• Title/Summary/Keyword: cooperation projects

Search Result 593, Processing Time 0.035 seconds

Analysis of Linkage between Official Development Assistance (ODA) of Forestry Sector and Sustainable Development Goals (SDGs) in South Korea (국내 임업분야 공적개발원조(ODA)사업과 지속가능발전목표(SDGs)와의 연관성 분석)

  • Kim, Nahui;Moon, Jooyeon;Song, Cholho;Heo, Seongbong;Son, Yowhan;Lee, Woo-Kyun
    • Journal of Korean Society of Forest Science
    • /
    • v.107 no.1
    • /
    • pp.96-107
    • /
    • 2018
  • This study analyzed the linkage between the Forestry sector Official Development Assistance (ODA) Project in South Korea and the Sustainable Development Goals (SDGs) of United Nations (UN), Suggested direction of ODA project focusing on the implementation of the SDGs. Forestry sector ODA project data in South Korea have collected from Economic Development Cooperation Fund (EDCF) statistical inquiry system developed by The Export-Import Bank of Korea. According to the analysis result, Forestry sector ODA project in South Korea have been actively implemented in the fields of forestry development, forestry policy and administration. In both fields, Korea Forest Service and Korea International Cooperation Agency (KOICA) carried out the most projects. The Forestry sector ODA project data in South Korea are classified technical development, capacity building, construction of infrastructure and afforestation based on their objectives and contents. SDGs emphasizes the importance of national implementation assessment and this study analyze linkage between ODA activity content in each classification item and 2016 Korea Forest Service Performance Management Plan indicator. Analyzed the 2016 Korea Forest Service Performance Management Plan indicator and SDGs target and SDGs indicator were identified. finally, SDGs goals were recognized. In conclusion, Forestry sector ODA project in South Korea are associated with the SDGs Goal 1 (No Poverty), Goal 2 (Zero Hunger), Goal 6 (Clean Water and Sanitation), Goal 13 (Climate Action), Goal 15 (Life on Land) and Goal 17 (Partnership for The Goals). Therefore, With the launch of the SDGs, This study analyzed the linkage among the Forestry sector ODA Project in South Korea, the 2016 Korea Forest Service Performance Management Plan and the SDGs. it presented the limitations of Forestry sector ODA Project in South Korea and made proposals for the implementation of the SDGs.

A Loan System of funding Research Projects for Starting Up Venture Business(A Research fund Management System Incorporating Business Concept) (벤처기업 육성을 위한 대여 연구비 관리제도(Business형 연구관리제도))

  • 강박광;황희융
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.1 no.1
    • /
    • pp.73-82
    • /
    • 2000
  • Conventional funding system for the university research projects is limited to a grant or subsidy type funding method which does not require an obligation of refund. Such a funding system is known as ideal one for the university research activities which in general is not a profit oriented activities. It is considered ideal in a sense that nonprofit oriented research activities gives more emphasis on creativity than on efficiency or practical value. A venture- business-start-up research activity can not be considered as a pure nonprofit oriented activities. It clearly gives more emphasis on efficiency and practical value than on creativity Recently a large portion of the venture-business-start-up research activities are carried out in the universities. When a conventional research funding system is applied to such a new type of research activities, it turned out that the success rate is much lower than expectancy. This is why a new and differentiated funding system is sought for such a new type of research activities. A funding system of loan type for a venture-business-start-up research activities is proposed herewith. A loan system naturally requires a pay back after the successful start up of the venture business. This loan system nay be considered that a business concept is grafted on a conventional funding system for the university research activities. This means that a rather loose or generous terms and conditions of the money loan case is introduced into this funding system to remedy the short comings of the intrinsic nonprofit nature of the university research activities. The point is how to improve the success rate and how to reduce the undesirable aspect of the conventional university research activities when it is practiced with the new type of research activities. After one and half year of practicing with the new funding system. it can not be asserted that a definitely positive results could be obtained. but a trend of desirable aspects could be observed such as low drop out rate. project selection efficiency, higher sense of responsibility. etc.

