• 제목/요약/키워드: construction-cost-calculation

검색결과 237건 처리시간 0.021초

한국 수소 충전소 건설의 경제성 분석 (Analysis of Costs for a Hydrogen Refueling Station in Korea)

  • 강병우;김태현;이택홍
    • 한국수소및신에너지학회논문집
    • /
    • 제27권3호
    • /
    • pp.256-263
    • /
    • 2016
  • As the hydrogen era comes near future, hydrogen fuel cell vehicles are core of hydrogen economy. Until now, Korea has 17 hydrogen refueling stations but 9 hydrogen refueling stations have been retired already and 8 hydrogen refueling stations are still running. With a limited number of hydrogen refueling stations, it is very difficult to get scientific data for the economy of hydrogen refueling stations in Korea. Thus, based on NREL(National Renewable Energy Laboratory) study, we analyzed most recent data for the construction of hydrogen refueling stations in one specific site in Korea. The cost comparison data between Korea and USA shows 14% difference, saying higher costs of Korea. Korea looks 5 years delay compared to USA. This data will be an important tool for the investment from every industrial parties.

IFC-BIM 연계 지식정보기반 마감공사 개산견적 프레임워크 (Schematic Estimate Framework of Finishing Works based on IFC-BIM Knowledge)

  • 박상헌;박형진;구교진
    • 한국산학기술학회논문지
    • /
    • 제16권6호
    • /
    • pp.4176-4184
    • /
    • 2015
  • 건설사업 전 생애주기 중 설계단계에서의 대안별 비용 예측은 사업의 수익성 및 타당성 분석을 위한 판단기준이 된다. 설계도서가 완성되지 않은 초기 설계단계에서 과거의 유사자료를 바탕으로 개산견적이 실시되고 있다. 견적자의 경험과 산정방법에 따라 물량이 상이하고 누락되는 경우가 발생한다. 최근 IT기술 발전으로 BIM 기술이 주목을 받으면서 건설 전반에 걸쳐 기획, 설계, 시공, 유지관리 기술의 패러다임을 변화 시키고 있다. BIM을 활용한 다양한 연구가 시도되고 있지만, 활용 효과는 건설 사업의 기대에 미치지 못하고 있다. 본 연구에서는 국제 표준 IFC와 견적 관련 지식정보를 연계한 개산견적 프레임워크를 제안한다. 그 결과, 초기 설계단계에서 의사결정을 위한 공사비 예측을 수행하며, 그리고 선행연구의 한계점을 일부분 극복이 가능할 것으로 기대된다. 또한, 개산견적 프레임워크는 프로세스 일부를 자동화하였기 때문에 변경에 대한 능동적인 대처가 가능하다.

STEEL BOX 교량 상부구조의 BIM기반 설계 (BIM based Design of Steel Box Girder)

  • 이진경;이헌민;유재명;신현목
    • 한국BIM학회 논문집
    • /
    • 제1권2호
    • /
    • pp.6-11
    • /
    • 2011
  • 국내 토목분야의 건설 산업은 비효율적인 의사소통으로 인하여 업무전환단계에서의 정보 누락 및 그로 인한 비용손실 등의 문제점이 발생한다. 이러한 문제점에 대한 해결책으로 BIM의 도입이 대두되고 있다. BIM은 구조물의 생애주기 전 단계에서 발생되는 모든 정보들을 3차원 파라메트릭 CAD와 연계된 3차원 정보모델을 통하여 관리하여 정보 활용의 효율성을 극대화 시킨다. 본 논문에서는 BIM기반의 교량 건설 프로젝트의 구조설계업무에서 사용할 목적으로 3차원 정보모델을 활용한 교량의 구조설계 프로세스를 제안하였다. 제안된 프로세스는 구조설계업무를 통하여 결정되는 정보들을 활용하여 3차원 정보 모델링작업이 이루어질 수 있도록 구성하였다. 또한 제시된 프로세스를 활용하여 현재 건설이 진행 중인 스틸박스 교량의 상부구조를 대상으로 구조설계의 최종 산출물인 구조계산서를 구축된 BIM기반의 구조설계 프로세스를 활용하여 도출할 수 있도록 구성하였다.

