• 제목/요약/키워드: contractor's management system

검색결과 59건 처리시간 0.027초

건설공사 발주자의 안전보건관리 책임 부여에 대한 공사 참여자 인식 조사 (Investigation of Construction Work Participants' Recognition for Assigning Safety and Health Management Responsibility to Client)

  • 원정훈;박형근;임세종;박용규
    • 한국안전학회지
    • /
    • 제30권5호
    • /
    • pp.59-66
    • /
    • 2015
  • This study investigated the recognition difference among construction work participants for the assignment of the safety and health management responsibility to a client by survey. Recently, there were some studies for the client's responsibility and duty and they suggested the client-initiative safety and health management system in order to prevent construction accidents. To supplement the existed studies, this study surveyed various construction participants such as clients, safety managers, construction managers, supervisors, others. The clients and construction managers considered the contractor as most important person to prevent construction accidents, but the safety managers and supervisors considered the client. For the opinion that the assignment of the safety and health management duty to a client is helpful, safety managers were agreed with the most. However, the clients showed the lowest agreement. The reasons that the negative opinion for the assignment of client's the safety and health management were different between clients and other construction parties. Since, clients showed large difference to other construction participants for the recognition of works' safety and health, the education about the works' safety and health management should be continuously performed for clients to have correct recognition for works' safety and health.

건설하도급분쟁에 대한 외부적 대응노력(컨설팅)의 효과에 대한 연구 (A Study on the Effect of External Response to Construction Subcontract Disputes)

  • 배찬영;현병환
    • 한국건설관리학회논문집
    • /
    • 제20권5호
    • /
    • pp.72-82
    • /
    • 2019
  • 본 연구는 건설하도급 분쟁에 대해 분쟁 발생 이전이나 분쟁이 진행 과정 중에 어떤 조직적 대응이나 분쟁 관련 컨설팅이 경영성과에 어떻게 상호간에 유의미한 영향을 미치는지를 밝혀보고자 하는데서 출발하고 있다. 본 연구에서는 다중회귀모형을 이용해 컨설팅 성과에 미치는 영향을 분석했다. 분석 결과 외부컨설팅효과(종합)에 긍정적 영향은 재무적가치, 분쟁건수증가, 내용별 대응체계구축, 시기별 대응체계구축, 분쟁대응 외부대응체계 등 5개 변수가 영향을 확실하게 미치는 것으로 나타났다. 특히 분쟁대응 기업 내적 활동와 외부 대응체계 구축 정도에 의한 영향에 있어서도 원사업자의 경우가 높았다. 이는 수급사업자의 경영 환경이 상대적으로 열악하여 대기업인 원사업자들의 내적, 외적 활동과 영향에 비해 낮을 수밖에 없다는 사실을 의미한다.

국내 건설공사 이해관계자에 관한 재해예방 강화 연구 (A Study on the Reinforcement of Disaster Prevention for Construction Stakeholders in Korea)

  • 오기택
    • 한국재난정보학회 논문집
    • /
    • 제20권1호
    • /
    • pp.192-198
    • /
    • 2024
  • 연구목적: 건설업 발주자 주도의 안전관리 체계를 구축하기 위해서 발주자를 건설업 안전관리체계의 정점에 위치 시키고 발주자의 역할을 보좌할 수 있는 안전감독자를 효과적으로 지원할 수 있는 제도를 반영 하도록 한다. 연구방법: 본 연구는 건설업 발주자 안전관리에 대한 선행연구 및 발주자 관련자들의 실태조사를 통하여 건설업 발주자 안전관리 현황에 대한 자료를 수집 및 분석 하였다. 연구결과: 발주자의 안전의식 향상 및 안전관리 역량을 제고시키는 것이 최우선 과제로서 발주자가 자신을 위한 안전관리 책임인 것을 인식하며 중대재해 등 사고 발생시 중대재해처벌법 및 산업안전보건법 등 발주자 책임에 대한 국가적 공감대가 형성될 때 발주자 주도의 안전관리 체계가 구축 될 것이다. 결론: 건설업 발주자 주도의 안전관리 체계를 구축하기 위해서 발주자를 건설업 안전관리체계의 정점에 위치 시키고 발주자의 역할을 보좌할 수 있는 안전감독자를 효과적으로 지원할 수 있는 제도 등을 반영 하도록 하여 재해예방에 기여 한다.

