• Title/Summary/Keyword: construction inspector

Search Result 38, Processing Time 0.023 seconds

The Size of Crowd Pressure According to Number of Persons (가력 인원수에 따른 군중하중의 크기에 관한 실험적 연구)

  • Kim, Jin-Sik;Shin, Yun-Ho;Choi, Soo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.93-94
    • /
    • 2016
  • The resistance of crowd pressure is an important performance to be influential on safety of facility users among performances required for light weight walls of public facilities. This study has empirically evaluated the estimation of size of crowd pressure to be applied to a wall of structure. For the load analysis test, the force plate with stiffness of 28 kN/cm was designed and manufactured. For inspectors, 15 males in the age of 20s were selected. The action of putting load was set as instantaneous push of plate and continuous push. As the load was increased linearly from the weight of inspector, the size of load was indicated as the load ratio. In case of instantaneous force, about 1.18 times the weight of pushing personnel was acted as a load. In case of continuous push, about 0.80 times the weight of pushing personnel was acted as a load.

  • PDF

A Study of the Identify about Scheduling Process at Owner's Position (IDEF 방법론을 이용한 발주자 공정관리 프로세스 규명에 관한 연구)

  • Lee Tai Sik;Kim Young Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.454-457
    • /
    • 2001
  • All of the partner must manage continually scheduling for the successful project in construction. Besides, that is not a important only contracter's managing but also owner's managing which is a very important about project finishing in time. Especially, in the case of mega project, the owner has to manage progress of scheduling to control contractor. And the case of progress to delay or to change, owner, contractor, and inspector must make a plan of recovery scheduling. This study proposes a construction process model from IDEF Methodology.

  • PDF

A Worker-Driven Approach for Opening Detection by Integrating Computer Vision and Built-in Inertia Sensors on Embedded Devices

  • Anjum, Sharjeel;Sibtain, Muhammad;Khalid, Rabia;Khan, Muhammad;Lee, Doyeop;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.353-360
    • /
    • 2022
  • Due to the dense and complicated working environment, the construction industry is susceptible to many accidents. Worker's fall is a severe problem at the construction site, including falling into holes or openings because of the inadequate coverings as per the safety rules. During the construction or demolition of a building, openings and holes are formed in the floors and roofs. Many workers neglect to cover openings for ease of work while being aware of the risks of holes, openings, and gaps at heights. However, there are safety rules for worker safety; the holes and openings must be covered to prevent falls. The safety inspector typically examines it by visiting the construction site, which is time-consuming and requires safety manager efforts. Therefore, this study presented a worker-driven approach (the worker is involved in the reporting process) to facilitate safety managers by developing integrated computer vision and inertia sensors-based mobile applications to identify openings. The TensorFlow framework is used to design Convolutional Neural Network (CNN); the designed CNN is trained on a custom dataset for binary class openings and covered and deployed on an android smartphone. When an application captures an image, the device also extracts the accelerometer values to determine the inclination in parallel with the classification task of the device to predict the final output as floor (openings/ covered), wall (openings/covered), and roof (openings / covered). The proposed worker-driven approach will be extended with other case scenarios at the construction site.

  • PDF

The Improvement Plan of Project Management for Highway Construction Supervisor using Construction Management Benchmarking of Developed Countries (선진국의 공사관리 벤치마킹을 통한 도로건설공사 감독자의 공사관리 향상방안)

  • Lee, Min-Woo;Shin, Eun-Young;Lee, Kyo-Sun;Park, Hwan-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.138-148
    • /
    • 2006
  • The construction supervisors of the public companies are usually responsible for process management, quality management, safety management, and many other various tasks that occur during construction project. Public companies such as Korea Highway Corporation have developed a framework and manual for management and supervision of construction projects. But, there has been the change of business environment such as increase of private investment project and the introduce of construction management system recently. It has been necessary for construction supervisor to streamline the current project management system in the owner's aspect in order to cope with the expected new challenges. Accordingly, this research has been investigated and analyzed the operation system between Korean supervisor and foreign supervisor in their public corporation. This research has suggested the advanced project management in their public corporation. Especially, this study has proposed the construction management manual for supervisors such as inspectors training, supervisors construction manual, and supervisors training road map.

Butt-fusing Procedures and Qualifications of High Density Polyethylene Pipe for Nuclear Power Plant Application (원자력발전소 적용 고밀도 폴리에틸렌 배관의 맞대기 융착절차 및 검증절차 분석)

  • Oh, Young-Jin;Park, Heung-Bae;Shin, Ho-Sang
    • Journal of Welding and Joining
    • /
    • v.31 no.6
    • /
    • pp.1-7
    • /
    • 2013
  • In nuclear power plants, lined carbon steel pipes or PCCPs (pre-stressed concrete cylinder pipes) have been widely used for sea water transport systems. However, de-bonding of linings and oxidation of PCCP could make problems in aged NPPs (nuclear power plants). Recently at several NPPs in the United States, the PCCPs or lined carbon steel pipes of the sea water or raw water system have been replaced with HDPE (high density polyethylene) pipes, which have outstanding resistance to oxidation and seismic loading. ASME B&PV Code committee developed Code Case N-755, which describes rules for the construction of buried Safety Class 3 polyethylene pressure piping systems. Although US NRC permitted HDPE materials for Class 3 buried piping, their permission was limited to only 10-year operation because of several concerns including the quality of fusion zone of HDPE. In this study, various requirements for fusion qualification test of HDPE and some regulatory issues raised during HDPE application review in foreign NPPs are introduced.

