A Fundamental Study on the Float Application of Construction Schedule Management (건설 프로젝트 공정관리에 있어서 Float 활용에 대한 기초연구)

  • 이상범;진유나;송진우;김정길
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.133-137
    • /
    • 2003
  • Float has been just recognized spare time for disposing of unexpected conditions as by-product of CPM(critical-path-method) calculations, in spite of important method for construction period, taking in material, human supply and cost reducation in construction process management. Also float necessary follow method of contract by ownership problem and effect construct management of use. The purpose of this study was to examine current recognition and application grade of float in construction project. In addition, the study proposes improvement strategies of float application for efficient progress plan and control.

  • PDF

Development of Cost Management Process during Design Phase based on Design to Cost (DTC(Design to Cost)기반의 설계단계 사업비관리 프로세스 개발)

  • Park, So-Hyun;Moon, Hyun-Seok;Hyun, Chang-Teak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.209-212
    • /
    • 2009
  • The Development of Cost Management is embossed efficiently to use the budget for the construction industry. The government is exploring every efforts and polices to control increasing the budget for the construction industry. However, despite of the government's efforts, researches are insufficient for a cost management of development. Also, the changed cost of construction by frequent plan change is caused of decline in quality etc during an accomplishing project. Therefore, in this study, analyzed about principal official phase of design phase to solve the problem. In order to define clearly the target cost concepts in the planning phase apply to the DTC(Design To Cost) concept and technique at the development of cost management process which will be able to manage the enterprise expense. It's process is expected with the fact that will be the possibility efficiently of fixing target cost in the planning phase by the construction client and designer.

  • PDF

Development of Climbing Hydraulic Robot System's Synchronizing Controller for Construction Automation (시공자동화를 위한 크라이밍 유압로봇시스템의 동기제어 컨트롤러 개발)

  • Cho, Nam-Seok;Kim, Chang-Won;Kim, Dong-In;Lee, Kyu-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.167-169
    • /
    • 2011
  • Construction Automation as a way to solve the problems of lack of skilled labor by decrease in construction population productivity and quality decrease. We are on the way to develop a construction automation system adequate for domestic circumstances in Korea; it is called RCA(Robotic-crane based Construction Automation) system. Climbing hydraulic robot system is a part of RCA system and makes Construction Factory(CF) climb next floor. The controller can control movement needs to be developed for CF safety. Synchronous control the actual field was applied to the controller logic and synchronous control of the process through which the safety has been verified. The purpose of this study that control of climbing hydraulic robot system behavior on real-time, and to improve safety for overall construction automation system through synchronous motion controller.

  • PDF

An $\overline{X}$-Control Chart Based on the Gini′s Mean Difference (지니(Gini)의 평균차이에 기초한 $\overline{X}$-관리도)

  • 남호수;강중철
    • Journal of Korean Society for Quality Management
    • /
    • v.29 no.3
    • /
    • pp.79-85
    • /
    • 2001
  • Estimation of the process deviation is an important problem in statistical process control, especially in the control chart, process capability analysis or measurement system analysis. In this paper we suggest the use of the Gini's mean difference for the estimation of the process deviation when we design the control limits in construction of the control charts. The efficiency of the Gini's mean difference was well explained in Nam, Lee and Jung(2000). In this paper we propose an $\overline{X}$ control chart which use the control limits based on the Gini's mean difference. In various classes of distributions, the proposed control chart shows food performance.

  • PDF

The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular (유닛모듈러 기반 도시형 생활주택의 BIM 모델링 프로세스 개발 연구)

  • Lee, Chang-Jae;Lim, Seok-Ho
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.77-84
    • /
    • 2012
  • The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.

Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • v.10 no.1
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

A Study on Using PSM Policy for the Serious Accident Prevention of Construction (건설업 중대재해 예방을 위한 PSM 제도 활용에 관한 연구)

  • 정범모;양광모;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.4
    • /
    • pp.1-14
    • /
    • 2002
  • As domestic buildings have been large-scaled, diversified and high-rise, there have been a consistent demand for design, development of construction technology and accident prevention activity as well as quality enhancement. In spite of governmental and related institutions' efforts for reducing national losses which come from numerous accidents, there have been endless small and large accidents on the construction site and thus, it is urgent to conduct empirical researches in this area. Currently safety supervision system in construction industry has enforced harm and danger prevention planning system, however it merely stick to other existing materials. In addition, it is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM method. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries,' thereby strengthening there competitive edges. Boost of safety control system by PSM method will make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.

A Case Study of Ergonomic Evaluation for the Control Rooms of a Petroleum Complex

  • Chang, Seong Rok;Yoon, Hoon-Yong;Cheng, Hong-In
    • Journal of the Ergonomics Society of Korea
    • /
    • v.36 no.1
    • /
    • pp.1-7
    • /
    • 2017
  • Objective: Two control rooms of a petroleum complex were ergonomically evaluated for this study using diverse drawings of the rooms. The objective of the study is to show the evaluation process and its results, assessment method and essential elements for drawing-based ergonomic evaluation. Background: Ergonomics can enhance the working environment and safety for a control room when implemented effectively. A control room design was examined by ergonomists based on ergonomic principles and well-practiced standards. This study was conducted because a construction consortium wanted to perform an ergonomic evaluation of the control rooms before the construction. Method: A simple evaluation process, composed with a pre-evaluation, an evaluation and a post-evaluation, was employed to carry out the study. ISO 11064, NUREG-0700, NUREG/CR-6150, and CRIOP were reviewed to evaluate the control rooms. The assessment ranges over the control room layout, workstations, display and control, environmental requirements and safety. Three ergonomists participated in the study and performed the evaluation for two months. Results: An experienced consortium of construction companies designed the petroleum complex and control rooms. No significant ergonomic design problems were detected. Quantitative recommendations were provided for the layout and workstation dimensions. Specific design directions were also proposed for environmental requirements and safety. Conclusion and Application: Design advice and minor potential problems were reported as results of the drawing-based ergonomic evaluation. More practical suggestions could be additionally provided if an on-site assessment was conducted. However, the ergonomic evaluation used in this study could be helpful and applied to designing and evaluating other various control rooms prior to their construction.

Construction Process & Technologies Applied to Parc.1 Project

  • Hoi-soo, Seo;Jae-min, Baek
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.181-187
    • /
    • 2022
  • POSCO E&C has completed Parc.1 project successfully. The construction period was 42months, and 1.5 million workers were participated till completion. To meet schedule management and quality control, POSCO E&C has adopted a lot of technologies such as GPS measurement, 3D scanning, vibration control, stack effect control, column shortening control, etc

The Constructability Evaluation of Ecological Restoration Construction Using Environment-friendly Design Factor - In the case of Construction of Gucheon Eco-River in Geoge City - (친환경적 설계인자를 적용한 생태복원공사의 시공성 평가 - 거제시 구천천 생태하천 조성공사를 중심으로 -)

  • An, Byung-Chul
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.4
    • /
    • pp.99-114
    • /
    • 2013
  • In this study, constructability of ecologocal stream restoration process was evaluated and improved approaches for habitat were suggested. The study site is Gucheon River in Geoje city where conducted ecologocal restoration work within maintaining its flood control function. Application of ecological design factors and constructability in the process from planning to construction was analyzed and its results are as follows: In the process of planning and designing, it was focused more on the naturality of Gucheon River rather than the human convinience and ecological design factors were applied within the ecological capacity of the site. First, the indexes for constructability evaluation is selected. It was classified into three major categories as construction quality, design quality and construction administration system. Each index has details, so there are twenty sub indexes for contractibility evaluation. Second, the evaluation results shows that the index most in need of improvement was plumbing construction, followed by Stone construction and pavement construction. design concept was evaluated as appropriate in entire categories. Finally it is suggested that it can be improved in both process of design to enhance the technology and process of construction to enhance the quality management. The constructability of ecological stream needs adaptive management and it must be discussed with its designing which is at the stage before construction. Also it needs discussion with its designer constantly and feed-back process.