• Title/Summary/Keyword: construction of landscape

Search Result 1,018, Processing Time 0.028 seconds

A study ion the administrative system of landscape construction during Chosun-Dynasty (조선시대 조경공사의 제도적 측면에 관한 연구)

  • 전영옥;양병이
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.25 no.2
    • /
    • pp.43-53
    • /
    • 1997
  • The purpose of this study is to investigate the administrative system of landscape construction during Chosun-Dynasty. This study is based on the analysis of historic documents including the Codes and the Chronicles published during Chosun-Dynasty. The landscape construction controlled by government during Chosun-Dynasty was mainly undertaken by the government office titled "Seon-Gong-Gam" undr the Ministry of Industry. There were two functions of the "Seon-Gong-Gam" : one was construction including building and landscape, the other was the supply of materials and technicians to the field of constructino work. The construction function was carried out through government office titled "Cha-Mun-Gam" was in charge of the construction works of inside Chang-Dog Palace, while "Five Units" classified by work were responsible for the works of outside Chand-Dog palace in Han-Yang. In view point of the activities and responsibilities of the above two divisions, : "Cha-Mun-Gam" and "Five Units", it is concluded that one of the functions of "Seon-Gong-Gam" was to construct and manage the royal gardens.

  • PDF

Urban Culture Construction in Modern Landscape Architecture;Take the Design of South Bank Linear Park in Meizhou City, Guangdong Province as an Example

  • Wugong, Deng;Jianzhong, Jia;Bingyue, Han
    • Proceedings of the Korean Institute of Landscape Architecture Conference
    • /
    • 2007.10b
    • /
    • pp.30-37
    • /
    • 2007
  • Modern cities are weak in traditional culture with the lack of characteristics and the problem of environmental deterioration. As the important carrier of urban culture, landscape architecture should be responsible for solving these problems. The urban need is paid much attention in the design of South Bank Linear Park in Meizhou city. Following the principle of inheriting and developing urban traditional culture, the design of the whole park is integrated with Hakka culture in Meizhou, which forms the landscape with local features and modern landscape architecture culture, and promotes the urban culture construction.

  • PDF

A Comparative Study of Species of Tree Applied to Scientific Name Questions of Engineer Landscape Architecture Examination and Landscape Planting Construction (조경기사 시험의 학명 문제와 조경식재공사에 적용되고 있는 수종의 비교 연구)

  • Jung, Yong-Jo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.47 no.2
    • /
    • pp.1-12
    • /
    • 2019
  • The purpose of this study is to compare and analyze how many species of trees presented with scientific names are on the written test for engineer landscape architecture, as their usage has increased in the landscape industry in recent years. The following is the result of comparing and analyzing the species of trees which are frequently used in landscape, planting construction, and the scientific name questions presented in the previous 6 years by year on the written test for engineer landscape architecture. First, the results of analyzing the examination question frequency by year in the landscape planting subject showed a gradually declining trend from 2014 after peaking at 56.6% in 2013. Second, 163 species of trees using scientific names were presented in questions on the written test for engineer landscape architecture over the previous 6 years and these included Betula platyphylla, Sophora japonica, Cercis chinensis, Taxus cuspidata. The number of species of trees used in landscape construction during the same period was 169 including Pinus densiflora, Chionanthus retusus, Cornus officinalis, Syringa dilatata. The result of interviews with landscape planting construction officials showed that when choosing the species of trees, they emphasize ecological characteristics, such as the ratio of trees to shrubs, flowers and autumn leaf characteristics, and also consider the morphological characteristics, landscape characteristics, economic feasibility, and the supply and demand situation. Third, it was found that 70 (42.9%) out of 163 species of trees presented with scientific names on the examination were not used in landscape planting construction and 76 (44.9%) out of 169 species were not used as material for questions. As for the scientific name questions, deciduous trees and evergreen shrubs accounted for the more questions, Evergreen and deciduous tree and shrubs were most common in landscape planting construction as well.

An Analysis of Influences on Partial Work Rates under the Whole Work Rates on the Landscape Constructions in the Ulsan Grand Park (울산대공원 조경공사의 각 세부공정이 전체공정율에 미치는 영향분석)

  • 성백진;이재근;최종희
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.31 no.6
    • /
    • pp.64-72
    • /
    • 2004
  • This study analyses influences on partial work rates under whole work rates on landscape constructions in Ulsan Grand Park. The schedule management is one of the factors that are very important to the process management of landscape construction. The time process of the whole construction is supposed to be affected by several kinds of work that organize the whole construction. First, this study divides the construction of Ulsan Grand Park into 10 kinds of works: earth work, rain and sanitary sewage water work, water-supplying work, planting work, paving work, water proofing work, fountain work, instituting work and temporary work. Then the time-process curves of all kinds of work are statistically compared to that of the whole construction. The trial methods of statistics are lineal regression, non-lineal regression, and principal analysis. In the result of the non-lineal regression, the rain and sanitary sewage water work, the water-supplying work and the earth work strongly affected the whole construction. The principal analysis results show that the whole construction is affected strongly by the water-supplying work, the rain and sanitary sewage water work and the earth work. However the lineal regression is shown to be senseless because of its high collinearity.