국내 공공공사 발주 및 낙찰제도 개선방안;미국, 영국, 일본 사례와의 비교를 중심으로 (Improvement of Public Construction Delivery System & Award Method in Korea;Comparison with Cases of U.S., U.K., Japan)

  • 지세현;이현수;박문서;송상훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.367-372
    • /
    • 2006
  • 건설산업에서 정부는 발주자이며 최대 수요자 이고, 건설산업의 보호 ${\cdot}$ 육성 및 발전을 선도하는 견인차이다. 특히 발주와 낙찰제도는 발주자인 정부와 수급자인 건설업체 간의 계약관계만을 규정하는 것이 아니라 건설산업 전반에 걸쳐 큰 영향력을 가지게 되므로, 발주 및 낙찰제도는 건설산업 발전을 위한 정부의 의지표현이라 할 수 있다. 따라서 정부는 비효율적 요소의 개선, 비용효과 및 투자효율성 향상을 위하여 노력해야 할 것이다. 본 연구에서는 선진국과 국내의 발주 및 낙찰제도를 혁신의 주체, 의지, 핵심방향, 발주자의 의식변화 측면에서 분석, 시사점을 도출하여, 국내 발주 및 낙찰제도 개선방안을 정부와 민간 공동협의체 구성, 일관되고 지속적인 개선 추진, 개선의 목표는 효과/효율 향상, 발주자의 의식변화 및 역량강화 추진의 측면에서 제안하였다.

  • PDF

TRACKING LIFT-PATHS OF A ROBOTIC TOWERCRANE WITH ENCODER SENSORS

  • Suyeul Park;Ghang, Lee;Joonbeom cho;Sungil Hham;Ahram Han;Taekwan Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.250-256
    • /
    • 2009
  • This paper presents a robotic tower-crane system using encoder and gyroscope sensors as path tracking devices. Tower crane work is often associated with falling accidents and industrial disasters. Such problems often incur a loss of time and money for the contractor. For this reason, many studies have been done on an automatic tower crane. As a part of 5-year 23-million-dollar research project in Korea, we are developing a robotic tower crane which aims to improve the safety level and productivity. We selected a luffing tower crane, which is commonly used in urban construction projects today, as a platform for the robotic tower crane system. This system comprises two modules: the automated path planning module and the path tracking module. The automated path planning system uses the 3D Cartesian coordinates. When the robotic tower crane lifts construction material, the algorithm creates a line, which represents a lifting path, in virtual space. This algorithm seeks and generates the best route to lift construction material while avoiding known obstacles from real construction site. The path tracking system detects the location of a lifted material in terms of the 3D coordinate values using various types of sensors including adopts encoder and gyroscope sensors. We are testing various sensors as a candidate for the path tracking device. This specific study focuses on how to employ encoder and gyroscope sensors in the robotic crane These sensors measure a movement and rotary motion of the robotic tower crane. Finally, the movement of the robotic tower crane is displayed in a virtual space that synthesizes the data from two modules: the automatically planned path and the tracked paths. We are currently field-testing the feasibility of the proposed system using an actual tower crane. In the next step, the robotic tower crane will be applied to actual construction sites with a following analysis of the crane's productivity in order to ascertain its economic efficiency.

  • PDF

Factors Influencing Cost Overruns in Construction Projects of International Contractors in Vietnam

  • VU, Thong Quoc;PHAM, Cuong Phu;NGUYEN, Thu Anh;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권9호
    • /
    • pp.389-400
    • /
    • 2020
  • A construction project is a designed product made up of labors, materials, and installations in the project positioned on the ground and may include the underground and ground section, and the section in water or on the water surface. It is a civil, industrial, transport, agricultural and rural development, infrastructure, or some other. A key phase in the life cycle of these construction projects is the implementation when building products are made directly with workers, equipment, materials, and managers. If there is a lack of management experience, information, and problem-solving solutions to tackle the risks faced by contractors, especially foreign ones, will fail in controlling the project's cost. This study was conducted with investigations, discussions, and evaluation of the factors that lead to cost overruns in the construction projects of international contractors in Vietnam. The principal component analysis (PCA) showed that those factors that influence cost overruns these construction projects fall into five general groups, including factors related to (i) the owners, (ii) the foreign contractors, (iii) the subcontractors and suppliers, (iv) state management, and (v) the project itself. Besides, the study proposes solutions to limit cost overruns in construction projects and improve the profitability of international contractors in Vietnam.

