• 제목/요약/키워드: construction management Index

Search Result 409, Processing Time 0.028 seconds

A Basic Study for Developing the Construction Cost Index by Directly Surveying the Cost Input Structure in Korea - Focused on Highway Construction Projects - (원가투입구조의 직접 조사에 의한 국내 건설공사비지수 개발을 위한 기초연구 - 도로시설물 중심으로 -)

  • Kim, Woo-Young;Yi, June-Seong;Lee, Young-Hwan;Lee, Bok-Nam;Kim, Yoon-Joo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.53-61
    • /
    • 2006
  • Korean Government started to publish Korean CCI(Construction Cost Index) again at February 2004 since CAK(Construction Association of Korea) stopped publishing it 1994. CCI is developed using the verified statistical data, that is, input-output table and producer price index by Korean Bank and labor unit cost by CAK. Though the method is available as it uses the verified statistical data, there is a limitation to reflect the characteristics of construction. For overcoming this limitation, this study suggests CCI development method investigating the input structure of labor and material cost for each type of construction project and applying the cost variations of the items.

A Study on Development of Cost Index Model for Military Facilities Construction (군 시설공사의 공사비지수 개발에 관한 연구)

  • Park Jong-Won;Son Bo-Sik;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.256-260
    • /
    • 2004
  • As a large portion of defence budget are alloted for military facility construction, reasonable budget estimation in the planning stage has been officers' main concerns. However the proper estimation of construction cost is difficult to be carried out due to the absence of systematic criteria. To improve the budget estimation for military facility construction, this study proposes a cost index model which can convert historical cost to current cost. Thus the developed cost index would enhance effectiveness of budget estimation process 3nd support reasonable decision making. This cost index model is developed by analyzing historical cost data with statistical methodology The study is executed by following process. First, factors which affect construction cost for the most are selected by analyzing historical cost data. second, the selected factors are categorized material cost, labor cost and equipment cost, and weights of those factors are calculated by dividing the cost of each factor by total item costs. Last, cost index is developed by using weighted average method.

  • PDF

Development of Fairness Evaluation Index for the Construction Industry (건설산업의 공정성 평가지수 개발)

  • Lee, Chijoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.16-27
    • /
    • 2022
  • This study analyzed both the legal system regarding fair trade and the types of unfair trade in the construction industry. Then, it derived the factors with which to evaluate the level of fairness. These factors were classified by each type of participant in the construction industry, such as general contractors and subcontractors, and each construction stage, such as bidding, contracting, and construction. The perceived fairness level of factors was analyzed using a survey of 238 employees of general contractors and subcontractors. Next, the study developed a fairness index for the construction industry. The index showed that subcontractors perceived the level of fairness more negatively than general contractors, but both perceived the construction stage of the industry as having the lowest level of fairness. General contractors perceived the bidding and contracting stages as having the highest fairness levels, and subcontractors perceived the contracting stage as having the highest level of fairness. The developed fairness index identified the evaluation factors that need improvement and the fairness level perceived by each type of participant at each stage of construction. The results of this study can contribute to establishing measures that improve the level of fairness in the construction industry.

Improved Model for Index of Construction Engineer's Competency Evaluation System in Domestic Construction Management (국내 건설사업관리 기술인력 역량평가 개선모델(I2CEC))

  • Kang, Seongmi;Cha, Minsu;Lee, Woojae;Ji, Woojong;Cho, Hunhee;Yoo, Wisung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.47-58
    • /
    • 2020
  • The ICEC (Index of Construction Engineer's Competency) quantifies the competence of construction engineers using such parameters as experience, education, and qualifications and assigns four technical grades (expert, advanced, intermediate, and beginners) to construction engineers according to their scores for the efficient management and loading of technical personnel. However, as of 2020, the seventh year since its implementation, ICEC has shown many problems in its application, unlike its intended purpose. So institutional supplementation is required to provide improvement measures that can cope with the changing labor market environment and complement the current ICEC. Therefore, this study examined the current status of the career management system after the introduction of the ICEC, suggested a career index proportional to the competence of construction engineers from the beginner to the expert level, and developed an effective capability evaluation model I2CEC. The improved model presented in this study provides a means to comprehensively judge the performance, experience, and the professional work abilities of construction management engineers. Furthermore, the results of this study are expected to contribute to the development of efficient manpower and career management systems for enhancing the competitiveness of the domestic construction industry.

A Study on the Statistical Continuity of Electrical Construction Cost Index Applied Chain Method (전기공사비지수의 산정방식 변경에 따른 통계연속성 실증분석 연구)

  • Park, Houng-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.46-53
    • /
    • 2015
  • Electrical construction cost index is composed of the cost of albor and material. The producer price index is used to the cost of material. The Bank of Korea restructured the formation method and the basic period of the producer price index in 2013. Because fixed-weighted method can't faithfully reflect industrial structure changes. The weighted value and price index of fixed-weighted method is fixed on the basicp eriod. Electrical construction cost index is changed from fixed-weighted method to chain-weighted method in september 2014, because of these on the need. But the change of organization in formation method changes the weighted value. So there is the need of analysis about the statistical continuity of electrical construction cost index. This study is focused on the time series analysis between fixed-weighted and chain-weighted electrical construction cost index. We uses unit root test, cointegration test, regression analysis of long and short term equation, fitness for the estimation of static forecast as time series analysis. We verify that chain-weighted electrical construction cost index can be replaced to fixed-weighted construction cost index accounting analyses result. So users of it recognize that chain-weighted electrical construction cost index has statistical continuity.

