• 제목/요약/키워드: construction-cost-calculation

검색결과 237건 처리시간 0.026초

A STUDY ON THE LIFE CYCLE COST ANALYSIS IN LIGHT RAIL TRANSIT BRIDGES: FOCUSED ON SUPERSTRUCTURE

  • Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.30-40
    • /
    • 2007
  • The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.

  • PDF

산업안전보건관리비 계상기준 개선방안 연구 (A Study on Improving the Occupational Safety and Health Management Cost Calculation Standards)

  • 안방율;송태석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.169-170
    • /
    • 2020
  • Occupational Safety and Health Management Cost, used to protect workers in Korean construction worksites and to create safe working environments, is a legally managed expense item. As this cost item is grounded on the Occupational Safety and Health Act, it is always implemented. However, because there is a ceiling on its rates, insufficient amounts of Safety Management Costs are often allocated to worksites, with the money not being used to areas essential to worker safety. As such, the current study raises the need to develop a set of standards to enable some items under the Occupational Safety and Health Management Costs-appropriated under the rate of indirect costs-to be appropriated as direct construction costs. As a preliminary step in this effort, the current study will provide basic data that can be used to create construction cost calculation standards for items that can be calculated as direct construction costs.

  • PDF

장기계속계약공사의 공기연장 추가간접비 산정 개선방안 (Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project)

  • 정기창;이재섭
    • 한국건설관리학회논문집
    • /
    • 제18권2호
    • /
    • pp.30-37
    • /
    • 2017
  • 공기연장과 관련한 많은 연구에도 불구하고 국내 공공 공사의 공기연장 추가간접비 산정방법에 대한 구체적인 연구가 없어 쟁점이 심화되고 있다. 또한 명확한 산정기준이 마련되지 않아 산정방식이 여러 가지로 혼용되고 있으며 타당성을 갖는 산정방식에 대한 고찰을 담은 연구가 없는 실정이다. 특히 장기계속계약에서의 휴지기발생시 추가간접비와 관련된 연구는 전무하다. 본 연구는 공사기간 동안 발생하는 비용의 패턴을 고려하여 국내 공공 공사의 특성을 반영한 공기연장 간접비 산출 방식을 제시하기 위해 현행 공기연장 간접비 산정 기준을 고찰하고 실태를 조사한 후 실제 사용되는 산정방식을 모형사례에 적용하여 그 산출결과를 비교 고찰하였다. 그 결과를 통해 기존 산정방식에 대한 문제점을 고찰하였으며, 기존 산정방식의 문제점을 고찰하는 과정에서 장기계속계약공사의 휴지기로 인한 추가간접비 산정에 적합한 산정방식인 '공사중지기간 총 실비산정방법'을 제시하였다.

BIM기반 확률론적 GMP 산정방안에 관한 연구 (Probabilistic GMP Calculation Method based on BIM)

  • 고건호;김정훈;김현주;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.122-123
    • /
    • 2018
  • Recently, CM at Risk delivery system(CM@R) that could solve the problems of Design Bid Build delivery(DBB) system has been emerging. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the contractor carries out the construction within the GMP. In CM @ R, the construction company with expertise in construction participates from the design stage to reflects the construction know-how in the design. On the other hand, the modification design frequently occurs due to the change of the construction cost when negotiating the GMP. In addition, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. This study proposes a probabilistic GMP estimation method applying MCS to the BIM - based cost prediction model, in order to extract the accurate quantity information when estimating the GMP and to cope with the change of the construction cost inherent in uncertainty.

  • PDF

엔지니어링대가 공사비 요율 산출방법 고찰 (Calculation of Construction Cost Rate to Telecommunications Engineering Service)

  • 홍완표;최광돈
    • 한국정보통신학회논문지
    • /
    • 제10권12호
    • /
    • pp.2121-2125
    • /
    • 2006
  • 본 논문은 엔지니어링 기술진흥법 제10조에 근거하여 엔지니어링 대가를 계산하는 경우에 적용하고 있는 공사비 요율방식의 공사비 요율을 산출하는 방식을 이론적으로 고찰하였다. 기존의 공사비 요율은 경험치에 의한 통계방식 또는 외국에서 적용되고 있는 요율을 기준으로 산출하여 왔다. 이 논문에서 제시하는 공사비 요율 산출방식은 기존의 경험통계에 의한 요율곡선을 적용하면서 요율산출에 필요한 요소를 이론적으로 적용하는 것으로서 통신부문의 엔지니어링 대가 산정에 필요로 하는 공사비 요율을 합리적으로 산출할 수 있다.

