• Title/Summary/Keyword: construction management engineer

Search Result 140, Processing Time 0.026 seconds

A Study on Estimating the Contingency Cost of Small Construct Project (소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구)

  • 송진우;표영민;박성호;이상범
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

A Study on the Damage and Problem of Domestic Animals by Noise and Vibration at Construction Site (건설소음진동으로 인한 가축피해현황 및 문제요인고찰)

  • 박찬헌
    • Journal of the Korean Professional Engineers Association
    • /
    • v.33 no.3
    • /
    • pp.30-34
    • /
    • 2000
  • In recent years, disputes are on the increase that noise and vibration by construction equipments and blasting do damage to livestock farming families around construction sites in the construction of a road or a railway. Therefore, the following ways of improvement were presented in solving the existing problems of livestock disputes. $.$ To minimize the damage of livestock farming families by effect assessment of noise and vibration in the region expected to be damaged before the start of construction $.$ To maintain a thorough management system that can reduce noise and vibration during construction work $.$ To apply an adequate measurement method of noise and vibration taking field conditions into consideration

  • PDF

The Dispute Resolution Method on The FIDIC Form of Construction Projects (건설 사업에서 FIDIC 규정의 분쟁해결 방법)

  • Lee Moo-Jong
    • Journal of Arbitration Studies
    • /
    • v.16 no.2
    • /
    • pp.239-264
    • /
    • 2006
  • Globalization of business activities and the market is making intern ational movement of capital much freer. Therefore the introduction of global standard is inevitable. Each and every country has had its own standard which restrain free exchange and cause misunderstanding and conflict between countries. A country or a company which is not capable of meeting the global standard can not be accepted in the global market. Consequently, it will eventually be left behind. It is right to say that countries and companies should accept the global standard and abide by it to survive in the competitive global market. The following preface which was introduced in the international conference co_organised by BAC, FTCTC and Tsinghua University in May, 2004 shows a timely movement for the globalization of construction business. *B A C, Beijing Arbitration Commission *FTCTC, The FIDIC-Tsinghua-CNAEC Training Center *CNAEC, China National Association of Engineering Consultants Introduction, As arbitration becomes more and more popular in the ways of alternative disputes resolution all over the world, the BAC is devoted to promoting international arbitration in China. As FIDIC contracts constitute an accepted point of reference for international construction contract, the BAC, characteristic of construction projects, is willing to facilitate the FIDIC contracts as the referred construction contracts in China. In order to carry out its purposes, the BAC, together with FTCTC is going to convene for discussion of dispute resolution and arbitration of international construction projects. FIDIC, construction contract management guide, explains arbitration as the ultimate dispute resolution method. The detail of FIDIC will be suggested in this essay.

  • PDF

A STUDY ON THE COMPARATIVE ANALYSIS OF THE PROFESSIONAL ENGINEERS ACT OF DIFFERENT COUNTRIES

  • Kihyoung Park;Chansik Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1256-1261
    • /
    • 2005
  • The Professional Engineers Act (PE Act) of Korea reduces the competitiveness of PE, because of the lack of articles regarding guarantee of business scope and regarding continuous education. In foreign countries, after one passes the PE exam, he/she should register at the concerned government agency; in this way, a practical and systematic continuous professional development (CPD), along with management of work experience of PE, is carried out. In this thesis, the Professional Engineers Acts of different countries have been compared and analyzed in order to consolidate international competitiveness of Korean professional engineers. Also, the author of this thesis presented measures to solve the problems of the Korean PE Act.

  • PDF

Improvement of Personnel Cost and Placement Scale of Quality Manager for Construction (건설공사 품질관리자의 인건비 및 배치규모 개선)

  • Lee, Chang-Hyo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.2
    • /
    • pp.327-335
    • /
    • 2018
  • In order to calculate the quality management cost of construction work, the process must conform to relevant laws and regulations. In details, the cost of the various items such as quality test fee and quality control activity cost are required to be calculated. Regarding the quality management costs, the labor cost is applied to the quality examination fee and the calculation unit quantity in the construction quality management duties. The application of the unit price of the labor cost stipulates that Construction Association of Korea and Korea Engineering & Consulting Association apply the unit price which is surveyed and published. However, in the related laws and regulations, the standard of the quality manager and quality tester is not clear. This accounts for the confusion in the cost of construction management and the cost of labor. In the current law, the allocation standard of quality control personnel is specified according to the size of the construction, but the standard of placement of quality testers is not specified. At the construction site, there is no assignment criteria manpower for quality testers except quality managers, or very little work is being done. The quality control personnel conducts the quality test work to be carried out by the quality tester, and this carrying out heavy work. Therefore, it is difficult to maintain quality control activities. In this study, the labor cost of quality management expenses and the allocation criteria of quality managers and quality testers are established and presented for the purpose of securing the quality of the construction work and preventing the construction work. It is stipulated that the standards of the relevant laws and regulations, which are not clear, should be classified into quality control personnel and quality testers according to the size of the construction. Based on the unit price of Korea Engineering & Consulting Association, the personnel expenses of quality managers and quality testers are proposed to apply the unit price of engineer (professional engineer, specialist, advanced, intermediate, beginner) and skilled technicians (advanced, intermediate, beginner).