  • PDF

A Study on the Current Status of Ecological Restoration Plant Species Use - Focusing on the Ecosystem Conservation Cooperation Fund Return Projects - (생태복원 식물종 사용 실태에 관한 연구 - 생태계보전협력금 반환사업을 중심으로 -)

  • Cho, Dong-gil
    • Korean Journal of Environment and Ecology
    • /
    • v.35 no.5
    • /
    • pp.525-547
    • /
    • 2021
  • The main purpose of this study is to examine the use of plant species in ecological restoration projects. To this end, planting drawings from 58 sites that had completed the return of the ecosystem conservation cooperation fund for the past six years were collected and analyzed. The analysis used the construction completion and design drawings to determine the overall selection status and analyze frequency by classifying planted plants into wild and cultivated plants by nature, size, vegetation climate, and upland and wetland habitat. The investigation and analysis process found many cases of wrong plant names, so an analysis was also performed on the matter. In the 58 investigation sites, 282 plants were used for planting: 91 tree species, 69 shrub species, 11 vine species, and 111 herbal species. The most commonly used plant species was Spiraea prunifolia f. simpliciflora, followed by Sorbus alnifolia, Quercus acutissima, Zoysia japonica, Callicarpa dichotoma, and Weigela subsessilisin that order. The most commonly used tree species was Sorbus alnifolia,followed by Quercus acutissima, Zelkova serrata, Chionanthus retusus, and Cornus officinalis, in that order. The most commonly used shrub species was Spiraea prunifolia f. simpliciflora, followed by Weigela subsessilis, Callicarpa dichotoma, Rhododendron yedoense f. poukhanense. and Euonymus alatusin that order. The most commonly used herbal plant species was Zoysia japonica, followed by Dendranthema zawadskii var. latilobum, Aster koraiensis, Miscanthus sacchariflorus, and Pennisetum alopecuroidesin that order. In the analysis by vegetation climate, Spiraea prunifolia f. simpliciflora, Callicarpa dichotoma, and Sorbus alnifoliawere most used in that order in both the temperate central and the warm temperate forest zones, but the pattern does not properly reflect the climate characteristics. In the analysis by habitat, Miscanthus sacchariflorus and Lythrum salicariawere most used in the wetland. In particular, the ratio of wild plants to cultivated plants was 76% to 24%, indicating the ratio of selecting cultivated plants was high. The names of plants on the drawings were mostly common names that did not appear in the Korea National Arboretum or the National Species List of Korea. It is necessary to use proper plant names in the future. Regarding the use of planting plants for ecological restoration, it is necessary to adopt the approach of diversifying selected plants, selecting plants according to characteristics of climate zones, and lowering the specifications of plants used for ecological restoration. Moreover, it is important to fully understand the ecological characteristics of wetland plants and minimize the ratio of using cultivated plants to ensure the plant selection centered on wild plants.

Outer Space Activities and an Observation of Related Laws of Korea (국내 우주활동과 관련법 소고)

  • Park, Won-Hwa
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.24 no.2
    • /
    • pp.163-186
    • /
    • 2009
  • The missile technology and its development in south Korea have been restrained to the limit of 180 km by America which instead provided to Korea with security protection. In the same vein, America pressured South Korea to abort its nuclear weapons program so as to prevent another possible military encounter that can easily develop into a war between South and North Korea. This restraint was a bit relaxed when South Korea joined the Missile Technology Control Regime (MTCR) in 2001 whereby the limit was 300 km. The situation of South Korea is in much contrast with its neighbor, North Korea, which has fired Taepo Dong 1 and Taepo Dong 2 to put its alleged satellite respectively into the Earth orbit. The range of this rocket believed to be reaching more than 5,500 km, a range of the intercontinental ballistic missile, without any rein. South Korea that has just geared its full powers for its outer space industry, with the current space projects of putting its satellites into the low Earth orbit, will in future put its satellite into the geostationary orbit, 36,000 km above the Earth. To do so, such restraint had better be resolved. Korean space industry, as it is alike in other countries, started with putting and manufacturing sounding rockets, producing satellites but relying on foreign launching facilities, and learning launching capacities. Experiencing three time launchings of KITSAT, the current satellite projects of Korea are undertaken as follows: - Koreasat - STSAT - Komsat - MBSAT - COMS (Communication, Ocean, and Meteorological Satellite) Koreans waked up to the things of outer space in 2008 with the first Korean astronaut Li So-yeon, a lady bio systems engineer. Although the first Korean made rocket in cooperation with a Russian company to fire last August 2009 was a failure, it should be considered as an inevitable process for future endeavors. There are currently three outer space related laws of Korea: Aerospace Industry Development Promotion Act 1987, Outer Space Development Promotions Act 2005, and Space Damage Compensation Act 2008. The first two stemming from the two different ministries are, however, overlapping in many aspects and have some shortcomings to be improved.

