1 |
Lee, Ju-Yeong. (2010). "The Introduction of Chainweighed producer price index and organic Task". Quarterly national accounts review, 43. pp. 74-102.
|
2 |
Lee, Jae-Seong. (2012). "A study on the calculation method of the apartment house construction cost index using the chain index". Master thesis Dong-A University.
|
3 |
Moon, Kwon-Soon. (2007). "A Study of Chained inedex for Monthly Data", The Korean Journal of Statistics, 12(1). pp.122-151. Korea National Statistical Office.
|
4 |
Park, Sung-Chul, Koo, Kyo-Jin, Hyun, and Chang-Taek, (2006). "Development of Quantity based Base Period Price Index(QBPPI) to calculate Construction Cost Index, The Korean Journal of Construction Engineering and Management, KICEM, 7(5). pp. 77-84.
|
5 |
Park, You-Kwon. (2007). "A Study on the Chain-Weighed Method of Industrial Production Index:Focused on the Estimation Method of Weights". Master thesis Hannam University.
|
6 |
Park, Houng-Hee, Choi Seung-Dong, Hyun, So-Young, Park, and Min-Young. (2014). "Development of Electrical Construction Cost Index Applied Chain-Weighted Method", The Korean Journal of Construction Engineering and Management , KICEM, 15(5). pp. 49-61.
DOI
|
7 |
Park, Houng-Hee, Kim, and Mi-Ri. (2014). "A Study on Developing the Business Index of Electrical Construction Business", The Korean Journal of Construction Engineering and Management, KICEM, 15(4), pp. 107-119.
DOI
ScienceOn
|
8 |
Ryu, Deok-Hyeon, and Park, Cheol-Beom. (2011). "A Study on the Organic Method of Chain-weighed producer price index". Quarterly national accounts review, 1. pp. 1-28.
|
9 |
The Bank of Korea. (2009). "The Introduction of Chainweighed GDP".
|
10 |
The Bank of Korea. (2010). "Korean System of National Accounts : Concepts, Sources and Methods".
|