A Study on the Entry Strategies of Small and Medium Sized Landscape Contractors to Vietnam by Risk Analysis in Overseas Projects (해외사업 리스크 분석을 통한 중소 조경건설업체의 베트남 진출전략에 관한 연구)

  • Tae, Jongwook;Jeong, Daeyoung;Hwang, Joon;Chon, Jinhyung
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.6
    • /
    • pp.1-16
    • /
    • 2018
  • The decline in the construction industry has led to a decrease the profitability of small and medium-sized landscape contractors. To relieve this situation, small and medium-sized landscape contractors have continued to proactively find ways to enter global construction markets. However, many small and medium-sized landscape contractors face risks due to their lack of capacity and insufficient preparations to extend the business abroad. Thus, this study aims to analyze the current condition of the Vietnamese construction market and the related risk factors. It then suggests strategies to improve the small and medium-sized landscape contractors' competitiveness in that market. We investigated the business climate and analyzed risk factors. Finally, we developed expansion strategies and conducted in-depth interviews with six overseas construction professionals. The study results first showed that efforts to improve infrastructure and the increased demand for housing in Vietnam will lead to more opportunities for small and medium-sized landscape contractors entering the Vietnamese construction market. However, changes in the Vietnamese business climate may act as a variable. Second, we found that small and medium-sized landscape contractors' risk factors are mainly related to laws and regulations, government finance, market fluctuations, public administration system, minimum wage increases, financing and bonds, contracting, trees and materials, and design errors. Finally, small and medium-sized landscape contractors are required to consider the following when seeking to enter the Vietnamese construction market: short-term strategy and mid-to-long-term strategy. This study will be used as the basis for small and medium-sized landscape contractors to plan to enter the Vietnamese construction market and to contribute to the expansion of the global construction market in the landscape industry.

Analysis on Accuracy and Indigenity of Landscape Plants Species in Planting Design and Construction (식재설계 및 시공시 조경수종 사용에 있어서의 정확성과 자생성 분석)

    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.26 no.2
    • /
    • pp.251-258
    • /
    • 1998
  • The purposes of this study was to investigate accuracy and indigenity of landscape plant species in planting design and construction at housing complex and offer basic data for improving precision of planting construction. The scientific name of landscape plant species was described in planting drawings at only two sites among twelve survey sites. According to analysis on indigenity of plant species in planting drawings, it was found that the component ratio of foreign species was the highest and the component ratio of native species at public housing complex was the lowest. The component ratio of landscape plant species in planting construction was severely differed to that of planting drawings. Also the component ratio of cultivar was higher than that of planting drawings due to planting of sevveral cultivars for one species in planting drawings. In the result of accuracy analysis on landscape plant species in planting construction, it was found that mean ratio of inacccurate species was 33.2% at public housing complex, 29.6% at local company housing complex and 26.4% at nationwide company housing complex. It was found that several cultivars were planted for one species in planting drawings. The representative species which were planted by several cultivars were Camellia japonica, Rododendron spp., Prunus spp. and Magnolia spp. and so on. In order to promote the precision and speciality of planting design and construction, scientific and cultivar name of plants should be described in planting drawings.

  • PDF

Comparative Studies of Standard of Estimated Unit Manpower and Material of Landscape Architecture Construction in Korea and Japan (조경공사 표준품셈의 한·일간 비교 연구)

  • Yun, Ju-Cheul;Lee, Kwan-Hee
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.29 no.3
    • /
    • pp.154-158
    • /
    • 2011
  • This research was carried out to compare the standard of estimated unit power and material in landscape architecture construction between Korea and Japan. It has also been done to offer a practical and reasonable information to Korea landscape architecture industry. The research results are as follows. First, both Korea and Japan's standard of estimated unit power and material in landscape architecture construction are part of civil construction. Second, Korea's detailed type of construction is centered on plant's type and size while Japan's centered on architectural construction. Third, Korea's standard of estimated unit power and material are composed of workforce construction, mechanical construction and addition of soil. On the other hand, Japan's estimated unit power and material are composed of workforce construction, time of transportation, date of transportation. Fourth, the planting specification of Korea seems to be more in detail than that of Japan, Japan's showing a wider implication. Fifth, when comparing the information regarding standard of estimated unit power and material between Japan and Korea, transportation, independent stalking for plant, soil for landscape architecture is difference between the two countries. On the base of this research results, Korea's standard of estimated unit power and material in planning construction should be more elastic in its implication and independent standard of estimated unit power and material in landscape architecture construction. Also, examination of transportation, independent skating for plant and soil for landscape architecture should be done in order for better improvements.

