• 제목/요약/키워드: contractor

검색결과 537건 처리시간 0.026초

BASIC RESEARCH OF SUB-PACKAGE PROBLEM IN KOREAN CONSTRUCTION INDUSTRY

  • Jinho Shin;Furusaka Shuzo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.635-641
    • /
    • 2009
  • In the building construction, the specialist contractors play the important roles in the point of the quality securing. Therefore, it is very important for the construction industry to study the sub-package problem. The sub-package problem includes two problems which should be solved. One is to decide the scope of works of each specialist contractor, and another one is to decide the particular specialist contractor which carries out the work. However, the sub-package problem in Korea is not clarified yet, although the circumstance around it has changed rapidly. Many factors influence to the sub-package problem regardless of internal factors or external factors of the project. The general contractor usually decides the sub-package under considering the project conditions. In case of the internal factors, each general contractor manages the organization and materials. But the external factors are relatively more difficult to control and predict than internal ones. But out of the external factors, the legal system has very close relationship with a sub-package problem especially in Korean construction system. So, this paper clarifies relationship between the legal system relating subcontracting and the state of sub-package.

  • PDF

건설재해 저감을 위한 발주자 중심의 안전관리체계 구축에 관한 연구 (Research on the Establishment of Contractor Centered Safety Management System to Reduce Construction Disaster)

  • Kia, Seongho;Park, Namkwun
    • 한국재난정보학회 논문집
    • /
    • 제10권4호
    • /
    • pp.503-510
    • /
    • 2014
  • 최근 노량진 수몰사고, 방화대교 붕괴사고 등의 대규모 건설재해가 끊이지 않고 발생하고 있다. 이에 건설공사 현장에서 재해 저감을 위한 다양한 공사참여자의 역할 및 책임이 중요한 요소로 인식되고 있는 실정이다. 건설 산업은 계획, 설계, 시공, 유지관리 단계를 거치면서 발주자를 비롯한 설계자, 시공자 등 다수의 행위주체들이 참여하여 공사목적물을 만들어 가는 일련의 과정이다. 그러나 현행 안전관리의 주체는 근로자를 직접 고용하는 원도급자인 시공사에게만 책임이 집중되고 최상위에서 의사결정 권한을 행사하는 발주자의 안전활동 참여는 배제되고 있다. 이에 본 연구는 각 공사참여자를 대상으로 안전활동에 대한 인식수준 및 실태에 대하여 파악하고, 이를 통해 발주자 중심의 안전관리체계에 대한 개선방안을 제시하였다.

전문건설 시장의 개방성과 경쟁성에 관한 실증적 분석 (An Empirical Study on the Openness and Competition of Special Contractors Market in Korea)

  • 이종광;홍성호;김용수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.431-434
    • /
    • 2006
  • 일반건설업과 전문건설업의 겸업제한을 폐지하여 폐쇄적 시장구조를 개선하자는 주장이 제기되고 있다. 일반건설업과 전문건설업의 겸업 허용은 경제적 측면에서 불 때 양자의 시장을 통합하는 결과를 초래하여 한국의 시공시장에 일대 변화를 초래할 가능성이 높다. 그러나 건설시공 시장의 구조에 대한 실증적 분석에 기초한 논의는 부족한 실정이다. 이에 본 연구는 건설산업 정책과 관련한 합리적 논의의 기초를 제공하기 위하여 전문건설업 시장의 구조를 개방성과 경쟁성의 관점에서 실증적으로 분석하는 것을 목적으로 하며, 문헌연구 및 시장구조에 대한 자료를 이용한 시계열분석을 이용하여 수행되었다. 본 연구의 결과를 요약하면 다음과 같다. 전문건설 시장의 진입규제는 지속적으로 완화되어 일반건설업과 비교하여 상대적으로 개방성은 높은 것으로 평가된다. 전문건설 시장의 진입규제 완화에 따른 업체수 증가로 인해 전문건설업 시장의 성장률 대비 업체당 계약실적 증가율은 상대적으로 낮으며, 또한 하도급계약 낙찰율이 하락하고 있어 경쟁성은 높은 것으로 평가된다.