Delays and its Analysis: Indian Residential Construction Projects

  • Metha, Rakesh L.;Gaikwad, Suraj V.
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.4
    • /
    • pp.20-28
    • /
    • 2017
  • In almost every construction project, delay is an inevitable yet controllable phenomenon. The Indian construction industry encounters an enormous amount of delays in projects. Delay affects both time and money in the forms of schedule and cost overruns, respectively. Due to impressive and dynamic growth in the Indian construction sector, planned efforts are essential to limit these undesirable delays. On account of the surge in the rate of residential building construction, the task of identification and analysis of the delays in residential projects in India has been attempted by the authors. A questionnaire survey was conducted involving 100 stakeholders. Further analysis included an Importance Index to rank the identified delays, Principle Component Analysis for advanced statistical analysis, and Correlation Analysis to check the extent of agreement amongst stakeholders. Conclusions drawn with reference to the analysed data eventually reflected finance-related issues, as well as labour related problems as the dominating causes of delays. The aim of the research is to provide insight to the construction stakeholders and researchers, on an international scale, with the obtained results.

On the Standardization of Management System for Improving Reliability in Construction Industry (건설 분야 신뢰성 향상을 위한 경영표준 운영 방안)

  • Kim Jong-Gurl;Park Yong-Soo
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.253-258
    • /
    • 2004
  • Domestic construction industry (including plant engineering industry) faces severe competition with world-wide leading companies under WTO (World Trade Organization) system. To survive in this competition, domestic construction company should establish and operate standardization system efficiently. In this paper, check list is presented to prepare the efficient reliability management system in domestic construction. And then, the check list is applied in MIR(Maturity Index on Reliability) estimation item to estimate reliability management level of company quantitatively.

  • PDF

A Study of Improvement on Accident Rate Index of Construction Industry (건설업 산업재해발생율 평가지표 개선방안)

  • Lee, Miyoung;Oh, Sewook;Lim, Sejong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.108-119
    • /
    • 2016
  • Since the introduction of the converted accident rate in Pre-Qualification(PQ) process in 1992, the safety evaluation system has contributed to a reduction of construction accidents and development of the safety management system in public construction projects. As the comprehensive evaluation method the government plans to introduce includes the indicators 'accident rate' and 'death rate per 10,000 workers', the influences on the safety evaluation in the bidding process would be broader in public sector construction projects. However, the current safety evaluation system is operated by different estimating standards in the bidding process. At this point, a study of improvement on the safety evaluation index is required to review its current conditions and to propose its efficient operating method. Therefore, the purpose of this study is to analyze problems of the current safety evaluation system through the questionnaire survey on the qualified workers in construction safety management and to propose an improvement plan for the problems noticed. Our results suggest the standards of the unified process for the safety evaluation index, the size of construction firms needed for accident rate estimation, and the improvement plan for unreported accidents. The proposed improvement plan enables the reasonable estimation and efficient operation of the safety evaluation index, and further, it would contribute to reducing construction accidents through the activation of voluntary safety management by construction firms.

PROGRAMMATIC AND PROJECT-LEVEL RISKS: ESTABLISHING A RISK MANAGEMENT PROCESS FOR MIDDLE EAST PLANT PROJECTS

  • G. Edward Gibson Jr.;John Walewski;SangBum Kim;Clayton Ingam;Hamid Hajian
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1000-1014
    • /
    • 2009
  • Research sponsored by the Korean Government investigated the establishment of a risk management process by Korean contractors involved with plant projects in the Middle East. This research effort builds upon the work completed by the Construction Industry Institute (CII), called the International Project Risk Assessment (IPRA) tool and method, and also explored how CII's Project Definition Rating Index (PDRI) could be incorporated to improve project planning by addressing risks and scope development issues. Specific findings and recommendations were developed including the creation of the Contractor Critical Areas of Concern (CCAC) risk screening tool for Korean contractors pursuing Middle East oil and gas projects.

  • PDF

A Study for Verification of the Performance Index Model of EVMS in Credible Interval (신뢰구간상에서 EVMS 성과지수모델의 검정에 관한 연구)

  • Kang Byung-Wook;Lee Young-Dai;Park Hyuk;Chun Yong-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.478-481
    • /
    • 2002
  • In these days, Cost and Scheduling was managed effectively because of introduction of EVMS to construction project. However the EVMS is appropriate methods to advanced country, so it is difficult to apply into domestic construction project. in this paper weighted value n, m was used of compositive index(CI) to forecast Estimate At Completion (EAC) using statistical analysis in credible interval the objective of this paper is to verify compositive index(CI) and to forecast Estimate At Completion (EAC).

  • PDF