  • PDF

The Yellow Sea Ecoregion Conservation Project : the Present Situation and its Implications (황해생태지역 보전사업 추진현황 및 시사점)

  • Kim, Gwang Tae;Choi, Young Rae;Jang, Ji Young;Kim, Woong-Seo
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.15 no.4
    • /
    • pp.337-348
    • /
    • 2012
  • The Yellow Sea Ecoregion Conservation Project is a joint international project which is carried out under the purposes of conserving the habitats in the Yellow Sea Ecoregion and biodiversity from various threats that damage ecosystems, informing the importance and value of the Yellow Sea Ecoregion, and promoting the understanding and interests of Korea, China and Japan. Subsequent to the Yellow Sea Ecoregion Planning Programme which had been performed during the period from 2002 to 2006, the Yellow Sea Ecoregion Support Project has been performed over 7 years in total from 2007 to 2014. Panasonic is sponsoring the financing of the project, and the organizations in charge of the project by country are Korea Institute of Ocean Science & Technology for Korea and World Wide Fund for Nature branches for China and Japan. While the Yellow Sea Ecoregion Planning Programme was focused on the biological assessment and the selection of potential priority area by scientific review, the Yellow Sea Ecoregion Support Project is oriented toward practical activities targeting more diversified stakeholder. Especially, this project plans to support direct conservation activities in the region and participation and cooperation from local residents. The project plan is comprised of 3 phases. During the first period from 2008 to 2009, small grant projects were operated targeting 16 institutions of Korea and China, and for the second period from 2010 to 2012, one place each was selected as demonstration site for habitat conservation in Korea and China respectively and supported for three years to introduce the conservation method based on international standards such as the management of marine protected areas, ecosystem-based management and community-based management and simultaneously to develop habitat conservation activities suitable for national and regional characteristics. During the period from 2013 to 2014 which is the last phase, the project plans to distribute the performance of small grant projects and demonstration site activities through a series of forums among stakeholder. Through the activities described above, the recognition of general public on the conservation of the Yellow Sea Ecoregion was changed positively, and community-based management began to be reflected in the policies for the marine protected areas of central and local government.

A Case Study of the Performance and Success Factors of ISMP(Information Systems Master Plan) (정보시스템 마스터플랜(ISMP) 수행 성과와 성공요인에 관한 사례연구)

  • Park, So-Hyun;Lee, Kuk-Hie;Gu, Bon-Jae;Kim, Min-Seog
    • Information Systems Review
    • /
    • v.14 no.1
    • /
    • pp.85-103
    • /
    • 2012
  • ISMP is a method of writing clearly the user requirements in the RFP(Request for Proposal) of the IS development projects. Unlike the conventional methods of RFP preparation that describe the user requirements of target systems in a rather superficial manner, ISMP systematically identifies the businesses needs and the status of information technology, analyzes in detail the user requirements, and defines in detail the specific functions of the target systems. By increasing the clarity of RFP, the scale and complexity of related businesses can be calculated accurately, many responding companies can prepare proposals clearly, and the level of fairness during the evaluation of many proposals can be improved, as well. Above all though, the problems that are posed as chronic challenges in this field, i.e., the misunderstanding and conflicts between the users and developers, excessive burden on developers, etc. can be resolved. This study is a case study that analyzes the execution process, execution accomplishment, problems, and the success factors of two pilot projects that introduced ISMP for the first time. ISMP performance procedures of actual site were verified, and how the user needs in the request for quote are described was examined. The satisfaction levels of ISMP RFP for quote were found to be high as compared to the conventional RFP. Although occurred were some problems such as RFP preparation difficulties, increased workload, etc. due to the lack of understanding and execution experience of ISMP, in overall, also occurred were some positive effects such as the establishment of the scope of target systems, improved information sharing and cooperation between the users and the developers, seamless communication between issuing customer corporations and IT service companies, reduction of changes in user requirements, etc. As a result of conducting action research type in-depth interviews on the persons in charge of actual work, factors were derived as ISMP success factors: prior consensus on the need for ISMP, the acquisition of execution resources resulting from the support of CEO and CIO, and the selection of specification level of the user requirements. The results of this study will provide useful site information to the corporations that are considering adopting ISMP and IT service firms, and present meaningful suggestions on the future study directions to researchers in the field of IT service competitive advantages.

