• Title/Summary/Keyword: construction management(CM)

Search Result 440, Processing Time 0.026 seconds

Policy Plans for promoting the Construction Management in Korea (${\cdot}$${\cdot}$학 측면에서의 CM 활성화 정책과제)

  • Lee Pil-Won;Choi Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.563-566
    • /
    • 2002
  • This paper proposes the methods to promote the Construction Management (CM) in Korea from the perspectives of government, academia, and industry. Recent seminar reports and research documents were referred to provide important sources for this work added by years of author's own experience in construction industry. First, the expected trend of various CM forms over time was identified by referencing the needs assessment results accomplished by the other researchers to provide a general sense of the way the CM is expected to evolve. Then, the 16 detailed ways of promoting the CM in Korea was proposed and explained.

  • PDF

A Study on the status and improvement of construction management through the Accomplishment instance DeaHakRo Complex cultural space (대학로 복합문화공간 수행사례를 통한 건설사업관리 향후 발전 방향에 관한 연구)

  • Moon, Youn-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.419-423
    • /
    • 2008
  • The necessity of specialized and systematic management has been a tendency to accomplish the goal of business efficiently according the trend of construction industry has become bigger, complicated and specialized as well as Placing an order of CM(Construction Management) Service has been Increased because it made viable and positive effect. Institutional plan is necessary CM application from planning, realistic estimation of CM service charge, converting understanding among paticipants for the business and inducing specialization through certifyizing CM qualification to develop CM. But, it makes some realistic and unexpected pro41ems in the middle of step-by-step CM management for doing its business. So we need to consider a measure. This study suggests problems in practical a)fairs and improved idea that it summarized each stage of a bid for CM, planning, construction contract. It shows direction to take root successfully and develop.

  • PDF

Study on the Analysis of Domestic Construction Management Orders

  • Park, Jongsoon;Lee, Keunwon;Ann, Kyunghwan;Shin, Changhyun;Cho, Jaeho;Chun, Jaeyoul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.387-391
    • /
    • 2015
  • Currently, there is insufficient research on the construction management performance since the CM system was introduced in Korea. For successful completion of construction projects, active use of construction mangers on projects is necessary by introducing construction management to the projects. In view of this, this study analyzed the annual CM performance from 1996 to 2013 but for the past 5 years from 2009 to 2013, a detailed analysis was carried out. For different sectors, CM performances were divided into public and private sectors, for project types, construction, civil and others, for project phases, pre-design, design, construction and post-construction phases, for contract types, sole and joint contract types, for project scale, the amount of the projects was taken into consideration and they were divided into large, medium and small scales and for the types of projects, they were divided into, shops, department stores, shopping centers, hospitals, government buildings, hotels, accommodation facilities, factories, buildings for workshops, office buildings, stadiums, playgrounds, schools and other construction types and all the data divided into such categories was analyzed. The results in this study can be used as a basic reference for studies in analysing construction management performances.

  • PDF

An Analysis on the Current Status of Domestic Construction Management (국내 CM방식의 현황 및 활성화 분석에 관한 연구)

  • Yoon, Byung-Shik;Lee, Jung-Hyun;Yoo, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.483-486
    • /
    • 2007
  • In 1997, after Construction Management was introduced, it has been ten years; moreover, there has been many thesis until recently. However, in the past thesis, studies of Construction Management were limited to the public and standards for an activation were not certain. So, in this study, using Public Announcement of CM Ability Valuation, we analyzed the market of the domestic CM in the aspect of the number of contracts and the sum of money. The number of domestic construction contracts has decreased since 2002. In contrast with the number, the sum of money has increased. And the market of CM has been extended. However, the occupancy rate of the contract money was low in contrast with the number of contracts. But comparing with the growth rate of economy and Construction market, that of the CM market has been extending. Through this study, we decided that the market of CM was being activated.

  • PDF

Development of CM Best Practice Checklist using Analytic Hierarchy Process Methodology And searching a correlation with a project performance (다기준의사결정법을 이용한 CM Best Practice 체크리스트 개발 및 사업 결과와의 상관관계 규명)

  • Lee Tai-Sik;Park Se-Jin;Choi Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.620-624
    • /
    • 2004
  • The Construction Industry become to large. So, construction management is needed. In Korea, an organic law about construction industry was made in 1996. And CM was introduced, too. But CM is not activated with institutional inertia. A reason Is a perpetual friction between CM and Gamri. And it is not thoroughgoing enough about supply of CM's effect with Chf Best Practice checklist and Key Performance Index. This study will develop the CM Best Practice checklist with CM's work and technique in project-dimensional. The CM Best Practice checklist will guide to have a good result.

