Browse > Article

A Study on Using PSM Policy for the Serious Accident Prevention of Construction  

정범모 (명지대학교 산업시스템공학부)
양광모 (명지대학교 산업시스템공학부)
강경식 (명지대학교 산업시스템공학부)
Publication Information
Journal of the Korea Safety Management & Science / v.4, no.4, 2002 , pp. 1-14 More about this Journal
Abstract
As domestic buildings have been large-scaled, diversified and high-rise, there have been a consistent demand for design, development of construction technology and accident prevention activity as well as quality enhancement. In spite of governmental and related institutions' efforts for reducing national losses which come from numerous accidents, there have been endless small and large accidents on the construction site and thus, it is urgent to conduct empirical researches in this area. Currently safety supervision system in construction industry has enforced harm and danger prevention planning system, however it merely stick to other existing materials. In addition, it is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM method. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries,' thereby strengthening there competitive edges. Boost of safety control system by PSM method will make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.
Keywords
Citations & Related Records
연도 인용수 순위
  • Reference
1 cccp, 'Guidelines for Auditing Process Safety Management System', 1989
2 http://www.koreasafety.com
3 OSHA, 'Process Safety Management of Highly Hazardous Chemical 129 CFR 1919, 119', 1990
4 '2001년 산업재해 통계' 노동부, 2002
5 김병석, 나승훈 (2002) '시스템 안전공학', 형설출판사
6 강인원, 김규정, 이영순, 김용수 '공정안전관리(PSM)제도의 효과분석', 한국산업안전 학회, 2001
7 http://www.mu49.co.kr
8 http://www.safety.or.kr
9 산업안전보건 법령집
10 '공정안전관리 (PSM)제도', 한국산업안전공단, 1998
11 '2002년 3/4분기 건설경기 전망' 한국건설산업연구원 . 대한건설협회, 2002
12 제무성외 (1999) '시스템 안전공학 개론', 신광문화사
13 안홍섭, 노민래, 이명구 '건설공사 유해위험방지계획서제도의 효과분석에 관한 연구', 한국산업안전학회, 2001
14 이송, 손기상, 최원일, 오태상, 채점식 '건설안전을 위한 P. S. M. 기법에 관한 연구', 한국산업안전학회, 2000
15 htt://www.kosha.or.kr