  • PDF

The Effect of Government's Fairness as the Entrepreneur's Satisfactions & Managerial Performance: Focusing on the Differences between Start-up Companies' Growth Stage (정부의 창업지원 공정성이 만족도 및 경영성과에 미치는 영향: 창업기업의 성장단계별 차이를 중심으로)

  • Jang, Younghye;Lee, Jeonghye;Kim, Pansoo
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.15 no.4
    • /
    • pp.109-120
    • /
    • 2020
  • This study examines how the government's fairness in entrepreneurship support affects satisfaction and management performance, and examines whether these influences are different for each growth stage of start-up companies. For this study, data were collected for start-up companies that received government support for start-up within the past 5 years. Total 611 copies of the data were used in this study. The collected data were analyzed using SPSS and AMOS. The fairness used in this study was divided into three types, procedural fairness, interactive fairness, and distributed fairness. The effect of the three fairness on the satisfaction of start-up support project was analyzed. In addition, the effect of business support satisfaction on business performance was analyzed, where the business performance was evaluated by the questioner's satisfaction with their business. The start-up phase was divided into the start phase, early growth phase, stagnant phase, and high-level growth phase, and the moderating effect between the fairness and satisfaction of the government-supported projects by start-up phase was analyzed. As a result, it was found that every concept of fairness had a positive (+) effect on the satisfaction of the entrepreneurship support project, and the satisfaction of the entrepreneurship support project had a positive (+) effect on the management performance. The concept of procedural fairness in the start phase, procedural fairness in the early growth phase, interactive fairness, and the concept of all fairness in the stagnant phase influenced the satisfaction of the start-up support project. In this study, the fairness and effect of government-supported projects affecting the management performance of start-ups were identified by growth phase of start-ups. The results of these studies will help build a systematic system for entrepreneurship support and for start-ups, it will also greatly contribute to finding differentiated growth plans by growth stages of start-up companies.

A Preliminary Study on Domestic Embracement and Development Plan Regarding UNESCO World Heritage Programme (유네스코 세계유산 제도의 우리나라 문화재 정책에의 수용과 발전방안에 대한 시론적 연구)

  • Kang, Kyung Hwan;Kim, Chung Dong
    • Korean Journal of Heritage: History & Science
    • /
    • v.43 no.1
    • /
    • pp.56-85
    • /
    • 2010
  • UNESCO World Heritage Programme was introduced following the adoption of Convention Concerning the Protection of the World Cultural and Natural Heritage by the General Conference of UNESCO in 1972 in order to protect cultural and natural heritage with superb value for all mankind. Despite its short history of less than 40 years, it has been evaluated as one of the most successful of the cultural area projects of UNESCO with 890 world heritage registered worldwide. For systematic protection management of World Heritage, UNESCO, through systemization of registration, emphasis on the importance of preservation management plan, institutionalization of monitoring, and operation of World Heritage Fund, has utilized World Heritage Programme not just as a means of listing excellent cultural properties, but as a preservation planning tool, and accordingly, such policies have had a significant influence on the cultural heritage protection legislations of numerous nations. Korea has ratified World Heritage Convention in 1988, and with the registration of the Royal Tombs of the Joseon Dynasty in 2009, it has 9 World Heritage Sites. Twenty years have passed since Korea joined the World Heritage Programme. While World Heritage registration contributed to publicity of the uniqueness and excellence of Korean cultural properties and improvement of Korea's national culture status, it is now time to devise various legislative/systematic improvement means to reconsider the World Heritage registration strategy and establish a systematic preservation management system. While up until now, the Cultural Properties Protection Law has been amended to arrange for basic rules regarding registration and protection of World Heritage Sites, and some local governments have founded bodies exclusive for World Heritage Site management, a more fundamental and macroscopic plan for World Heritage policy improvement must be sought. Projects and programs in each area for reinforcement of World Heritage policy capacity such as: 1) Enactment of a special law for World Heritage Site preservation management; 2) enactment of ordinances for protection of World Heritage Sites per each local government; 3) reinforcement of policies and management functionality of Cultural Heritage Administration and local governments; 4) dramatic increase in the finances of World Heritage Site protection; 5) requirement to establish plan for World Heritage Site preservation protection; 6) increased support for utilization of World Heritage Sites; 7) substantiation and diversification of World Heritage registration; 8) sharing of information and experiences of World Heritage Sites management among local governments; 9) installation of World Heritage Sites integral archive; 10) revitalization of citizen cooperation and resident participation; 11) training specialized resources for World Heritage Sites protection; 12) revitalization of sustainable World Heritage Sites tourism, must be selected and promoted systematically. Regarding how World Heritage Programme should be domestically accepted and developed, the methods for systemization, scientific approach, and specialization of World Heritage policies were suggested per type. In the future, in-depth and specialized researches and studies should follow.