  • PDF

The Design and Implementation of Project Management Information System based on 4CM (4CM기반의 건설사업관리 시스템 개발 및 구현)

  • Choi, Sung Youn;Kim, Jae Soo
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.7 no.2
    • /
    • pp.101-113
    • /
    • 2011
  • As information and communication technology advances driving the rapid evolution of e-commerce and e-business becomes on effective marketing means for both business and institutions, the industry deals with these changes and has a profound, positive impact on production and operations management. But the construction industry falls behind compared with other industries in productivity, informationalization, automatization and globalization. Especially even though the informationalization is inevitable in any developing society, a number of construction industries can hardly cope with it properly. As the construction industry gets informationalized and advanced, the introduction of PMIS (Project Management Information System) is making progress actively for the effective construction project control and productivity improvement in construction. With the government officials' political promotion and the rising desire for construction informationalization of enterprises, many are attempting to develop integrated systems or to replace a previous system with a more advanced alternative. Construction Industry, however, has the peculiar properties that the period for the completion of construction is limited and on top of that, most of its data processing systems are seen as being an early stage in the design of management information systems. As a result, there are extremely few applications in the construction industry. In this paper, we propose the PMIS system based on new model 4CM that improves on previous models.

Identifying the perception on the introducing of Construction Management(CM) in the civil infrastructure project delivery system (사회간접자본 프로젝트의 CM제도 활성화방안에 대한 인식분석 연구)

  • Jang, Won-Suk;Lee, Sang-Uk;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.91-100
    • /
    • 2013
  • Current environment in civil and construction industry has changed to actively adopt construction management (CM) in various areas. While it is found that exemplary CM projects have been carried out in many civil engineering sectors, concrete system framework has not been suggested due to ambiguous boundary between CM and supervision system, unclear perception of CM's role, and inexperienced organization and regime. This paper investigated the challenges faced in civil and construction industry, and analyzed the strategy that could improve the current immature CM system by conducting questionnaire survey from experts in various construction sectors. The results could provide valuable information that can involve diverse opinions and view points in project participants.

A Study on Optimal CM Service and Practice Considering the Characteristic of Owner (발주자의 특성을 고려한 CM업무 최적 활용에 관한 연구)

  • Kim Hae-Sun;Park Young-Ho;Paek Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.638-641
    • /
    • 2003
  • This paper suggests that construction management services should be performed considering the owner's and the project's characteristics through the examples of the successful projects. For this study, the critical CM services in each phase regarding schedule management, cost management and information management are presented and the problems of the CM delivery system in Korea are analyzed with respect to policies, users, suppliers/CMrs and construction environments. Besides, the situation of the delivery systems in Korea and the differences of each delivery system are presented. It is concluded that, for the settlement of CM delivery system in public construction market and, ultimately, the successful execution as an agent of the owner, CMr should diversify the services and give the optimum CM services appropriate for each project's characteristics.

  • PDF

The Construction Management Plan of Dong Myoung Service Area (동명휴게소 건설사업관리 수행계획)

  • In Chi-Sung;Kim Jeong-Won;Jung Soon-Gil;Park Gwon-su;Lee Sung-Gak;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.40-47
    • /
    • 2003
  • The main purpose of Construction Management(CM) is the improvement of efficiency and effectiveness of the project with construction methodologies systematically and technically. This pilot project Dong Myeong Service Area and Gas Station project among 5 projects designated and supervised by Ministry of Construction and transportation(MOCT), is to reduce cost, to maintain and control schedule, to keep proper quality, Claim and Risk through Partnering, Design Review, Constructability, Value Engineering and Project Management Information System(PMIS) and so on. Major factors of CM Plan are introduction of the phased and classified Construction Management Services from initiation of project to completion and adaptation of CM technologies and guide the implementation methodologies of the CM Pilot Project in CM construction market.

  • PDF

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF