• 제목/요약/키워드: construction works

검색결과 1,811건 처리시간 0.028초

이사벨 톨리도 컬렉션에 나타난 유기적 기하학 (Organic Geometry in Isabel Toledo's Collections)

  • 임은혁
    • 한국의상디자인학회지
    • /
    • 제18권4호
    • /
    • pp.63-75
    • /
    • 2016
  • This study examines the organic geometry in Isabel Toledo's collections in terms of the practicality of American sportswear tradition. This study conducts literary survey combined with case analysis of Toledo's works from her debut collection in 1985 to the recent ones. The organic geometry in Toledo's designs refers to the conversion of two-dimensional garment patterns into three-dimensional garment forms with the body as a medium, which is classified into the following categories in this study. First, 'fluidity' describes Toledo's highly fluid jersey dresses which maintain consistent structures by patchwork draping and suspension technique. Second, 'reductionist structure' illustrates that simple geometric shapes such as circles and squares disappear as soon as worn on the body. Third, 'origami construction' explains folding two-dimensional fabrics into three-dimensional forms, which causes the outlines of the body to appear abstract. Toledo's designs deliver the tradition of American sportswear through the organic geometry of garment construction. Toledo's works are authentic American in the aspects that they are functional and modern; they satisfy the practical needs, prioritize the movements of wearers, pursue multi-functions, and their ornamental elements are accompanied by the construction of garments. Isabel Toledo presents designs drawing on her unwavering aesthetics while continuously developing and experimenting creative ways of garment construction.

  • PDF

LESSONS LEARNT IN THE IMPLEMENTATION OF DEVELOPMENT PROJECTS IN SOUTH AFRICA

  • Wellington Didibhuku Thwala
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.364-367
    • /
    • 2011
  • The levels of unemployment and poverty are extremely high and two of South Africa's most pressing problems. There is also a widely acknowledged need for housing and municipal infrastructure (water supply, sewerage, streets, storm water drainage, and electricity, refuse collection). From a theoretical perspective supported by experience elsewhere in Africa, there are reasons for considering that properly formulated employment creation programmes based on the use of labour-intensive methods could be established to construct and maintain the required physical infrastructure, thus creating employment, skills and institutional capacities. Over the past 30 years several projects have been initiated in South Africa to counter unemployment and poverty. Given the socio-economic conditions and political objectives (regarding development, employment creation and alleviation of poverty), it is anticipated that future large-scale construction projects will be proposed by the public sector (National, Provincial and Local Government). The paper will first examine the main tenets of the implementation of development projects through the use of labour-intensive construction and a description of progress elsewhere in Africa and their potential contribution which public works programmes could make to alleviate the poverty and unemployment problems. The research will then analyse the successes and challenges that have been experienced in South Africa in relation to the implementation of development projects over the past 30 years. The paper closes with recommendations and lessons for the future.

  • PDF

건설공사 시공평가 시기 조정 (Adjust timing of Construction Construction Evaluation)

  • 윤지호;남경우;장명훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.78-79
    • /
    • 2019
  • A construction project with a total construction cost of over 10 billion KRW should be evaluated whether construction works are appropriately executed. The evaluation is carried out on quality management, process management, construction management, safety management, environmental management. The implementation period is within 60 days after completion of construction of the construction, from the time when the construction rate of the construction work has progressed by more than 90% to the construction cost. However, the participating construction engineers should prepare the evaluation within the period according to the evaluation criteria, but there are difficulties in preparation for the evaluation due to the reasons such as the change of engineers in charge and loss of data. Therefore, this study proposes the procedure of construction evaluation and adjusts timing of construction evaluation.

  • PDF

동해안 대형 산불피해지의 사방사업 실태진단 (The investigation of erosion control works' condition in East sea fire area)

  • 염규진;전근우;차두송;이시영;이현규;이명욱;김윤진;이진호;김석우;강기차부
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2007년도 정기총회 및 학술발표대회
    • /
    • pp.509-512
    • /
    • 2007
  • The fire area need management to prevent enlargement of collapes and sinkage. and it need that repair Vegetation sack work, Soil arresting structure, Terrace-sodding works, Direct seeding works in greening works and Water cushion in erosion control dam. The whole of the Concrete stream grade stabilization structures were broken, it need to be repair. As pass the time, a lot of structures were abandoned. Therefore, it need to reorganize erosion control structures and the method of construction in the fire area

  • PDF

디오르 작품에 대한 갈리아노의 현대적 재해석에 관한 연구 (A Study on the Modern Reinterpretation of Galliano to the works of Dior)

  • 구미지
    • 복식
    • /
    • 제51권8호
    • /
    • pp.43-49
    • /
    • 2001
  • Galliano's works showed at Dior Collection in 1997 which was held for the 50th anniversary of New Look got a good evaluation in the sense of expressing the modern taste as well as reflecting the spirit of Dior. The purpose of this study is focused on observing how to adapt the Dior's spirit. to Galliano's own design and what is the factor to let us feel his works modern. Galliano's fifty works in that Collection are analyzed by content analysis. The result is as followed : Galliano created his fabulous and modern works by four ways such as using various ethnic details, new way of fabric usage, new construction. and differentiated color harmony from Dior's. This result also includes the methodological model to adapt to design process.