Environmental Auditing-Analysis of Enterprises (환경감사 - 기업분석)

  • Wotte, Joris
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.3
    • /
    • pp.9-13
    • /
    • 1995
  • In July 1993 a new prescription of the EC was finished, concerning the voluntary participation of enterprises in a common auditing system. By this in the EC-member countries there must be founded centers of environmental auditing where experienced experts of environmental auditing should be accredited. These accredited experts are controllers for evaluating and certification of carried out environmental-auditings. An environmental-auditing practically represents an environmental assessment for an already existing enterprise with establishing corresponding programmes and strategies for the internal management to improve the environmental relations. Much experiences, which could be collected in the field of EIA during the last years may be transfered to this new task immediately. Only an essential difference there should not be overseen because of national legislation EIA in the defined cases must be carried out. By the EC-prescription carrying out an environmental-auditing for an enterprise is optional, it is recommended only. It was not introduced as a must. In spite of this fact because of the hard competition on the market there will be developed a pressure for the enterprises, to carry out such environmental-auditings. At present already a number of first projects in this direction can be seen, in the first line above all enterprises with the necessary economic power want to use this possibility, to gain better positions on the market. We have already gathered the first experiences in this field. We arranged corresponding contacts to several enterprises within the surroundings of Dresden. Within an opening discussion, where the project is explained and discussed with the management of the enterprise very detailed, the understanding, the readiness and the cooperation for the project are generated necessary prerequesits for the success of the whole work. By means of careful detail-work in collaboration with all departments and on all levels of the enterprise the total mass and energy-balances of the factory established and analysed. There are included also such ranges like material delivery, personal policy, public relations and sale as well as waste management. It is important that all people working in the factory have the feeling to be our partners, and not to have the impression to be checked or controled by an outside organization. This one of the most important factors of environmental auditing, in order to wake up and to develop a common interest on all sides. At the end of the environmental auditing there will be according to the prescription of the EC a catalogue of measures to do immediately, short time, mean time and long time for improvement of the environmental situation of the enterprise. All proposals are made in connection with a corresponding economic evaluation. These measures and programmes are declared as the environmental manual and are the basis for the work of the environmental management of the enterprise for the next three years. According to the EC-prescription, the enterprise with this environmental manual can get a corresponding certificate, which may be used for public relation purposes.

  • PDF

Unified Systems on Surveying and Geoinformation Management in Korea - New Conceptual Design of Korean NSDI Model - (우리나라 측량·공간정보관리에 관한 통합시스템 연구 - 새로운 국가공간정보기반(NSDI) 모델의 도입 -)

  • Lee, Young-Jin
    • Journal of Cadastre & Land InformatiX
    • /
    • v.44 no.1
    • /
    • pp.179-194
    • /
    • 2014
  • In this study, it aims to research for unified system of "the surveying and geospatial information management" and new National geoSpatial Information Infrastructure(NSDI) as new paradigm against the strategy of "global geospatial information management". The country's existing NGIS projects and the policies of spatial information were examined in this paper, then it was defined newly by modification of NSDI's data coverage with bottom-up method. The new NSDI strategy is based on large scale digital map which was influenced by the local and global trend such as open data, e-Government, Earth observation, etc. (refer to Fig. 1). It was also suggested with new concept of NSDI model that the public-private sharing data can be added to digital map on equal term with spatial core data. (refer to Fig. 2) It is proposed the institutional model of MOLIT(Ministry of Land, Infrastructure and Transport) as new concept of NSDI which was applied(refer to Fig. 4). The new model is improving localization and reinforcing cooperation system with not only the other departments within the MOLIT but also the other ministries(forestry, environment, agriculture, heritage, etc.) from independent operation system as a part informatization of land, infrastructure and transport. At the new SDI institutional model of the MOLIT, the spatial information is reorganized as common data infrastructure for all applications, Goverment 3.0 can be feasible according to common data related to government agencies and local government's data vertically or horizontally. And then, it can be practical strategy model to integrate and link all the map and the register which are managed by the laws and institutions if this unified system as a common data can include all spatial core data(digital map), such as base map data of NGA(national gespatial agency), land data and facility data of local government.