1 |
Ministry Of Statistics and Programme Implementation, "Annual Report 2016-17", < http://www.mospi.gov.in>, 2017.
|
2 |
Confederation of Indian Industry, "Make in India and the Potential for Job Creation", , 2015.
|
3 |
M. E. Abd El-Razek, H. A. Bassioni, and A. M. Mobarak, "Causes of Delay in Building Construction Projects in Egypt", Journal of Construction Engineering and Management, vol.134, no. 11, pp. 831-841, 2008.
DOI
|
4 |
A. A. Aibinu, and H. A. Odeyinka, "Construction Delays and Their Causative Factors in Nigeria", Journal of Construction Engineering and Management, vol.132, no. 7, pp. 667-677, 2006.
DOI
|
5 |
A. A. Aibinu, and G. O. Jagboro, "The effects of construction delays on project delivery in Nigerian construction industry", International Journal of Project Management, vol.20, no. 8, pp. 593-599, 2002.
DOI
|
6 |
M. I. Al-Khalil, and M. A. Al-Ghafly, "Important causes of delay in public utility projects in Saudi Arabia", Construction Management and Economics, vol.17, no. 5, pp. 647-655, 1999.
DOI
|
7 |
A. Al‐Kharashi, and M. Skitmore, "Causes of delays in Saudi Arabian public sector construction projects", Construction Management and Economics, vol.27, no. 1, pp. 3-23, 2009
DOI
|
8 |
D. Arditi, G. T. Akan, and S. Gurdamar, "Reasons for delays in public projects in Turkey", Construction Management and Economics, vol.3, no. 2, pp. 171-181, 1985
DOI
|
9 |
S. A. Assaf, and S. Al-Hejji, "Causes of delay in large construction projects", International Journal of Project Management, vol.24, no. 4, pp. 349-357, 2006
DOI
|
10 |
S. A. Assaf, M. Al-Khalil, and M. Al-Hazmi, "Causes of Delay in Large Building Construction Projects", Journal of Management in Engineering, vol.11, no. 2, pp. 45-50, 1995
DOI
|
11 |
H. Doloi, "Analysing the novated design and construct contract from the client's, design team's and contractor's perspectives", Construction Management and Economics, vol.26, no. 11, pp. 1181- 1196, 2008
DOI
|
12 |
H. Doloi, "Analysis of pre‐qualification criteria in contractor selection and their impacts on project success", Construction Management and Economics, vol.27, no. 12, pp. 1245-1263, 2009
DOI
|
13 |
H. Doloi, A. Sawhney, K. C. Iyer, and S. Rentala, "Analysing factors affecting delays in Indian construction projects", International Journal of Project Management, vol.30, no. 4, pp. 479-489, 2012
DOI
|
14 |
A. S. Faridi, and S. M. El‐Sayegh, "Significant factors causing delay in the UAE construction industry", Construction Management and Economics, vol.24, no. 11, pp. 1167-1176, 2006
DOI
|
15 |
A. Field, "Discovering statistics using SPSS", 3rd ed., London: SAGE Publications Ltd., 2009
|
16 |
K. C. Iyer, and K. N. Jha, "Factors affecting cost performance: evidence from Indian construction projects", International Journal of Project Management, vol.23, no. 4, pp. 283-295, 2005
DOI
|
17 |
H. F. Kaiser, "An index of factorial simplicity", Psychometrika, vol.39, no. 1, pp. 31-36, 1974
DOI
|
18 |
M. M. Kumaraswamy, and D. W. M. Chan, "Contributors to construction delays", Construction Management and Economics, vol.16, no. 1, pp. 17-29, 1998
DOI
|
19 |
N. R. Mansfield, O. O. Ugwu, and T. Doran, "Causes of delay and cost overruns in Nigerian construction projects", International Journal of Project Management, vol. 12, no. 4, pp. 254-260, 1994.
DOI
|
20 |
T. Y. Lo, W. H. Fung, and C. F. Tung, "Construction Delays in Hong Kong Civil Engineering Projects", Journal of Construction Engineering and Management, vol. 132, no. 6, pp. 636-649, 2006
DOI
|
21 |
A. M. Odeh, and H. T. Battaineh, "Causes of construction delay: traditional contracts", International Journal of Project Management, vol. 20, no. 1, pp. 67-73, 2002.
DOI
|
22 |
Y. A. Olawale, and M. Sun, "Cost and time control of construction projects: inhibiting factors and mitigating measures in practice", Construction Management and Economics, vol. 28, no. 5, pp. 509- 526, 2010.
DOI
|
23 |
M. Sambasivan, and Y. W. Soon, "Causes and effects of delays in Malaysian construction industry", International Journal of Project Management, vol. 25, no. 5, pp. 517-526, 2007.
DOI
|
24 |
X. Zhang, "Concessionaire's Financial Capability in Developing Build-Operate-Transfer Type Infrastructure Projects", Journal of Construction Engineering and Management, vol. 131, no. 10, pp. 1054-1064.
DOI
|