• Title/Summary/Keyword: cost functions

Search Result 1,358, Processing Time 0.023 seconds

Distribution System Reconfiguration Considering Customer and DG Reliability Cost

  • Cho, Sung-Min;Shin, Hee-Sang;Park, Jin-Hyun;Kim, Jae-Chul
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.4
    • /
    • pp.486-492
    • /
    • 2012
  • This paper presents a novel objective function for distribution system reconfiguration for reliability enhancement. When islanding operations of distributed generators is prohibited, faults in the feeder interrupt the operation of distributed generators. For this reason, we include the customer interruption cost as well as the distributed generator interruption cost in the objective function in the network reconfiguration algorithm. The network reconfiguration in which genetic algorithms are used is implemented by MATLAB. The effect of the proposed objective function in the network reconfiguration is analyzed and compared with existing objective functions through case studies. The network reconfiguration considering the proposed objective function is suitable for a distribution system that has a high penetration of distributed generators.

Nonfragile Guaranteed Cost Controller Design for Uncertain Large-Scale Systems (섭동을 갖는 대규모 시스템의 비약성 성능보장 제어기 설계)

  • Park, Ju-Hyeon
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.51 no.11
    • /
    • pp.503-509
    • /
    • 2002
  • In this paper, the robust non-fragile guaranteed cost control problem is studied for a class of linear large-scale systems with uncertainties and a given quadratic cost functions. The uncertainty in the system is assumed to be norm-bounded and time-varying. Also, the state-feedback gains for subsystems of the large-scale system are assumed to have norm-bounded controller gain variations. The problem is to design a state feedback control laws such that the closed-loop system is asymptotically stable and the closed-loop cost function value is not more than a specified upper bound for all admissible uncertainties and controller gain variations. Sufficient conditions for the existence of such controllers are derived based on the linear matrix inequality (LMI) approach combined with the Lyapunov method. A parameterized characterization of the robust non-fragile guaranteed cost controllers is given in terms of the feasible solutions to a certain LMI. A numerical example is given to illustrate the proposed method.

Concurrent Optimization of Design and Machining Tolerances with Accumulated Scrap Cost Model(ASCM) (누적 재가공 비용 모델을 이용한 설계 및 가공 공차의 동시 최적화)

  • Choe, Min-Seok;Lee, Du-Yong
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.25 no.3
    • /
    • pp.452-460
    • /
    • 2001
  • Most of researches of tolerance optimization have used a simple sum of tolerance-cost functions with several constraint equations as an optimization model. However, if there is a machining sequence with more than one processes to complete a part, and machining failure, i.e., out-of-tolerance occurs at one of the intermediate processes, the tolerance-cost of this process should be added by the machining cost of all the previous processes already completed on the part. In this study, an accumulated scrap cost model(ASCM) is proposed considering the scrapped machining cost, and applied to a simple assembly example. The result of tolerance optimization using ASCM is compared with that of using a traditional optimization model to confirm its effectiveness.

On Guaranteed Cost Control of Uncertain Neutral Systems (섭동을 갖는 뉴트럴 시스템의 성능보장 안정화에 관하여)

  • Park, Ju-Hyun
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.52 no.3
    • /
    • pp.129-133
    • /
    • 2003
  • In this paper, we consider the robust guaranteed cost control problem for a class of uncertain neutral systems with given quadratic cost functions. The uncertainty is assumed to be norm-bounded and time-varying. The goal in this study is to design the memoryless state feedback controller such that the closed-loop system is asymptotically stable and the closed-loop cost function value is not more than a specified upper bound lot all admissible uncertainty. Some criteria for the existence of such controllers are derived based on the matrix inequality approach combined with the Lyapunov second method. A parameterized characterization of the robust guaranteed cost controllers is given in terms of the feasible solutions to the certain matrix inequalities. A numerical example is given to illustrate the proposed method.

Optimal Seismic Reliability of Bridges Based on Minimum Expected Life Cycle Costs (최소기대비용에 기초한 교량의 최적내진신뢰성)

  • 조효남;임종권;심성택
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.10a
    • /
    • pp.249-256
    • /
    • 1999
  • This study is intended to propose a systematic procedure for the development of the reliability-based seismic safety and cost-effective Performance criteria for design and upgrading of long span PC bridges. In the paper, a set of cost function models for life cycle cost analysis of bridges is proposed. The total life cycle cost functions consist of initial cost and direct/indirect damage costs considering repair/replacement costs, human losses and property damage costs, road user costs, and indirect regional economic losses. The damage costs are successfully expressed in terms of Park-Ang median global damage indices and damage probabilities. The proposed approach is successfully applied to model bridges in both regions of a moderate seismicity area like Seoul, Korea and a high one like Tokyo, Japan. It may be expected that the proposed approach can be effectively utilized for the development of cost-effective performance criteria for design and upgrading of various types of bridges as well as long span PC bridges.