운반작업의 영향요소분석을 통한 덤프트럭의 운반속도 산정방법에 관한 연구 (A Study on the Estimating of the Dump Truck's Travel Speed Based on Analysis of Factors Affecting Earthmoving Operation)

  • 박현용;태용호;우성권
    • 한국건설관리학회논문집
    • /
    • 제8권3호
    • /
    • pp.97-105
    • /
    • 2007
  • 댐, 고속도로, 공항, 플랜트, 빌딩, 상하수도 처리장과 같은 많은 건설공사의 운반 작업이라 함은 프로젝트의 요구조건에 맞게 지면의 형상과 조건을 변형시키기 위하여 일정량의 토사를 운반하는 작업을 의미하며 흙 운반 작업의 정확한 이동시간의 계산은 작업의 생산성을 결정하고 궁극적으로 작업을 수행함에 있어 비용 효과적 인 장비배치를 위해 필수적인 요소라 할 수 있다. 그리고 덤프트럭을 활용한 운반 작업은 설계가 대비 평균 6%의 비용을 차지하고 있어 덤프트럭을 이용한 운반 작업은 공사비 관리 측면에서 중요한 비용 인자로 구분되어 관리해야 할 것이다. 따라서 본 연구에서는 현재 공사가 진행 중인 현장의 덤프트럭 주행속도의 자료 수집을 통하여 각 도로유형별 주행 속도에 영향을 미치는 요소를 파악하고 해당 도로유형별 영향요소를 고려한 도로유형 별 적정 주행 속도 산정에 관한 방법을 제시하고자 한다.

BES를 사용한 에너지 절감형 양돈장의 지열히트펌프 적정 용량 산정 (Estimation of Adequate Capacity of Ground Source Heat Pump in Energy-saving Pig Farms Using Building Energy Simulation)

  • 이성원;오병욱;박광우;서일환
    • 한국농공학회논문집
    • /
    • 제64권1호
    • /
    • pp.1-13
    • /
    • 2022
  • In Korea, attention is being paid to the use of renewable energy in the livestock industry, and Ground Source Heat Pump (GSHP), which is advantageous for temperature control, is considered as one of the ways to reduce the use of fossil fuels. But GSHP is expensive to install, which proper capacity calculation is required. GSHP capacity is related to its maximum energy load. Energy loads are affected by climate characteristics and time, so dynamic analysis is required. In this study, the optimal capacity of GSHP was calculated by calculating the heating and cooling load of pig farms using BES (Building Energy Simulation) and economic analysis was performed. After designing the inside of the pig house using TRNSYS, one of the commercial programs of the BES technique, the energy load was calculated based on meteorological data. Through the calculated energy load, three heating devices and GSHP used in pig farms were analyzed for economic feasibility. As a result, GSHP's total cost of ownership was the cheapest, but the installation cost was the highest. In order to reduce the initial cost of GSHP, the capacity of GSHP was divided, and a scenario was created in which some of it was used as an auxiliary heating device, and economic analysis was conducted. In this study, a method to calculate the proper capacity of GSHP through dynamic energy analysis was proposed, and it can be used as data necessary to expand the spread of GSHP.

사용자 요구 사항 분석에 따른 물량산출 연동 프로그램 개발 (A Development of 3D Computer-Aided Design(CAD) Add-on Program for a Quantity Take-off through the User Needs Analysis)

  • 김성아;이재준;신태홍;진상윤;김예상;최철호
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.297-300
    • /
    • 2008
  • 1990년대 3D CAD가 출현한 이후, 최근 BIM(Building Information Modeling)이 이슈화되고 있다. BIM이라 함은 건설 프로젝트 생애주기 전반에 걸쳐 생성되는 정보를 3D Model과 함께 관리하는 것으로, 건설 프로젝트 각 분야의 정보들을 3D 모델과 연동하는 프로세스를 가지고 있다. 이에 견적 분야에서도 3D 모델로부터 자재의 물량을 산출하는 연구들이 진행되어 오고 있으며, 국내l에서 상용화된 견적 프로그램을 국내 건설 프로젝트에 적용하려는 시도가 이루어지고 있다. 그러나 이는 2D 도면으로부터 물량을 산출하는 기존의 견적방식보다 작업시간 및 생산성 측면에서 효율성이 떨어질 뿐만 아니라, 국외 견적 업무는 국내 견적과 다른 방식으로 이루어지고 있기 때문에 국외 상용 프로그램을 국내 건설 프로젝트에 적용하는데 한계가 있다. 그러므로 국내 건설 프로젝트에서 3D 기반 견적 프로그램을 활용하지 못하고 있다. 본 연구에서는 국내 실정에 적합한 3D 기반 견적 프로그램 개발을 위해 우선적으로 고려되어야 할 3D CAD로부터 물량 정보를 견적 프로그램으로 전달하는 3D CAD와 물량산출 연동 프로그램을 제안하고자 한다.

