• Title/Summary/Keyword: construction plan

Search Result 3,313, Processing Time 0.025 seconds

A Study on the Building Use Control of Seoul in District Units Plan (서울시 지구단위계획의 운용에 관한 연구)

  • Shim, Jae-Heon;Lee, Jae-Kook
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.4 no.2
    • /
    • pp.26-34
    • /
    • 2004
  • Our country did not illustrate and reverse by a city planning law department construction Buddhist priest's robe dual setup the urban setting to be regulated, it came. The city planning law as the high position system of space planning mainly provides the use and a size of the land, the construction law the detail contents of site undergarment concrete location and the form back is provided and of course, regarding the structure which relates with the designation of concrete building use in him and the immediacy back. These two laws are come by a trade name complement and a function sharing role in order for the affirmative development of the city to become accomplished, being used. To necessity of District unit plan the general causal government employee all it is sympathizing, it relates it goes to extremes and with the maintenance of endurance environment and many portion with charge Sikkim also the fact that it is the criticism which relativy is negative in duty of administrative origination is fact in the people. But realization of plan hazard the execution of the public section which stands will be important, it will reach and the public section execution plan of the autonomous nine dimension for must be prepared. The next research that the individual globe plan and development actual condition actual proof and the research which it analyzes system is necessary with base, sees the general operation evaluation of Seoul District unit plan.

  • PDF

Management Method in the Education Facilities of the Construction Process through Value Engineering(VE) Case Study (VE 사례분석을 통한 교육시설 건축공사 단계별 관리방안)

  • Kim, Hag-Joo;Mun, Gwang-Bae;Go, Seong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.129-132
    • /
    • 2012
  • Value Engineering(VE) process is going to make a series of improvements for the effective construction project management or optimal proposal to improve quality, performance improvement, cost reduction and customer satisfaction. For making the quality model based on better than the architecture that is required in the VE, such a project promoting creative plan, functionality and constructability reflecting the materials and improved construction methods and building life cycle for reviewing the smooth progress of the construction projects may be necessary for management techniques. This study is to establish a management plan in the educational facilities construction process through education institution's recent orders completed by VE case study.

  • PDF

Improvement Plan of Mechanical System in Construction Industry Production Process (기계설비산업의 생산체계 선진화방안)

  • Park, Jong-Il;Park, Ryul
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.23 no.6
    • /
    • pp.470-476
    • /
    • 2011
  • The aim of this paper is improvement plan of mechanical field construct production system in Korea construction industry market. Recently Korea's construction production system is changing rapidly. While change, mechanical system construction field must prepare proper system for construction production system and later mechanical construction work will give order directly. Through this study the author will show the improved mechanical field construct production system and it can useful future construction industry production system in Korea.

Improvement Plan of Mechanical System in Construction Industry Production Process (기계설비산업의 생산체계 선진화방안)

  • Park, Jong-Il;Park, Ryul
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.1112-1118
    • /
    • 2009
  • The aim of this paper is improvement plan of mechanical field construct production system in Korea construction industry market. Recently Korea's construction production system is changing rapidly. While change, mechanical system construction field must prepare proper system for construction production system and later mechanical construction work will give order directly. Through this study the author will show the improved mechanical field construct production system and it can useful future construction industry production system in Korea.

  • PDF

The Collected data-based Air Pollutant Emission Prediction for construction equipment in Construction Sites (건설장비의 배출가스 데이터 기반 대기오염물질 배출량 예측 시스템)

  • Noh, Jaeyun;Kim, Yujin;Kim, Sumin;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.86-87
    • /
    • 2021
  • As non-road mobile pollutants such as construction equipment are emerging as the main cause of air pollutants emission, construction equipment regulations are gradually strengthening. Research was conducted by correcting the emission coefficient to calculate and predict air pollutant emissions of construction equipment, but it did not reflect site variables such as field and equipment conditions that affect actual emissions. This study derived an Artificial Neural Network emission prediction model based on the actual emission data of excavators and trucks measured at the site and proposed a platform to predict the emission of air pollutants at the site according to the working size and conditions. Through this, it is possible to establish an eco-friendly process plan using a model from the construction plan.

  • PDF

A Construction Plan of Hydrogen Fueling Stations on Express Highways Using Geographic Information System (지리정보시스템을 이용한 고속국도에서의 수소충전소 구축 방안)

  • Gim, Bongjin;Kook, Ji Hoon;Cho, Sang Min
    • Journal of Hydrogen and New Energy
    • /
    • v.25 no.3
    • /
    • pp.255-263
    • /
    • 2014
  • This paper deals with a construction plan of hydrogen fueling stations on express highways using geographic information system. We analyzed the existing hydrogen fueling stations and production facilities to construct the hydrogen supply system to satisfy the hydrogen demands. Also, we suggested the necessary number and locations of hydrogen fueling stations on express highways for operating fuel cell vehicles. As a result, we need to construct at least 6 hydrogen stations on express highways in 2020 and 14 hydrogen stations in 2025. In 2030, when fuel cell vehicles are expected to spread over the whole nation, 114 hydrogen stations are needed to construct on express highways. This study mainly utilized the information of distances between hydrogen production facilities and fueling stations. However, we need to analyze the other factors such as traffic and income data. Also, it is necessary to make a suitable construction plan of hydrogen fueling stations that should be constructed on each district using geographic information system.

Improvement plan for Function Definition using CAFAT in the Construction VE (건설 VE에서 CAFAT을 이용한 기능정의 개선방안)

  • Choi, Chang-Hoon;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.102-111
    • /
    • 2006
  • In the analysis of function, which is the core and early phase among the procedure of construction VE Job Plan, the accuracy of function definition directly connects to VE result. However, the method of defining function, which is currently used is not accurate and comprehended or is difficult to utilize it systematically. Also, there is not a clear definition about the function for selecting VE so that many difficulties occur in the organic connection between each of functions in the summarization of function after defining function. Therefore, this study cleared the definition of function and made up any counter measured problem occurred in FAST Diagram later on and suggested CAFAT(Combined Antithetic Function Analysis Technique) in order to induce better phase in functional analysis.

The Case Study on the Erection Construction Method for Soft Retractable Roof Structures (연성개폐 지붕구조물 Erection 시공법에 관한 사례 연구)

  • Park, Keum-Sung;Kim, Hyung-Do;Kwak, Myong-Keun
    • Journal of Korean Association for Spatial Structures
    • /
    • v.16 no.4
    • /
    • pp.101-108
    • /
    • 2016
  • Lifting plan in the large spacial structure is an important factor influencing the efficiency and economy of the construction process. The purpose of this study was deriving the requirements for lifting techniques as the basic research in the double spoke wheel roof structure construction. In the lift up erection method, management plan of the interference error in the column and outer-ring was needed that occur during lifting roof structure. In the bent erection method, material usage reduction plan was required by the structural design of the temporary bent. In the hybrid erection method, lifting plan was needed that minimizes weather condition and crane usage. All lifting techniques were required Value Engineering model for reduction of cost and construction period.

A Plan of Safety Management through Identifying Causes of Fall Fatal Accidents in Korean Construction Industry (발생 원인 규명을 통한 국내 건설 추락 사망사고의 안전관리 방안)

  • Ham, Jung-Bin;Cha, Yongwoon;Han, Sangwon;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.38-39
    • /
    • 2014
  • In order to reduce fatal accidents, a systematic safety management should be performed at a construction site. A lot of researches on direct causes of fatal accidents and indirect causes which affect the direct causes have been conducted for effective safety management. In the previous studies, these causes are considered separately because of the difficulty of recognition of indirect causes. It is also hard to measure the negative impact of these causes and notice their occurrence the perception of its problem. However, a study on identification of complicated relationship between these two types of causes is necessary since an accident occurs due to the chain reaction that indirect causes trigger the direct causes which lead to the fatal accidents. Therefore, this study proposes a safety management plan that considers indirect and direct causes of fatal accidents cases in the Korean construction industry. Then this paper suggests a plan of safety management by identifying major causes of the accidents.

  • PDF

Strategic Action Plan for Construction Knowledge Management (건설 지식의 전략적 계획과 활용)

  • Jung, Young-Soo;Kang, Seung-Hee;Lee, Kyoo-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.166-176
    • /
    • 2005
  • The purpose of this paper is to develop a framework for construction knowledge management. Three variables of proposed framework includes knowledge class, strategic business function, and engineering data form. Several different techniques for evaluating the variables are developed in order to develop a strategic action plan for engineering knowledge management systems. The proposed framework for an action plan will contribute to develop knowledge management systems related to strategic engineering functions for construction companies.