편익과 비용 분석을 통한 소형차전용지하차도 도입에 관한 연구 (A Study on Building of Underpass for Small Vehicles by Benefit and Cost Analysis)

  • 이영우
    • 한국도로학회논문집
    • /
    • 제15권2호
    • /
    • pp.149-157
    • /
    • 2013
  • PURPOSES : This study is to analysis for benefit and construction cost in underpass for small vehicles. METHODS : The study was performed using the traffic software VISSIM 5.20 for analysis on a variety of traffic conditions and analysed of benefits of changes through analysis of travel speed and travel time after modeling of existing underpass and small vehicle underpass. RESULTS : Results of this study, the benefits will be reduced by the introduction underpass for small vehicles were analyzed because heavy vehicles use the intersection above the underpass. However, it was required economic analysis considering both the benefits reduction and the construction costs reduction because it has the effect of reducing the construction cost. Showed that the difference in benefit changes depending on the v/c and heavy vehicles ratio and construction cost was difference by types of underpass. As a result of performing economic analysis with total benefits and construction cost, it was analyzed to be economical in underpass over a certain size. CONCLUSIONS : The result of this study are expected to be able to contribute to reviewing for feasibility due to the small vehicles underpass introduction and economic analysis. The study is case study to the underpass in Daegu. Therefore, the future requires the calculation of benefits reflect a wider range of traffic conditions and the economic analysis to construction cost calculation for various types of grad separation facilities.

적정공사비 산정을 위한 공사비할증기준 분석 (Analysis of Construction Cost Weight Standards to Calculate Appropriate Construction Costs)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.157-158
    • /
    • 2020
  • In order to calculate construction costs properly, it is necessary to add the weight that reflects different worksite conditions. The implementation of the weight, however, is difficult because it is impossible to determine whether wight should be added in basic work or whether weight values are overlapped. Special worksite conditions further complicate the matter. Furthermore, overlapping implementation of weight values result in overestimation of construction costs. The current study clearly analyzed the weight value items in the current construction cost calculation standards, and analyzed the weight value items included under the basic productivity category to propose an improvement of weight standards. Basically, the estimating standards provide 140 weight value items, with different levels of weight given to each item. Among 1,333 items in the estimating standards, 140 include weight values. Some items have two types of weight values.

  • PDF

기획/계획단계에서 공동주택 건축공사비 산정을 위한 프로세스에 관한 고찰 (A Study on the Process for Estimating the Construction Cost of an Apartment House in the Planning/Planning Stage)

  • 조성민;조성희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.228-229
    • /
    • 2021
  • Planning/planning stage Construction cost prediction is very important. In particular, flexible thinking is required to predict the construction cost by reflecting rapid market changes and current conditions. Therefore, in this study, we tried to consider the process for calculating the construction cost of an apartment house in a more accurate planning/planning stage. First, cases were collected based on the classification system by construction type. Second, the construction cost was predicted using the case-based reasoning technique. Third, the composition ratio by construction type of the most similar case was applied to the derived construction cost. Finally, the construction cost was predicted based on practical corrections reflecting the market and field conditions.

  • PDF

OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구 (A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly)

  • 이정욱;이한수;이치호;노현석
    • 한국건설관리학회논문집
    • /
    • 제23권6호
    • /
    • pp.89-100
    • /
    • 2022
  • 최근, OSC(Off-Site Construction)기반 PC구조의 활성화를 위한 제도적 기반 마련의 일환으로 적정공사비 산정에 필요한 품셈 개발을 요구받고 있다. PC공법의 공사비는 공장제작-운반-현장설치의 단계로 구성된다. 최근 운반과 현장 설치는 부재(subsidiary materials)별 현장실태 조사 결과를 반영한 표준품셈 체계(standard product calculation system)를 제시하는 등 관련 연구가 진행되고 있다(Lee et al., 2021). 반면, 공장 제작 공사비 산정과 관련된 연구는 전무한 실정이다. 본 연구에서는 PC 공법의 공장제작 공사비 산정기준 마련을 위해 공장 제작 환경에 활용할 수 있는 품셈 체계를 제시하였다. 이를 위해 시공절차에 따른 작업 공종을 도출하였으며, 공종별로 연계된 표준품셈을 분석하여 작업 특성에 적합한 표준 투입인력을 산출하였다. 품셈 체계는 PC부재의 현장설치와 동일하게 기둥, 보, 벽체, 슬래브 부재로 구성하였으며, 공종별 기능공을 기준으로 부재별 기본공수를 제시함으로서 직접노무비의 산출이 가능하도록 하였다. 또한, 개별 부재의 규격(m3)에 따라 생산성이 변화되는 특성을 고려하여 부재 크기를 품의 할증 요소로 제시하였다. 본 연구결과는 현재 견적에 의해 재료비료 계상되는 PC공법의 공장제작 비용을 객관적으로 검증할 수 토대 마련에 기여할 수 것이다.

소규모 시공현장 적정공사비 확보를 위한 원가기준 마련 연구 (A Study on Cost Standards for Securing Appropriate Construction Costs for Small-Scale Construction Sites)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.347-348
    • /
    • 2023
  • In construction sites, small-scale construction quantities or limited work hours below the daily work volume may occur due to on-site conditions. For small-scale quantities, the input of equipment and labor is designed based on an hourly basis in the invoice, resulting in a difference from the actual cost. In this study, we aim to explore solutions from the perspective of construction cost standards to secure appropriate construction costs for small-scale and time-limited construction sites. Firstly, to preserve the basic construction costs on-site, we established standards where half the cost would be charged for construction quantities below four hours and a full day's cost would be designed for construction quantities between four to eight hours. Additionally, realistic construction cost calculation standards are expected to be provided by realizing a surcharge rate for work hour limitations to secure appropriate construction costs.

  • PDF