• Title/Summary/Keyword: cost minimization

Search Result 415, Processing Time 0.024 seconds

A Study of Optimal Fuel-Mix Considering Power Generation Operation (발전기 출력특성을 고려한 최적전원구성 연구)

  • Jung, Young-Beom;Kim, Kil-Sin;Park, Chang-Ho;Yoon, Yong-Beom
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.10
    • /
    • pp.28-37
    • /
    • 2011
  • Though Korea has introduced CBP(Cost Based pool) power trading system since 2001, long-term Generation system planning has been executed by government for Cost minimization every 2 years. Until currently the model which is used for Generation system planning and best-mix only considers cost minimization and total yearly or quarterly electricity demand every year. In a view point of one day power supply operation, technical characteristics, like the ramp up/down rate of total generation system, minimum up/down time and GFRQ(Governor Free Response Quantity), are very important. this paper analyzes Optimal Fuel-Mix for 2022 Korea generation system satisfying these constraints of each fuel type and considering pump storage plants, construction cost and $CO_2$ emission charge Using MILP(Mixed Integer Linear Programming) method. Also the sensitivity analysis which follows in future power industry environmental change accomplished.

Analysis of DDoS Prevention Algorithm in Mobile Ad-hoc Network (MANET 환경에서의 DDoS 공격방지 알고리즘 분석)

  • Kim, Dong-Chul
    • Convergence Security Journal
    • /
    • v.13 no.1
    • /
    • pp.11-17
    • /
    • 2013
  • In this paper, the information security requirements in the mobile ad-hoc network(MANET) are presented, and the algorithm to establish the protection node(gateway) is proposed to prevent the distributed denial of service(DDoS). The information security technology and security threats in the MANET are presented, and protection node is decided to minimize the total cost through the sending nodes and receiving nodes by way of protection node. To set up the protection node, the minimization algorithms of maximum cost and the average cost between the protection node and receiving nodes are compared with the optimal solutions, in which optimal solution is found out by all enumeration method. From the results, the total cost between the sending and receiving nodes is minimized under the average cost minimization algorithm rather than the using of the maximum cost.

A Study on the Burn-in Optimization of Computer Monitor (Computer용 Monitor 완제품의 Burn-in 최적화에 관한 연구)

  • Park, Jong-Man
    • Journal of Korean Society for Quality Management
    • /
    • v.23 no.4
    • /
    • pp.148-156
    • /
    • 1995
  • The past approach to burn-in optimization have been focused mainly in cost minimization problem during entire product life cycle. But in the case of practical application, burn-in optimization under reliability restriction might be preferred to burn-in optimization by cost minimization. Accordingly this paper shows real examples which estimate the practical burn-in period through application of heuristic method and select the best reliability model through comparison of reliability performance measures.

  • PDF

Group Building Based Power Consumption Scheduling for the Electricity Cost Minimization with Peak Load Reduction

  • Oh, Eunsung;Park, Jong-Bae;Son, Sung-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.1843-1850
    • /
    • 2014
  • In this paper, we investigate a group building based power consumption scheduling to minimize the electricity cost. We consider the demand shift to reduce the peak load and suggest the compensation function reflecting the relationship between the change of the building demand and the occupants' comfort. Using that, the electricity cost minimization problem satisfied the convexity is formulated, and the optimal power consumption scheduling algorithm is proposed based on the iterative method. Extensive simulations show that the proposed algorithm achieves the group management gain compared to the individual building operation by increasing the degree of freedom for the operation.

An Operation Method of Pumped Storage Hydroplants in The Cost Based Pool (변동비반영 전시장(CBP)에서의 양수발전기 운영방안)

  • Kim, Kwang-In;Kim, Doo-Jung;Park, Marn-Geun
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.108-111
    • /
    • 2001
  • The electric power industries in Korea are launched into deregulation by introducing the CBP(Cost Based Pool), where generation sector of KEPCO was divided into six generation companies and the other sectors of KEPCO remains vertically integrated system. In deregulated market, participants are concerned with maximization of their profit rather than minimization of system-wide costs. Consequently, there are difficulties in applying the cost minimization for the scheduling of generation resources to CBP, because of the operation of pumped-storage hydroplants. This paper presents an operation method of pumped storage hydroplants which is helpful for the economic operation of power system considering the market in the CBP.

