We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.
Journal of the Korean Professional Engineers Association
/
v.33
no.3
/
pp.30-34
/
2000
In recent years, disputes are on the increase that noise and vibration by construction equipments and blasting do damage to livestock farming families around construction sites in the construction of a road or a railway. Therefore, the following ways of improvement were presented in solving the existing problems of livestock disputes. $.$ To minimize the damage of livestock farming families by effect assessment of noise and vibration in the region expected to be damaged before the start of construction $.$ To maintain a thorough management system that can reduce noise and vibration during construction work $.$ To apply an adequate measurement method of noise and vibration taking field conditions into consideration
Globalization of business activities and the market is making intern ational movement of capital much freer. Therefore the introduction of global standard is inevitable. Each and every country has had its own standard which restrain free exchange and cause misunderstanding and conflict between countries. A country or a company which is not capable of meeting the global standard can not be accepted in the global market. Consequently, it will eventually be left behind. It is right to say that countries and companies should accept the global standard and abide by it to survive in the competitive global market. The following preface which was introduced in the international conference co_organised by BAC, FTCTC and Tsinghua University in May, 2004 shows a timely movement for the globalization of construction business. *B A C, Beijing Arbitration Commission *FTCTC, The FIDIC-Tsinghua-CNAEC Training Center *CNAEC, China National Association of Engineering Consultants Introduction, As arbitration becomes more and more popular in the ways of alternative disputes resolution all over the world, the BAC is devoted to promoting international arbitration in China. As FIDIC contracts constitute an accepted point of reference for international construction contract, the BAC, characteristic of construction projects, is willing to facilitate the FIDIC contracts as the referred construction contracts in China. In order to carry out its purposes, the BAC, together with FTCTC is going to convene for discussion of dispute resolution and arbitration of international construction projects. FIDIC, construction contract management guide, explains arbitration as the ultimate dispute resolution method. The detail of FIDIC will be suggested in this essay.
International conference on construction engineering and project management
/
2005.10a
/
pp.1256-1261
/
2005
The Professional Engineers Act (PE Act) of Korea reduces the competitiveness of PE, because of the lack of articles regarding guarantee of business scope and regarding continuous education. In foreign countries, after one passes the PE exam, he/she should register at the concerned government agency; in this way, a practical and systematic continuous professional development (CPD), along with management of work experience of PE, is carried out. In this thesis, the Professional Engineers Acts of different countries have been compared and analyzed in order to consolidate international competitiveness of Korean professional engineers. Also, the author of this thesis presented measures to solve the problems of the Korean PE Act.
KSCE Journal of Civil and Environmental Engineering Research
/
v.38
no.2
/
pp.327-335
/
2018
In order to calculate the quality management cost of construction work, the process must conform to relevant laws and regulations. In details, the cost of the various items such as quality test fee and quality control activity cost are required to be calculated. Regarding the quality management costs, the labor cost is applied to the quality examination fee and the calculation unit quantity in the construction quality management duties. The application of the unit price of the labor cost stipulates that Construction Association of Korea and Korea Engineering & Consulting Association apply the unit price which is surveyed and published. However, in the related laws and regulations, the standard of the quality manager and quality tester is not clear. This accounts for the confusion in the cost of construction management and the cost of labor. In the current law, the allocation standard of quality control personnel is specified according to the size of the construction, but the standard of placement of quality testers is not specified. At the construction site, there is no assignment criteria manpower for quality testers except quality managers, or very little work is being done. The quality control personnel conducts the quality test work to be carried out by the quality tester, and this carrying out heavy work. Therefore, it is difficult to maintain quality control activities. In this study, the labor cost of quality management expenses and the allocation criteria of quality managers and quality testers are established and presented for the purpose of securing the quality of the construction work and preventing the construction work. It is stipulated that the standards of the relevant laws and regulations, which are not clear, should be classified into quality control personnel and quality testers according to the size of the construction. Based on the unit price of Korea Engineering & Consulting Association, the personnel expenses of quality managers and quality testers are proposed to apply the unit price of engineer (professional engineer, specialist, advanced, intermediate, beginner) and skilled technicians (advanced, intermediate, beginner).