  • PDF

Investigation of Key Factors to measure on-site Performance of a Construction firm

  • Lee, Young-Dai;Kim, Jung-Ki;Acharya, Nirmal Kumar
    • 한국건설관리학회논문집
    • /
    • 제8권6호
    • /
    • pp.246-262
    • /
    • 2007
  • The performance of projects has always been an area of interest in the construction industry. Roles of all construction supply chain partners are necessary; however the role of a contractor firm in the construction project is pivotal. So, this research intended to explore a Construction Firm's performance criteria which could measure the level of performance of that firm in an ongoing project. Data was collected from construction professionals working in three principal project participant organizations, namely Owner, Consultant and Contractor. A total of 113 nos. of performance measuring items were sorted from literature review and used to collect data. Statistical tools processed by SPSS program was employed to analyze the data. Out of total 113 items, only 65 nos. of variables were found to be acceptable to every population group of this study. Factor analysis revealed 12 key performance predicting factors (KPPF) with 53 predictive indicators. 12 KPPFS with index weight are: work progress and smoothening (9.3%), change order management and work accuracy (9.1%), business relationship building (8.1%), adequacy of construction work procedure (8.6%), quality performance (8.0%), health and site safety adequacy (8.8%), Innovative contractor (8.0%), adequacy of construction site information (6.8%), compliance with contract plan/specification requirements (8.9%), creditworthiness and financial capability (8.3%), intra-agency relationship and responsiveness (7.0%) and resource management (9.2%). These results could be useful to project management body to evaluate performance of its contractor firm on site as well as the contractor itself to assess own performance and its subcontractors on-site.

국방품질경영시스템 요구사항에 대한 중요도-난이도 분석 (Importance-Difficulty Analysis for DQMS Requirements)

  • 김윤희;박종훈;이상천
    • 산업경영시스템학회지
    • /
    • 제40권3호
    • /
    • pp.49-58
    • /
    • 2017
  • The DQMS (Defence Quality Management System) is a certification system that manages participating companies to improve the quality of munitions. Since Korean Defense Specification (KDS) for DQMS certification that was established by adding military requirements based on the ISO quality standard, many companies complain that they should pay too much effort into the preparation process. However, it is hard to find helpful information on the preparation process because we have been only interested in the effect of DQMS acquisition. The purpose of this paper is to provide helpful information to companies preparing for DQMS certification. We surveyed the degree of difficulty and importance of the DQMS requirements from the companies with certification experience, and performed IDA (Importance-Difficulty analysis) by dividing the companies into the main contractor and the subcontractor. The result of IDA shows that there is a different recognition to the DQMS certification between main-contracting and sub-contracting companies. Subcontractor has more difficulties than main contractor in preparing the DQMS certification. In addition, we are able to identify the difficult and important requirements in the preparation process to the DQMS certification. Both main contractor and subcontractor have difficulty to the requirements related to configuration or validation such as 'customer controls configuration', 'configuration review shall be implemented' and 'design and development validation documentation.' The requirements related to customers are important to main contractor but the subcontractor regards difficult requirements as important ones. The result of this paper would be helpful to both the company preparing for DQMS and the munitions quality assurance agency.

Critical Factors of Subcontractor Evaluation and Selection: A Case Study in Vietnam

  • VO, Khoa Dang;PHAM, Cuong Phu;PHAN, Phuong Thanh;VU, Ngoc Bich;DUONG, My Tien Ha;LE, Loan Phuc;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제8권3호
    • /
    • pp.297-305
    • /
    • 2021
  • A contractor or a main contractor is a company with full capacity to construct all project's works for the owner. A subcontractor is an organization that works with the main contractor to execute and complete work packages for the project. Selecting an effective subcontractor will help the efficiency and success of any projects in the construction industry. Therefore, this study identified subcontractor evaluation factors in Vietnam by collecting questionnaire survey data from engineers and staffs in the construction industry project environment. An exploratory factor analysis (EFA) was then performed to identify the critical factors when evaluating and selecting the subcontractor in construction projects. Moreover, when considering the impact level in terms of the average value, the research results showed that the most critical concern was the subcontractor's reputation. Furthermore, the top five factors affecting the sub-contractor evaluation and selection are (i) reputation, (ii) price, (iii) construction techniques, (iv) ability to implement projects according to commitments, and (v) subcontractor competence (the team of workers, technician staff, engineers with full capacity according to regulations). These research results provide an overall perspective that will help main contractors develop suitable subcontractors' evaluation and selection factors in their projects in the construction industry.