  • PDF

The Section Optimization of Prestressed Concrete Box Girder Bridges (프리스트레스트 콘크리트 박스 거더 교량의 단면최적화)

  • 노금래;김만철;박선규;이인원
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.10b
    • /
    • pp.718-723
    • /
    • 1998
  • The program which could determine cross-sectional dimension of the prestressed concrete box girder bridges at the stage of preliminary design was developed using the optimal technique in this study. It could minimize the cost required in the design of box girder bridges and the construction with the full staging method. Objective cost function consisted of six independent variables such as height of cross-section, jacking force and thickness of web and bottom flange. The SUMT(Sequntial Unconstrained minimization Technique) was used to solve the constrained nonlinear minimization optimal problem. Using the program developed in this study, optimum design was performed for existing bridges with one cell cross section of constant depth. The result verify the compatibility of the program.

  • PDF

Setup Minimization Problem in a Diverging Point of the Conveyor System (컨베이어 시스템 분기점에서의 셋업 최소화 문제)

  • Kim, Hyoungtae;Han, Yong-Hee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.3
    • /
    • pp.95-108
    • /
    • 2013
  • The problem of constrained sequencing of a set of jobs on a conveyor system with the objective of minimizing setup cost is investigated in this paper. A setup cost is associated with extra material, labor, or energy required due to the change of attributes in consecutive jobs at processing stations. A finite set of attributes is considered in this research. Sequencing is constrained by the availability of conveyor junctions. The problem is motivated by the paint purge reduction problem at a major U.S. automotive manufacturer. We first model a diverging junction with a sequence-independent setup cost and predefined attributes as an assignment problem and this model is then extended for a more general situation by relaxing the initial assumptions in various ways.

A Study on the Correlation between Optimal Safety of Structures and Minimization of Life Cycle Cost(LCC) (구조물의 최적안전지수와 생애주기비용의 상관관계에 관한 연구)

  • Bang, Myung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.6
    • /
    • pp.94-98
    • /
    • 2014
  • This study was intend to develop the optimal design method of suspension bridge by the reliability analysis based on minimization of life cycle cost(LCC). The reliability analysis was performed considering aleatory uncertainties included in the result of numerical analysis. The optimal design was estimated based on life-cycle cost analysis depending on the result of reliability analysis. As the effect of epistemic uncertainty, the safety index (beta), failure probability (pf) and minimum life cycle cost were random variables. The high-level distributions were generated, from which the critical percentile values were obtained for a conservative bridge design through sensitivity assessment.

A Study on the Model for Iron and Steel Technology Assessment Considering Cost Minimization and Environmental Effects : An Application of MARKAL Model (비용최소화와 환경영향을 고려한 철강기술 평가에 관한 연구 : MARKAL 모형의 응용)

  • 김종욱;홍종철;이장우;신희성;손재익;최기련
    • Journal of Energy Engineering
    • /
    • v.6 no.2
    • /
    • pp.188-197
    • /
    • 1997
  • MARKAL model was applied for assessment of iron and steel technology for the year of 2032 considering cost and environmental effects based on 1992. Technology, energy and material flows were analyzed in iron and steel sector. Reference iron and steel system was designed according to this analysis. Six scenarios were developed considering cost and environmental limitations such as CO$_2$emission control and SOx reduction cost. Competitiveness of technologies in iron and steel sector was assessed under different environmental limitations with cost minimization. Through this study, it was confirmed that MARKAL model can be applied to technology assessment in the field of iron and steel industry.

  • PDF

Comparison of Relative Weights of Cost for Road-bed Construction and Energy on Life Cycle Cost of Railroad -in Case of Seoul-pusan High Speed Rail (철도노선의 생애주기비용에서 노반건설비와 에너지비용의 상대적 비중 분석 - 경부고속철도 사례를 중심으로)

  • Suh, Sunduck;Kim, Jeong Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.4
    • /
    • pp.1261-1267
    • /
    • 2014
  • It is generally recognize that the weight of energy cost for railroad alignment in the life cycle cost is higher than that for roadway. This study analyzed the relative weights of railroad road-bed construction cost and energy cost in the case of Seoul-Pusan High Speed Rail. Recently, the optimization of railroad alignment with computerized methodology has been studies. The optimization is supposed to aim the minimization of life cycle cost including the energy cost as well as the minimization of the construction cost. The operation period of the Seoul-Pusan High Speed Rail is limited to ten years, then various future operation scenario were developed for the next 20 years. The weight of energy cost is estimated 10~30% of the construction cost by scenario, and it is lower than the figure generally expected. It may be meaningful to provide the method to include the energy cost in the railroad alignment optimization.