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.2
/
pp.269-276
/
2016
Recently the organizations related construction express frequently their opinion to MOLIT at the time of introducing the ICEC grade system and converting a system from responsibility supervision (RS) to construction management (CM). However there was no data to investigate the recognition of road construction engineers about the policy change. In this study, a questionnaire survey was conducted and analyzed twice to the road construction engineers on the CM and ICEC grading system at the Korea Institute of Construction Technology Education. The trend of response from the road construction engineers was verified through the survey separately from other institutions. This study analyzed the results and introduced a desirable policy proposal to promote an international competitiveness of the engineering industry.
Korean Journal of Construction Engineering and Management
/
v.19
no.3
/
pp.97-104
/
2018
This paper aims to evaluate the performance of S University's Premier Global Construction Engineer Training Program. The net impact of the program is evaluated through a quasi-experiment design approach. The competency level of an individual participant is compared with that of a non-participating expert with similar professional background. The results show that the training program contributed to a significant improvement in the professional competencies of the participating students. The competency level was regressed on the subjects of curriculum. The achievements are attributable to a group of subjects focused on the skills for project development such as PPP, feasibility study, and project financing. Another group of subjects found to have significantly contributed to the improved competencies can be categorized as subjects focused on nurturing global perspectives. The paper shows it is possible to quantify the contribution of the program and the results provide a set of information that can be useful in designing and operating similar programs.
Korean Journal of Construction Engineering and Management
/
v.7
no.3
s.31
/
pp.45-55
/
2006
This study aims need set of mind to construction manager built a theory logic conceive decision making system and principles designed to create the administrative procedures that a company needs to integrate management and environmental concerns into its daily business practices. Integrate considerations of risk reduction and wise resource management into daily business decision making environmental that includes performance and cost. Seek to make better Dynamic time solutions that promote competitiveness set of management mind provide business with tools and methodologies management participation, psychology, philosophy effects of resource flows. A last of understand use of the decision making element principal as a guideline for evaluating and ranking approaches. The result of this study are summarized as follows; (1) setting for approach decision making of manager police, (2) dynamic of time and management mind (3) a primary factor out environment to decision making (4) methodologies of set up system for management mind (5) expectation effect of management mind.
Korean Journal of Construction Engineering and Management
/
v.11
no.3
/
pp.23-32
/
2010
Construction Projects have mutual collaborative structures among various participants for common objectives. Most of all the design project which is the initial phase in the project is crucial for determining project overall quality and requires intimate and continuous relations between project participants. Thus, this study suggests Design Collaboration Management System for successful performing projects through cooperation among participants in the initial stage of projects. First, expert interviews were performed to figure out present conditions of design collaboration management and problems. The factor analysis was applied to draw owner's collaboration factors and engineer's collaboration factors. Based on those factors, this study suggests design cooperation management process which gives a framework for systematic management method. Through the process the design collaboration management system was developed which helps owner/designers/engineer's co-work. The System suggested from this study realizes systematic information management tool and through that it is expected to improve design product;'s quality, and further contribute the advancement of project.
Korean Journal of Construction Engineering and Management
/
v.20
no.2
/
pp.105-112
/
2019
As the Construction Technology Promotion Act was revised in 2015, the term of Supervision was removed and Construction Management was included instead. The consideration of Construction Management shall be based on the cost plus fee method specified in the Criteria for the Cost of Construction Technology Services of the Ministry of Land, Infrastructure and Transport. Nevertheless, it is based on the construction cost ratio in accordance with the Economy and Finance Ministry's Detailed Guidelines for Preparing the 2018 Budget Plan and Fund Management Plan (Manual for Business Type and Item). As a result, it has been expected that Construction Management consideration will be calculated according to a single government standard and that the Criteria will be applied reasonably. In addition, although the change in the Labor Standard Act has a significant effect on the working environment of the construction site, the nature of the construction site is not considered in this Act. Based on these problems, the study suggested that the government should apply a single standard after consultation with the relevant agencies when calculating the consideration for Construction management, that the scope of the Criteria for the Cost of Construction Technology Services should be clear, that the amount of input by the Construction Manager should be considered for the capability of engineers and the number of working days, and that construction characteristics should be considered when determining the number of working days and hours.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.