  • PDF

NON-FRAGILE GUARANTEED COST CONTROL OF UNCERTAIN LARGE-SCALE SYSTEMS WITH TIME-VARYING DELAYS

  • Park, Ju-H.
    • Journal of applied mathematics & informatics
    • /
    • v.9 no.1
    • /
    • pp.61-76
    • /
    • 2002
  • The robust non-fragile guaranteed cost control problem is studied in this paper for class of uncertain linear large-scale systems with time-varying delays in subsystem interconnections and given quadratic cost functions. The uncertainty in the system is assumed to be norm-hounded arid time-varying. Also, the state-feedback gains for subsystems of the large-scale system are assumed to have norm-bounded controller gain variations. The problem is to design state feedback control laws such that the closed-loop system is asymptotically stable and the closed-loop cost function value is not more than a specified upper bound far all admissible uncertainties. Sufficient conditions for the existence of such controllers are derived based on the linear matrix inequality (LMI) approach combined with the Lyapunov method. A parameterized characterization of the robust non-fragile guaranteed cost contrellers is 7iven in terms of the feasible solution to a certain LMI. Finally, in order to show the application of the proposed method, a numerical example is included.

Setup Cost Reduction in a Multi-Product Dynamic Lot-Sizing Model (다종제품의 동적 로트크기결정 모형에서의 생산준비비용 절감효과에 관한 연구)

  • Lee, Woon-Seek;Joo, Chul-Min
    • IE interfaces
    • /
    • v.13 no.2
    • /
    • pp.217-224
    • /
    • 2000
  • This paper analyzes the effects of setup cost reduction in a dynamic lot-sizing model for a single-facility multi-product problem. In the model, demands for each product are known, no backlogging is allowed, and a single resource is employed. Also, setup cost is defined as a function of capital expenditure to invest in setup cost reduction. Furthermore, in each production period the facility (or plant) produces many products, each representing a fixed part of the involved production activity (or input resource quantity). In this paper, the structure of the optimal solution is characterized and an efficient algorithm is proposed for simultaneously determining the optimal lot size with reduced setup cost and the optimal investment in setup cost reduction. Also, the proposed algorithm is illustrated by a numerical example with a linear and an exponential setup reduction functions.

  • PDF

Cost comparison of pretreatment processes in large SWRO desalination plant (대규모 해수담수화 플랜트에서의 전처리공정 비용 분석)

  • Kim, Youngmin;Kim, Jin-Ho;Lee, Sangho;Lee, Chang-Kyu;Park, Kwang Duk;Choi, June-Seok
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.5
    • /
    • pp.555-560
    • /
    • 2013
  • A cost analysis method for pretreament processes of a large scale seawater desalination plant was considered using a cost estimation model, WaTER (Water Treatment Estimation Routine). This model is based on cost functions of U.S. EPA to conduct economic analysis of water treatment facilities. A virtual seawater desalination plant which has pretreatment production capacity of $100,000m^3$ per day was chosen as a model plant. Dual media filtration and microfiltration systems were compared as pretreatment process, and the following reverse osmosis process was modeled. As a result, microfiltration showed a price competitiveness in condition of operating with reverse osmosis process by reducing the loads of water treatment and membrane cleaning despite it's high annual cost.

An Ant Colony Optimization Heuristic to solve the VRP with Time Window (차량 경로 스케줄링 문제 해결을 위한 개미 군집 최적화 휴리스틱)

  • Hong, Myung-Duk;Yu, Young-Hoon;Jo, Geun-Sik
    • The KIPS Transactions:PartB
    • /
    • v.17B no.5
    • /
    • pp.389-398
    • /
    • 2010
  • The Vehicle Routing and Scheduling Problem with Time Windows(VRSPTW) is to establish a delivery route of minimum cost satisfying the time constraints and capacity demands of many customers. The VRSPTW takes a long time to generate a solution because this is a NP-hard problem. To generate the nearest optimal solution within a reasonable time, we propose the heuristic by using an ACO(Ant Colony Optimization) with multi-cost functions. The multi-cost functions can generate a feasible initial-route by applying various weight values, such as distance, demand, angle and time window, to the cost factors when each ant evaluates the cost to move to the next customer node. Our experimental results show that our heuristic can generate the nearest optimal solution more efficiently than Solomon I1 heuristic or Hybrid heuristic applied by the opportunity time.

Estimate the Period and Cost of Projects by Estimating the Conflict Index - Concentrated on the Apartment Reconstruction Project - (갈등지수 산정에 의한 사업기간 및 비용 예측 - 공동주택 재건축사업을 중심으로 -)

  • Lee, Ro-Na;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.87-94
    • /
    • 2012
  • The apartment reconstruction projects have the proper functions such as residential environment improvement and the new housing allocation system; however, intention of the projects are distorted by the combination of factors, like failure of relocation of the original occupants and income redistribution, speculation in real estate, sharp rise in housing price, disputation between various interested parties, inadequate system and etc and it makes the projects unable to go well. Disputations and litigations are due to spread of the small conflict. As a result of the problems, it could not going smoothly and that lead to increase or stop the period and cost. This study is to estimate the period and cost using the conflict index so as to prevent and solve the problem which is among the conflict in the reverse functions. The conflict index has estimated focus on the conflict impact and the period and cost has been estimated using an variable independent including the conflict index. Also, estimated the conflict index and estimate of the period and cost are able to succeed with a minimum of disputation and money.