  • PDF

게리트 리트벨트 디자인 개념 재평가에 관한 연구 (A Study on the Reappraisal of Gerrit Thomas Rietveld's Design Concept)

  • 이광인
    • 한국디지털건축인테리어학회논문집
    • /
    • 제12권4호
    • /
    • pp.97-105
    • /
    • 2012
  • This study aims to evaluate Rietveld's creative design style and concepts. To this end, I looked into the evaluation of major researchers on Rietveld, classified all his works into four groups according to the design types and analyzed them. As follows: based on the results of the analysis of works I concluded. First, Rietveld created the concept of the spatial extension to the ingenious joint which had the structural node formed of three listels with quadrangular section. It is the design innovation that led to liberate the closed construction. Second, Rietveld had opened up the possibility to neutralize the gravitational three-dimensional works. He subtracted the weight in the direction of gravity from the three-dimensional structure of the works and painted the three primary colors on them partially to get rid of the original material color. Therefore they looked like the forms liberated from gravity. Third, Rietveld ripped off the surfaces of cube through several formative experiments and decomposed the volume into the tesseract. Through this method of realizing the new plastic concepts, he completed the architectural models of weightlessness. Fourth, Rietveld opened the possibility of the realization of the three-dimensional works integrated all space and time in the one-pieced works and the folded works. Fifth, Rietveld steadily experimented and realized the internal and external integration of time and space in his later works.

정보편익에 의한 농촌생활환경시설의 계획 모델 개발 (Development of a Planning Model of Rural Living Environment Facility by Information Benefit)

  • 나준엽;정남수;이정재
    • 농촌계획
    • /
    • 제12권4호
    • /
    • pp.77-82
    • /
    • 2006
  • The objective of public works planning is being converted from economic growth to sustainable development. So, the demand for considering social & ecological influences as well as economic components had been increased in evaluation of public works planning. In evaluation of public works, its components related with benefit and cost in feasibility analysis can be classified to qualitative and qualitative elements. Qualitative elements are evaluated by qualitative methods which can manage various items, be commonly applied nationwide, and consider elements that can be calculated numerically such as environments, willingness, etc. In this study, using the concept of 'Information measure', a method to design planning of rural works is proposed. 'Information benefit model' for rural works can evaluate present plan in the side of provider's and demander's 'benefit'. And, optimizing method of rural works by 'Information benefit' can simulate present state and optimize the site and route of rural works.

대공간 지붕공사 시공지침서 개발을 위한 중점관리항목 도출 (Principal Items of Construction Management for Developing Construction Guide of Large Spatial Roof Construction)

  • 차민수;이명도
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.197-198
    • /
    • 2017
  • Large spatial construction needs to consider various construction management factors through the construction guide, including high-tech roofing works for creating large space without columns and erecting large spatial structure. However, the domestic large spatial construction relies on overseas construction technologies due to the lack of construction guide of large spatial construction and experience in similar type of project. To improve the problem, we deduced principal items of construction management considering characteristics of large spatial construction as a preliminary study for developing a construction guide.

  • PDF

공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 - (Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors -)

  • 전상훈;구교진
    • 한국건설관리학회논문집
    • /
    • 제16권1호
    • /
    • pp.110-118
    • /
    • 2015
  • 표준품셈은 우리나라 건설공사에 있어 가장 기본적인 요소이지만, 표준품셈이 공동주택 건설공사에서 실제 투입 되는 노무량과 큰 차이를 나타내고 있다. 따라서 실적공사비방식에 의해 공사비를 산정하는 것이 합리적인 대안이 될 수 있으나 원가계산서상에 각종 경비 등에는 정확한 노무량을 파악하여야 비용이 산출될 것이며 공사 진도 관리를 위해 투입 노무량을 정확히 파악할 필요가 있다. 본 연구는 2000년 이후 준공 된 수도권에서 공동주택 건설공사에서 표준품셈과 실투입 노무량을 조사하여 비교한 결과 다음과 같은 결과를 얻을 수 있었다. 실제 투입 노무량은 조적공 1.184인/천매, 미장공 0.048인/$m^2$, 방수공 0.039인/$m^2$, 타일공 0.059인/$m^2$이다. 표준품셈 대비 투입율은 보면 조적공 59.8%, 미장공41.3%, 방수공 31.5%, 타일공 34.3%이다. 방수공의 투입 비율이 가장 낮고 조적공이 비교적 높았다. 따라서 우리나라 공동주택 건설공사의 노무량은 실적공사비를 토대로한 원가계산이 바람직하지만, 공사관리에서 노무량이 주요 변수인 만큼 실제에 근접한 표준품셈을 지속적인 보완이 필요할 것으로 보인다.

건축물 해체공사의 통합 안전관리 가이드라인 개발 및 적용성 평가 (Development of Integrated Safety Management Guidelines and Applicability Validation - Focused on the Building Deconstruction Works -)

  • 최종수;허성태;고원준;이희민
    • 한국건설관리학회논문집
    • /
    • 제11권6호
    • /
    • pp.45-53
    • /
    • 2010
  • 국내 건축물 해체공사의 안전관리 분야는 연구, 제도정비 및 실무 차원에서 소외되어온 경향이 있다. 해체공사의 수행과정에 있어서 체계적이지 못한 안전관리 실태, 부실한 교육체계, 활용할 수 있는 교육용 교재의 미흡 등은 안전사고의 빈도 및 사고발생시 중대사고로 이어지는 주요 원인이 되며 그 수준은 외국의 경우와 비교하여 볼 때 대단히 높은 실정이다. 본 연구에서는 이러한 국내 해체업계 현황의 개선을 목표로 기계식 전면해체공사 및 리모델링을 위한 부분해체공사를 포괄하는 통합 안전관리 가이드라인을 개발하였다. 구체적인 연구 성과물은 안전관리매뉴얼, 체크리스트, 포켓용 팸플릿, 전자매뉴얼 등이며, 연구성과의 검증을 위하여 해체공사 유경험자를 대상으로 실무에 대한 적용성 평가를 수행하였다.