An Analysis of Perceptions of Road Construction Engineers on ICEC Framework at the time of System Transition from Responsibility Supervision to Construction Management (III) - Main Focus of Application for CM & ICEC - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(III) - CM과 역량지수 적용을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.269-276
    • /
    • 2016
  • Recently the organizations related construction express frequently their opinion to MOLIT at the time of introducing the ICEC grade system and converting a system from responsibility supervision (RS) to construction management (CM). However there was no data to investigate the recognition of road construction engineers about the policy change. In this study, a questionnaire survey was conducted and analyzed twice to the road construction engineers on the CM and ICEC grading system at the Korea Institute of Construction Technology Education. The trend of response from the road construction engineers was verified through the survey separately from other institutions. This study analyzed the results and introduced a desirable policy proposal to promote an international competitiveness of the engineering industry.

Performance Evaluation of Premier Global Construction Engineer Training Program (글로벌 건설 엔지니어링 고급인력 양성사업의 성과평가)

  • Park, Hyeon;Park, Inseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.97-104
    • /
    • 2018
  • This paper aims to evaluate the performance of S University's Premier Global Construction Engineer Training Program. The net impact of the program is evaluated through a quasi-experiment design approach. The competency level of an individual participant is compared with that of a non-participating expert with similar professional background. The results show that the training program contributed to a significant improvement in the professional competencies of the participating students. The competency level was regressed on the subjects of curriculum. The achievements are attributable to a group of subjects focused on the skills for project development such as PPP, feasibility study, and project financing. Another group of subjects found to have significantly contributed to the improved competencies can be categorized as subjects focused on nurturing global perspectives. The paper shows it is possible to quantify the contribution of the program and the results provide a set of information that can be useful in designing and operating similar programs.

Build up management mind of the construction expert engineer (건설전문기술자의 경영마인드 정립에 관한 연구)

  • Chun, Jin-Ku;Kim, Byeong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.45-55
    • /
    • 2006
  • This study aims need set of mind to construction manager built a theory logic conceive decision making system and principles designed to create the administrative procedures that a company needs to integrate management and environmental concerns into its daily business practices. Integrate considerations of risk reduction and wise resource management into daily business decision making environmental that includes performance and cost. Seek to make better Dynamic time solutions that promote competitiveness set of management mind provide business with tools and methodologies management participation, psychology, philosophy effects of resource flows. A last of understand use of the decision making element principal as a guideline for evaluating and ranking approaches. The result of this study are summarized as follows; (1) setting for approach decision making of manager police, (2) dynamic of time and management mind (3) a primary factor out environment to decision making (4) methodologies of set up system for management mind (5) expectation effect of management mind.

Development of Design Collaboration Management System for Multiple Participants in Design Projects (설계프로젝트 참여자간 협업지원을 위한 설계협업관리 시스템 개발)

  • Lee, Jee-Hee;Yi, June-Seong;Shin, Seung-Woo;Park, Kyung-Rog;Lim, Ji-Youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.23-32
    • /
    • 2010
  • Construction Projects have mutual collaborative structures among various participants for common objectives. Most of all the design project which is the initial phase in the project is crucial for determining project overall quality and requires intimate and continuous relations between project participants. Thus, this study suggests Design Collaboration Management System for successful performing projects through cooperation among participants in the initial stage of projects. First, expert interviews were performed to figure out present conditions of design collaboration management and problems. The factor analysis was applied to draw owner's collaboration factors and engineer's collaboration factors. Based on those factors, this study suggests design cooperation management process which gives a framework for systematic management method. Through the process the design collaboration management system was developed which helps owner/designers/engineer's co-work. The System suggested from this study realizes systematic information management tool and through that it is expected to improve design product;'s quality, and further contribute the advancement of project.

Improvement of CM Fee Estimation Criteria for Efficient CM Service (건설사업관리업무 효율화를 위한 대가 산출기준 개선방향)

  • Cho, Youngjun;Sung, Youngmo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.105-112
    • /
    • 2019
  • As the Construction Technology Promotion Act was revised in 2015, the term of Supervision was removed and Construction Management was included instead. The consideration of Construction Management shall be based on the cost plus fee method specified in the Criteria for the Cost of Construction Technology Services of the Ministry of Land, Infrastructure and Transport. Nevertheless, it is based on the construction cost ratio in accordance with the Economy and Finance Ministry's Detailed Guidelines for Preparing the 2018 Budget Plan and Fund Management Plan (Manual for Business Type and Item). As a result, it has been expected that Construction Management consideration will be calculated according to a single government standard and that the Criteria will be applied reasonably. In addition, although the change in the Labor Standard Act has a significant effect on the working environment of the construction site, the nature of the construction site is not considered in this Act. Based on these problems, the study suggested that the government should apply a single standard after consultation with the relevant agencies when calculating the consideration for Construction management, that the scope of the Criteria for the Cost of Construction Technology Services should be clear, that the amount of input by the Construction Manager should be considered for the capability of engineers and the number of working days, and that construction characteristics should be considered when determining the number of working days and hours.