비교가능한 건설산업의 성과측정 Framework (A Framework of the Comparable Performance Measurement in the Construction Industry)

  • 유일한;김경래;정영수;진상윤;김예상
    • 한국건설관리학회논문집
    • /
    • 제5권5호
    • /
    • pp.172-182
    • /
    • 2004
  • 성과측정시스템(PMS)은 경영성과의 평가, 인적자원관리, 전략적 성과창출의 중요한 도구로 사용된다. 1990년대 이전까지 대부분의 기업들은 재무 중심의 성과측정을 하였지만, 최근 들어 비재무적 요소를 함께 고려한 다양한 관점에서의 균형 있는 성과측정을 하고 있다. 그러나 건설산업에서는 현실성 있는 PMS를 갖추고 있지 못한 실정이며, 이로 인해 건설산업 참 여 주체들이 스스로의 성과를 측정하고 관리하는데 한계와 문제점을 나타내고 있다. 따라서 본 연구는 건설산업의 핵심 참여 주체인 발주자, 시공사, 설계자가 스스로의 성과수준을 상대적으로 파악하고 관리할 수 있으며, 산업적 차원에서 이를 진단하고 서로 공유할 수 있는 비교가능한 PMS의 개념과 framework을 제시하고자 하였다. 연구결과로는 균형성과표(BSC) 기반의 성과지표 체계 및 측정방법, 그리고 지속적인 연구의 방향이 함께 제시되었다.

공공건설공사의 하도급 거래 공정화를 위한 계약변경 제도개선 방향 (Improvement of Contract Change Order System for the Fairness of Subcontracting in Public Construction Projects)

  • 조영준
    • 한국건설관리학회논문집
    • /
    • 제21권5호
    • /
    • pp.3-10
    • /
    • 2020
  • 공공건설사업을 수행하기 위해서는 건설 하도급은 필수적인 사항이다. 건설공사의 하수급인은 발주자와 직접 계약을 체결하지 않고 원수급인과 계약을 체결하기 때문에 발주자와 원수급인의 계약에 큰 영향을 받고 있다. 하수급인을 보호하기 위해 공정거래법이 제정되고 건설공사의 표준하도급계약서가 운용되고 있지만 발주자와 원수급인과의 관계를 다루는 국가계약법령체계에서는 하도급계약이 제대로 반영되어 있지 못하다. 특히 하도급계약에서 설계변경이 발생할 경우 금액에 따라 다양한 절차를 거쳐야 하지만 이러한 절차 등이 건설공사 표준하도급계약서에 제대로 반영되지 않고 있으므로 공공건설현장에서는 어려움을 호소하는 경우가 있다. 이에 본 연구에서는 공공건설사업현장에서 설계변경이 이루어질 경우 하도급계약의 제도개선 방향을 다음과 같이 제시하였다. 첫째, 국가계약에서 하수급인의 원수급인에 대한 권리를 강화해야 한다. 둘째, 정보비대칭성을 해소하기 위해 하수급인이 하도급계약과 관련한 정보에 접근할 수 있도록 해야 한다. 셋째, 공공공사의 원도급계약체결시에는 하도급계약의 특성을 반영하여 하수급인의 지위를 보장해야 한다. 넷째, 하도급거래 공정화를 위해 분쟁처리방법을 소송보다 조정이나 중재를 우선하도록 해야 한다.

건설정보화 전략과 ERP구축 (Establishment Construction Enterprise Resource Planning(ERP) & Construction Information Sttategy)

  • 이민남;오동환
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.164-170
    • /
    • 2003
  • 우리나라의 건설산업은 건설시장 개방으로 외국기업과의 경쟁체제 돌입이 불가피하고, 건설정책과 각종 행정규제의 급변으로 대웅전략 수립이 불가피하고, 건설정책과 각종 행정규제의 급변으로 대웅전략 수립이 곤란한 반면, 건설 수요자의 요구는 정차 다양화, 고급화 되어가고 있으나, 건설정보의 통합관리체제의 부재와 건설통합시스템의 미구축, 그리고 정보 공유와 공공정보 공개 마인드의 미성숙으로 인하여 적극적인 대처가 불가능한 실정이다. 그러므로 건설계획에서 설계, 시공, 관리유지에 이르기까기 건설 전 단계에서 발생하는 각종 정보를 통합하여 데이터 베이스 즉, ERP를 구축하고, 각종 건설정보를 공유할 수 있는 환경을 제공할 수 있는 건설통합시스템 ERP구축과 건설 CALS의 구현만이 유일한 대안이다. 따라서 건설산업의 정보화실태를 분석하고 건설CALS체제에 의한 건설통합정보시스템 ERP구축 모델을 제시한다.

  • PDF

Application of Big Data and Machine-learning (ML) Technology to Mitigate Contractor's Design Risks for Engineering, Procurement, and Construction (EPC) Projects

  • Choi, Seong-Jun;Choi, So-Won;Park, Min-Ji;Lee, Eul-Bum
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.823-830
    • /
    • 2022
  • The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.

  • PDF