• 제목/요약/키워드: construction operation management

검색결과 1,050건 처리시간 0.03초

Attributes for Developing a Database for Construction Information Interface

  • Moon, Sungwoo;Cho, Kyeongsu
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.673-673
    • /
    • 2015
  • Earthwork is an operation that provides space for structures, and it takes up a large portion of the construction costs in a construction project. In large-scale earthwork, numerous types of construction equipment are used in the operation. The types of equipment should be selected based on the field conditions and the construction methods. These construction vehicles are constantly changing positions during the earthwork operation. Therefore, the equipment operators require effective communication to ensure the efficiency of the earthwork operation. All equipment operators should exchange information with the other equipment operators. Information should be exchanged continuously to support decision making and increase productivity during the earthwork operation at the construction site. This paper investigates the attributes required for an information interface between construction vehicles during an earthwork operation. This paper 1) discusses the importance of an information interface for construction vehicles in order to increase productivity during an earthwork operation, 2) analyses the types of attributes that need to be communicated between construction vehicles, and 3) provides a database that has been built for attribute control. The database built for the information interface between construction vehicles will enhance communication between vehicle operators. Table I shows the typical attributes that should be shared between the excavator operator and the dump truck operator. This information needs to be shared among the operators, as it helps them to plan the earthwork operation in a more efficient manner. A database has been developed to store this information in an entity relation diagram. A user-interface display environment is also developed to provide this information to the operators in the construction vehicles. The proposed interface can help exchange information effectively and facilitate a common understanding during the earthwork operation. For example, the vehicle operators will be aware of the planned volume, excavated volume, transportation time, and transportation numbers. As a part of this study, mobile devices, such as mobile phones and google glasses, will be used as hands-on communication tools.

  • PDF

SIMPLIFIED SIMULATION APPROACH TO MANAGING SCHEDULE-OVERRUN RISKS IN CONSTRUCTION OPERATIONS

  • Wah-Ho CHAN;Ming LU
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.929-934
    • /
    • 2005
  • The complex and dynamic job nature and the ever-changing working environment of construction projects inevitably present uncertainties to construction operations. Identification, evaluation and control of uncertainties constitute main elements of risk management and critical tasks of project management in construction. This paper is focused on application of a simplified discrete-event simulation approach in management of schedule-overrun risks, each being the combination of the occurrence probability of an uncertain interruptive factor and its potential consequence in terms of time delay. A case study observed from a concreting operation in Hong Kong is converted into a simulation model and analyzed with an in-house-developed simulation package for demonstrating how the proposed approach can be implemented to manage multiple schedule-overrun risks on construction projects.

  • PDF

건설 프로세스 경영의 경영효과 분석에 관한 연구 (A Study on the Management Effectiveness Analysis of Construction Process Management)

  • 김영섭;황욱선;김용수
    • 한국건설관리학회논문집
    • /
    • 제9권2호
    • /
    • pp.81-89
    • /
    • 2008
  • 본 연구는 프로세스 경영에 의한 건설업의 경영효과 분석을 목적으로 수행되었다. 즉 건설업 분야에서의 프로세스 경영에 대한 필요성과 지속적인 경영관리의 효율성 향상을 위해 수행되었다. 다음으로 본 연구의 수행을 위한 과정을 설명하면 다음과 같다. 첫째 프로세스경영에 대한 이론적인 개념을 정리하고, 둘째, 유사산업분야에서 기 개발된 프로세스경영 성숙도 모델을 건설업에 적용할 수 있도록 건설업 프로세스경영 성숙도 모델을 제시하였다. 셋째, 프로세스경영이 영향효과를 검토하기 위해 가설을 세우고, 설문조사 통하여 검증하였다. 상기와 같은 과정에 따라 도출한 결론을 요약하면 다음과 같다. 프로세스 IT 연계기술전략 실행에서는 유의적으로 분석되었으며, 자원관리체계에서는 비유의적으로 분석되었다.

건설 중기계 운영상의 안전관리 실태 및 개선방안 - 크레인, 지게차, 버킷굴삭기, 승강기, 펌프카를 중심으로 - (The Current Status and Improvement Scheme of Safety Management on the Heavy Construction Equipment Operation)

  • 강창희;신갑철;김상태;김용수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.397-400
    • /
    • 2002
  • 본 연구는 건설 중기계(크레인, 지게차 버킷굴삭기, 승강기, 펌프카)를 중심으로 안전관리의 실태를 조사하고 개선방안을 제시하고자 한다. 이를 위해 먼저 건설 중기계에 대한 국내 건설산업재해에 대하여 조사${\cdot}$분석하고 이를 바탕으로 재해원인을 분석한다. 다음으로 설문조사를 통하여 안전관리 실태를 조사${\cdot}$분석한 후 개선방안을 제시한다. 본 연구의 결과를 요약하면 다음과 같다. 1) 중기계의 안전관리 실태는 작업적인 측면에서는 안전모 미착용, 관리적인 측면에서는 작업수칙의 불이행, 그리고 인적인 측면에서는 작업전 사전준비 불충분이 중요한 문제점으로 나타났다. 2) 개선방안으로는 작업전 5분안전교육의 강화, 크레인 작업시 낙하물에 대한 안전조치강화, 그리고 작업전 충분한 사전준비가 필요하다.