  • PDF

공동주택의 재건축과 리모델링의 비교분석을 위한 모델구축방안 (LCC Analysis Model of the Reconstruction and Remodeling Types of High-density Apartment Houses)

  • 정용식;이상범
    • 한국건축시공학회지
    • /
    • 제5권4호
    • /
    • pp.91-98
    • /
    • 2005
  • This paper illustrates a comparative analysis on the economic efficiency of remodeling method that is one of major factors in totting more desirable standards and proposes to utilize LCC calculation techniques in generating a required budget for more effective quantity-based analysis that is both objective and effect. Rather than comparing only the initial lost of two different methods, it seems through to compare their entire life cycle cost that includes any repair and reconstruction/ remodeling expenses, thus generate overall quantitative analysis in objective perspective

옥상 뜬바닥 구조공법의 접착제 최적 배합비 산정을 위한 부착성능 실험 (Bond Performance Test for Optimum Mixing Ratio Calculation of the Floatig Floor Method on Roof-top)

  • 서유현;박준모;김옥규;정일기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.111-112
    • /
    • 2016
  • Waterproofing methods for applying to roof-top in the building are various, but it is not enough to development, which are simplified and low-cost method for old building. Especially, these buildings have not only a low insulation, but a disadvantage for energy. A floating floor method is necessary for this. This study performs an experimentt about bonding capacity of complex panel for waterproofing and heat insulation. The bond strength experiment is based on KS F 4716, and it is considered by bond mix proportion about panel and slab.

  • PDF

물가변동제도 운영방식 개선방안 (Improvement on the Managerial Method of Price Fluctuation System)

  • 이재섭;신영철
    • 한국건설관리학회논문집
    • /
    • 제12권2호
    • /
    • pp.3-11
    • /
    • 2011
  • 공공건설공사의 계약금액조정사유로서 물가변동제도는 1969년 시설공사계약일반조건으로 처음 도입되었다. 조정요건은 계약일로부터 90일 경과 및 입찰일로부터 등락률 3%이상을 동시에 충족하여야 하는데 이 때 적용하는 등락률 산정방식은 품목조정과 지수조정의 단 두 가지뿐이다. 4개 공공기관의 163개 사업장을 조사한 결과 모두 지수조정방식을 적용하고 있었고, 조정기준일부터 계약금액조정 승인일까지 6개월을 초과하는 사업장이 전체의 90%를 상회하였다. 계약금액조정까지의 장기간 소요는 복잡한 등락률 산정방식이 주원인이므로 이를 다양화하여 시공자의 선택권을 확보하는 것이 필요하다. 현행 발표되는 한국은행의 생산자/소비자물가지수의 평균지수, 건설공사비지수에 대한 보정계수를 적용하는 방식을 추가한다면 별도의 추가비용 없이도 다양화를 만족시켜 조정신청지연을 최소화할 수 있다. 따라서 본 연구에서는 물가변동으로 인한 계약금액조정을 신속하고 효율적으로 이행할 수 있도록 물가변동률 산정방식의 다양화와 시공자의 선택권 확장 등의 물가변동제도 운영방식 개선방안을 제시하였다.

공공 건축사업의 공사기간 산정 현황 분석을 통한 개선방안 (Improvement Plan Through Analysis of the Current Status of Construction Period Calculation of Public Construction Projects)

  • 이종태;윤현도
    • 한국건설관리학회논문집
    • /
    • 제22권3호
    • /
    • pp.12-20
    • /
    • 2021
  • 건설 품질 및 안전 확보, 비용분쟁 방지를 위해 최근, '적정 공사기간' 산정의 중요성이 부각되었다. 건축공사기간 산정기준 마련을 위해서는 상당량의 과거자료 분석이 필요하다. 그러나, 근로시간 단축, 품질규정 강화 및 기후조건 변화 등 건설사업 환경이 이미 변경되어 과거자료의 사용에 대해 많은 전문가들이 의문을 제기하고 있는 실정이다. 또한, 건축공사는 공사 여건에 따라 작업순서, 생산성 등이 매우 다양해 과거 통계치를 활용한 획일적인 공사기간 산정 시 오류 가능성이 상승한다. 따라서, 적극적인 '생각의 전환'을 통해 과거자료 분석 방식에서 현재생산자료 검토 방식으로 변경하는 새로운 해법을 본 연구를 통해 제시하였다. 즉, 설계단계에 '공정관리 전문가' 및 '공종별 시공전문가'를 투입하여, '적정 공사기간'을 검토·산정하는 절차를 제도화하였다.