung, Do-June
    • Journal of Environmental Science International
    • /
    • v.16 no.11
    • /
    • pp.1301-1312
    • /
    • 2007
  • The objective of this study is to propose a critical storm duration forecasting model on storm runoff in small river basin. The critical storm duration data of 582 sub-basin which introduced disaster impact assessment report on the National Emergency Management Agency during the period from 2004 to 2007 were collected, analyzed and studied. The stepwise multiple regression method are used to establish critical storm duration forecasting models(Linear and exponential type). The results of multiple regression analysis discriminated the linear type more than exponential type. The results of multiple linear regression analysis between the critical storm duration and 5 basin characteristics parameters such as basin area, main stream length, average slope of main stream, shape factor and CN showed more than 0.75 of correlation in terms of the multi correlation coefficient.

e-Learning Business Models and Critical Success Factors : An Empirical Assessment of e-Learning Firms (e-Learning 비즈니스 모델과 성공요인에 관한 연구)

  • Jeong Dae Yul;Seong Haeng Nam
    • Proceedings of the Korea Association of Information Systems Conference
    • /
    • 2004.11a
    • /
    • pp.431-443
    • /
    • 2004
  • Many e-Learning companies are incorporated for the last five years, but most of them are failed or merged by the other company. The main reasons are the absence of competitive strategies and recognition of critical success factors. There are many researches on the critical success factors of Information System (IS) and Electronic Commerce (EC) . We derived e-Learning success factors from the previous IS and EC researches. We classified the success factors into five dimensions, (1) contents management, (2) learner management, (3) business strategy, (4) organizational support and ability, (5) learning management system (LMS), and each dimension has 9 or more success factors measurement items. We surveyed the perceived importance of the success factors from the manager of South Korea e-Learning firms. The paper categorized the items into two or more factors for each dimension by the exploratory factor analysis. Finally, we conducted one-way ANOVA for each success factors by the business model. As a result, there is different importance level for each success factors by the business model. We concluded that each e-Learning company needs different strategies to their business model.

  • PDF

A Contingency Approach to KM Evaluation : Developing Two-Dimensional Instruments (지식경영 현황진단의 상황적 접근 : 이차원 진단측정도구 개발)

  • Yang, Sung-Byung;Koh, Joon
    • Knowledge Management Research
    • /
    • v.9 no.1
    • /
    • pp.23-38
    • /
    • 2008
  • This study develops a framework and instruments to diagnose the current knowledge management(KM) status of an organization and to suggest future KM implementation directions. Based on the comprehensive review of KM literature and KM case studies, we derive three main aspects(strategic, social and technical aspect) and seven critical factors(KM strategy, knowledge worker, organizational strucuture, organizational culture, KM processe, organizational knowledge, and information technology) for the successful KM implementation. The instruments developed in this study include every specific measurement items of each critical success factor, which are expected to help not only suggest a context-sensitive KM strategy but also evaluate current KM status of a designated organization. By introducing two dimensions of KM evaluation(effectiveness and necessity), a more holistic and contingent view of KM can be assured. Academic contributions as well as practical implications are discussed. Study limitations and future research directions are also provided.

  • PDF

Critical Environmental Management Factor by Project Participants for Considering Work Importance and Difficulty (업무 중요도-난이도를 고려한 프로젝트 참여주체별 핵심 환경관리 항목 도출)

  • Hong, Suk-Kyoo;Kim, Chang-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.214-215
    • /
    • 2013
  • Recently, Construction industry has been trying to reduce environmental impacts reflecting the global trend 'Green Growth'. However most of previous studies focused on operation & maintenance phases and do not have been approached construction phases. In addition, environmental management factors by project participants are assessed with only weight of factors, overlooking these work difficulty. Therefore This study aims to deducted the critical environmental management factors by project participants considering work difficulty in plan, design and construction phase. The basis data is collected through literature reviews and interview targeting each project participant and analyze these data using importance-difficulty analysis(IDA).

  • PDF

A preliminary study on material effects of critical heat flux for downward-facing flow boiling

  • Wang, Kai;Li, Chun-Yen;Uesugi, Kotaro;Erkan, Nejdet;Okamoto, Koji
    • Nuclear Engineering and Technology
    • /
    • v.53 no.9
    • /
    • pp.2839-2846
    • /
    • 2021
  • In this study, experiments of downward-facing flow boiling were conducted to investigate material effects on CHF. Experiments were conducted using aluminum, copper, and carbon steel. It was found that different materials had different CHFs. Aluminum has the biggest CHF while copper has the lowest CHF for each mass flux. After experiment, surface wettability increased and surface became rougher, which was probably due to the oxidation process during nucleate boiling. The CHF difference is likely to be related to the surface wettability, roughness and thermal effusivity, which influences the bubble behavior and in turn affects CHF. Further studies are needed to determine which factor is dominant.

Critical Factors Affecting No-dispute Performance: A Case of Ethiopian Public Construction Projects

  • Sinesilassie, Ephrem Girma;Tabish, Syed Zafar Shahid;Jha, Kumar Neeraj
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.24-34
    • /
    • 2016
  • Disputes seem to be synonymous with large-scale construction projects in Ethiopia. The purpose of this study is to determine the factors responsible for impacting the performance of Ethiopian public construction projects. To this end, 35 success and failure attributes responsible for impacting the performance of the projects were identified and presented to Ethiopian construction professionals in the form of a structured questionnaire, and responses were collected. The factor analysis conducted on the success and failure attributes influencing no-dispute performance separately resulted in six success factors and five failure factors. Further analysis using stepwise multiple regression indicates that owner competence and interaction among project participants have a positive impact on no-dispute performance. However, conflict among project participants has a negative impact on the no-dispute performance of Ethiopian public construction projects. Although Ethiopia-specific, the results reflect construction management problems common to both developed and developing countries. The findings are expected to help researchers and practitioners gain a better understanding of critical success and failure factors and to help them take proactive measures to avoid disputes in public construction projects.