국내 건설공사 현장의 하도급관리 개선방안 - 하도급자의 품질업무 전문화를 통하여 (A Improvement of Sub-contractor Management in Domestic Building Construction Sites - Through Specialized Quality Work of Sub-contractors)

  • 손현덕;이재섭
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.292-295
    • /
    • 2002
  • 하도급관리는 하도급업체를 전문화, 계열화하여 성공적인 건설프로젝트를 수행하는데 있다. 품질관리에서 하도급관리는 하도급업체의 ISO9000시리즈의 품질시스템의 도입에서 그치는 것이 아니라 활성화가 이루어질 수 있도록 하여 효율화를 기하고 체질 개선을 하는 것이 필요하다. 따라서 본 연구에서는 하도급자가 ISO9000시리즈의 풀질시스템을 유지하는데 저해 요인을 TQM(Total Quality Management)의 개념을 응용한 설문조사로 분석하여, 개선을 위하여 하도급관리자인 원사업자의 역할을 모색해 보았다.

  • PDF

수직적으로 통합된 공급사슬을 위한 최적 재고 정책의 민감도 분석 (A Sensitivity Analysis of the Optimal Inventory Control for a Vertically Integrated Supply Chain)

  • 김은갑
    • 대한산업공학회지
    • /
    • 제30권3호
    • /
    • pp.197-204
    • /
    • 2004
  • This paper deals with a supply chain with a company and its contractor that produces products by the OEM contract with the company. The supply chain of interest has two distinct features. First, the company is the supplier of raw material required in the production at the contractor. Second, the company and its contractor make a delivery shipment arrangement that the replenishment lead time is determined depending on demand process. We show that the optimal inventory policy is monotonically changed as either the replenishment setup cost or inventory holding cost becomes increased or decreased. We also present asymptotic properties of the optimal inventory policy when either the number of outstanding customer orders or the inventory level becomes very large.

MEASURING ATTITUDE OF A CONTRACTOR COMPANY

  • 니르멀;이영대;김수용
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.451-456
    • /
    • 2004
  • Attitude is very difficult to be measured directly; therefore it must be inferred frrom assumed relationship with observable indicators. In some aspects, behavior represents the attitude of a person about a thing, person or issue. In this paper a tool has been devised to measure the attitude of contractor in ongoing project. However, the tool has been tested in a completed technical school construction project in Nepal. The results show that the tool can reasonably measure the attitude of the contractors and can be helpful for the owners to control the projects.

  • PDF

다차원 유인부 계약의 운영구조 -성과유인의 구조화를 중심으로- (The Operating Structure of Multiple Incentive Contracts : Emphasis on Structuring with the Performance Incentives)

  • 김정본
    • 한국국방경영분석학회지
    • /
    • 제6권1호
    • /
    • pp.79-92
    • /
    • 1980
  • In cost-only incentive contract the emphasis is the attainment of efficient and effective cost control. In contrast multiple incentives contract correlates contractor's profit motives with the generalized government objective function, the decision variables of which are performance or quality (technical progress), time or schedule (timely development and delivery) and the cost (efficient and effective cost control) Under multiple incentive structure, it is essential to formulate the trade-off curves between cost and performance, which are called iso-fee curves. Trade-off curves depict the combination of cost and performance achievement for which the contractor will be rewarded with the same fee. The basic function of trade-off curves is to show he the contractor will be motivated by incentive arragement to trade off or sacrifice the achievement in one incentive element for the acnievment in another.

  • PDF