  • PDF

Estimating the Physical Demand of Waterproofing Worker

  • Lim, Tae-Kyung;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.101-103
    • /
    • 2015
  • Scientific methods that measure the physical demand requirements of a construction operation have not been arrived at maturity in construction community. It is attributed to the difficulty involved in performing controlled experiments on the operation and its' volatile jobsite environment. This paper presents a method that measures the physical demand requirement of the waterproofing activity and verifies the differences between various operations (e.g., a primer painting and a polyurethane coating) consisting of the activity. Two hypotheses, which are involved in the operations, are summarized as follows: [Hypothesis 1] when one performs the same amount of work; the one's average heart rate required for the polyurethane coating operation is higher than that required for the primer painting operation. [Hypothesis 2] when one performs the same amount of work, the one's break time required for the polyurethane coating operation is longer than that required for the primer painting operation.

  • PDF

OBSERVATION ERROR OF TIME-LAPSED PHOTOS IN CONSTRUCTION OPERATION MONITORING

  • Jiwon Choi;Julian Kang
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1042-1047
    • /
    • 2005
  • A web-based camera (webcam) is expected to enhance construction operation monitoring. However, webcams are often installed outside a building because their mobility is limited by cable wiring, which makes it difficult to monitor construction operations inside the building. If a webcam is integrated with emerging wireless communication technologies, construction professionals may be able to monitor interior construction operations using webcams without getting network cables wired on a congested and dynamic construction job site. However, one may concern that wireless communication may not be fast enough to transport all webcam images seamlessly. This paper presents an investigation as to the observation error of webcam images when a limited amount of images are delivered.

  • PDF

Agent-based Lift-car Group Operation Optimization Model in High-rise Building Construction

  • Jung, Minhyuk;Park, Moonseo;Lee, Hyun-soo;Hyun, Hosang
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.221-225
    • /
    • 2015
  • To hoist construction workers to their working space is directly related to the productivity of building construction since hoisting tasks are carried out during the working time. In order to reduce hoisting time in the condition that the number of construction lift-cars is limited, various types of the lift-cars group operation plans such as zoning and sky-lobby have been applied. However, previous researches on them cannot be compared in the performance due to their methodological limitation, discrete-event simulation methods, and cannot be find better solution to increase the performance. Therefore, this research proposed the simulation-based optimization model combining the agent-based simulation method to the scatter search optimization methods. Using the proposed model, this paper carried out the comparison analysis on the performance of typical operation plans and also optimize an operation plans by controlling the service range of lift-cars, the size and number of service zones. In this case study, it is verified that better alternatives than typical operation plans can be exists and it is possible to increase the productivity of building construction.

  • PDF

Review of Construction Business Intelligence Research

  • Baek, Seungwon;Han, Seung Heon;Yun, Sungmin;Jung, Wooyong
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.371-380
    • /
    • 2020
  • With the 4th industrial revolution, many advanced information technologies are being applied to the area of construction engineering and project management. These applications are usually focusing on design, construction and operation stage and are producing many meaningful fruits. Even though these studies are very important for the development of the construction industry, this study insists that the other stage perspective such as construction business also should be emphasized. Because business phase has significant impacts on the success of a construction project as well as design, construction and operation phase. So, this study reviewed the intelligent-approach papers in planning and marketing, estimation and bid, contract and claim, and project financing fields. This study provides some insights such as values, difficulties, limitations and future directions of business intelligence application.

  • PDF

건설공사 안전관리 및 시공 업무의 중요도 분석에 관한 연구 (Analysis of Construction Safety Management and Execution Tasks for Performance Improvement)

  • 강상훈;김대영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.130-131
    • /
    • 2018
  • The main purpose of this study is to analyze the importance of the construction work of apartment buildings. The construction work operation was divided into five major tasks, which include: Schedule Control (P'1 - P5) Construction Management (C'1 - C'5), Environmental Management (E'1 - E'3), and Quality Management. Finally, this study derived major construction execution tasks through correlation between construction work and the original index and t-test.

  • PDF

건설공사 사고 데이터(CSI) 활용을 통한 건설안전제도(안전관리계획서)의 운영성과 분석 (Analysis of the Operation Performance of the Construction Safety System by Using Construction Accident Data)

  • 김성덕;조아영;이정석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.383-384
    • /
    • 2023
  • Using the CSI(Construction Safety Management Integrated Information) data, a comparative analysis was conducted by work type and construction cost according to whether the construction sites were subject to making a safety management plan or not. As a result, by type of work, the ratio of deaths in non-plan sites was high in mechanical facilities and earthworks, and the operation performance of the system was much higher in sites that were less than 5 billion won of construction cost.

  • PDF