Analysis of Students' Perception of Landscape Construction Education (조경시공과목 교육에 대한 학생들의 인식 분석)

  • Park, Jae-Young;Kwon, Jin-Wook
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.45 no.4
    • /
    • pp.92-103
    • /
    • 2017
  • As a professional occupation, landscape education focuses on fostering professional human resources and is one of the major axes of the landscape industry. In this study, a survey of landscape students on their learning and pedagogics was conducted with the aim to present basic information for the improvement of teaching on landscape construction. A total of 348 people answered 14 questions in the category of the impression of landscape construction classes included in the questionnaire. The results showed that the students found landscape construction classes academically important and recognized the necessity for completing these classes, but they were not satisfied with the learning environments and pedagogics used in these classes. They found what they learned not readily applicable to actual practice and saw these classes as part of their preparations for the landscape engineer qualification test. Their demands in relation to the classes included field practice-oriented teaching and participation in various programs for field practice, which highlights the necessity for human resource management-oriented classes that cover planning, design, construction, and management. Challenges in relation to field practice included the provision of environment, for example offering a variety of opportunities and improving treatment in practice. This study has significance in that it analyzed the views of students and discussed directions for future improvement since there is a lack of studies and discussions about education in the field of landscape construction. This study also has a limitation that only four-year universities were included in the study. Comprehensive studies including investigating junior college and graduate school curricula and case studies of landscape construction curricula overseas are needed in the future.

A Study on the Reinterpretation of ChonJu Palkyong for Improvement of Landscape Identity (경관정체성 향상을 위한 전주팔경의 해석에 관한 연구)

  • 신상섭;노재현
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.26 no.4
    • /
    • pp.25-35
    • /
    • 1999
  • This thesis is to newly understand the value and the meaning of Chonju Palkyong(全州八景) by the specific gravity in making a counter-proposal in other to improve the landscape identity of modern city and at the same time. I intended to group the grafting device for the preservation and regeneration of modern history cultural environment through the interpretation of landscape construction. The meaning system of Chonju Palkyong showed the symbolic system which a landscape construction, four directions and two places has and exhibited the landscape shape possessing a luxuriant local feature peculiar to Chonju, preserving visual bound language of a classical Palkyong. Especially, it implies the use of the substantial landscape experienced factor, the expressions about natural phenomena and the matter which has melted human living circumstances. The landscape construction and it's form show the system which forms the different time field, a far landscape and a mid distance landscape and a near landscape, etc., under the visual, psychological, scenic influenced area, preserving the feature of the similar and typical type of Sosang Palkyoung(瀟湘八景) which intended to seek the local reappearance of the famous site experienced type and natural matter which famous place and local conduct were combined. The object space of Chonju Palkyong area representing the nature of historical landscape cultural assets, pushed by the greater part of the development based theory, shows injured aspects, but needs to play a part to seek such a up-to-date successive plan as the reconstruction of the destroyed historical landscape area which motivated Palkyong, the establishment of useful area, the embodiment of the cultural identity of Palkyong area and the becoming of the educational cultural life space. The analysis of the landscape construction of Chonju Palkyong and the grouping of the modern successive plan which I considered in this thesis, will be able to become a fundamental data to carry out the preservation of historical landscape and the landscape plan in the city.

  • PDF

A Study on the Software Development to Automate the Calculation for the Landscape Architecture Construction Cost Estimation. (조경 공사 내역서 계산 자동화를 위한 소프트웨어 개발에 관한 연구)

  • 이규석;황국웅
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.20 no.2
    • /
    • pp.106-118
    • /
    • 1992
  • The landscape architecture construction cost estimation includes the repeated calculation and updating. Thus, it is time-consuming, and one of the jobs which needs to be automated first. In Korea, the IBM compatible personal computer(PC) is the most widely used one in the landscape architecture firms. However, the software for landscape architecture construction cost estimation is not being used in the PC environment. Therefore, the purpose of this study is to develop the software which can be used to automate the calculation for the landscape architecture construction cost estimation, and runs in the IBM compatible personal computers(PC). The clipper '88 summer is one of the DBMS software packages, and it has many commands and functions and functions which reduces program lines and makes the programing efficient, especially in the programing work whose total source code lines do not exceed over 10,000 lines. So, it was used in this study. The software developed in the this study was tested using the real data, and it was found that it can be efficiently used in the following jobs. They are: (1) to calculate exactly and rapidly. (2) to use resources repeatedly. (3) to print out the results. (4) to store data files for the future use. The software, as discussed in this paper, reduces the time and efforts to be spent in the calculation for the landscape architecture construction cost estimation compared with the traditional approach using the pocket calculator.

  • PDF