Browse > Article
http://dx.doi.org/10.6110/KJACR.2011.23.6.470

Improvement Plan of Mechanical System in Construction Industry Production Process  

Park, Jong-Il (Department of Building System Engineering, Dong-Eui University)
Park, Ryul (Department of Building System Engineering, Dong-Eui University)
Publication Information
Korean Journal of Air-Conditioning and Refrigeration Engineering / v.23, no.6, 2011 , pp. 470-476 More about this Journal
Abstract
The aim of this paper is improvement plan of mechanical field construct production system in Korea construction industry market. Recently Korea's construction production system is changing rapidly. While change, mechanical system construction field must prepare proper system for construction production system and later mechanical construction work will give order directly. Through this study the author will show the improved mechanical field construct production system and it can useful future construction industry production system in Korea.
Keywords
Construct production process; The law of basic construction industry law; Mechanical system;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Park, J. I. and Kim, S. H., 2003, A study on the laws of building service system construction, Journal of Air Conditioning and Refrigeration, Vol. 15, No. 1, pp. 67-68.
2 Park, J. I., 2004, A study on the definition of equipment service system construction, Journal of Dong-eui university industrial technology, Vol. 18, pp. 73-79.
3 Sohn, J. I., 2004, Research of mechanical system law establishment, Korea mechanical construction contractors association, pp. 35-43.
4 Moon, S. H., 2003, Building equipment system construction, Kimundang, pp. 15-42.
5 Park, J. I. and Kim, S. H., 2007, Building equipment system design, Sejinsa, pp 13-31.
6 Lee, Y. H. and Park, H. S., 2005, Architecture plumbing system, Sejinsa, pp. 20-30.