Rebar Spacing Fixing Technology using Laser Scanning and HoloLens

  • Lee, Yeongjoo;Kim, Jeongseop;Lee, Jin Gang;Kim, Minkoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.69-80
    • /
    • 2024
  • Currently rebar spacing inspection is carried out by human inspectors who heavily rely on their individual experience, lacking a guarantee of objectivity and accuracy in the inspection process. In addition, if incorrectly placed rebars are identified, the inspector need to correct them. Recently, laser scanning and AR technologies have been widely used because of their merits of measurement accuracy and visualization. This study proposes a technology for rebar spacing inspection and fixing by combining laser scanning and AR technology. First, scan data acquisition of rebar layers is performed and the raw scan data is processed. Second, AR-based visualization and fixing are performed by comparing the design model with the model generated from the scan data. To verify the developed technique, performance comparison test is conducted by comparing with existing drawing-based method in terms of inspection time, error detection rate, cognitive load, and situational awareness ability. It is found from the result of the experiment that the AR-based rebar inspection and fixing technology is faster than the drawing-based method, but there was no significant difference between the two groups in error identification rate, cognitive load, and situational awareness ability. Based on the experimental results, the proposed AR-based rebar spacing inspection and fixing technology is expected to be highly useful throughout the construction industry.

Analysis on Reduction Effect Factors of Occupational Fatalities in Construction Industry - Focusing on Agency Factors - (건설업의 산업재해 사고사망자 감소 영향요인 분석 - 기관 행정요인을 중심으로 -)

  • Song, Byungchoon;Won, Jeong-Hun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.47-54
    • /
    • 2020
  • The purpose of this study is to determine whether the variables of the agency factors affected the number of occupational fatalities in the construction industry in order to determine whether there is a relationship between the number of occupational fatalities occurring at the construction sites and the agency. The considered agencies are KOSHA (Korea Occupational Safety and Health Agency) and MOEL (Ministry of Employment and Labor). The variables of two agency factors are classified as follows: the variables of two agency factors are the number of employees, budget amounts, technical support and guidance for construction sites of KOSHA, and the number of labor inspectors, the number of inspection and oversight workplace, the number of criminally punished construction sites and fines levied on them in the industrial accident prevention departments of Regional Employment and Labor Office. The multiple regression analysis was conducted to determine the effect of two agency factors on the total number of occupational fatalities in the construction industry. The policy implications derived from this study are that, in order to reduce the fatalities of construction sites by KOSHA, the appropriate level of increased budget for KOSHA must be secured every year. In addition, the amount of fines levied on construction sites by the labor inspector in the industrial accident prevention departments of Regional Employment and Labor Office reduces the occupational fatalities at the construction sites.

Public Infrastructure Practitioner's Recognition on Project Performance (공공토목공사 실무자의 성과요인 인식차이 분석)

  • Park, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.93-100
    • /
    • 2007
  • Performance measurement and evaluation is a critical issue in public funded civil infrastructure projects in recent years. As a results, Korean government has introduced the related policies and regulations based on the foreign cases to evaluate public construction projects. However, construction circumstances are different from other countries and the results from adopted regulations are not satisfied. Therefore this research proposes the critical success factors(schedule, cost, productivity, change order, safety, quality) for public construction projects based on previous related research outputs to successfully implement construction performance evaluation. Then, this paper also proposes the weights for the critical success factors. The proposed weights are developed by AHP of construction experts. Furthermore, the paper shows the difference of the weights of the critical success factors by project participants (owner, constructor, engineering, and inspector). This efforts will enhance the ability to develop an effective performance evaluation process and system for public construction projects.

Merits and Demerits of the Inspection System introduced in Construction of City Planning Road: In Case of Crossing Road of the Aioiyama Green Area in Nagoya

  • Yutaka Okamura
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.2
    • /
    • pp.178-184
    • /
    • 2004
  • The Yatomi - Aioiyama line is a city-planning road that was notified in 1957 and subsequently prepared by land readjustments. Currently, approximately 900m of road pass in the inside of the Aioiyama green area has not been constructed. The surveying briefing session for inhabitants was held in July 1992, the project was authorized by the Ministry of Land, Infrastructure and Transport in September 1993, and the project briefing session for inhabitants was held in September 1993. The site purchase has been completed. At the May 2000 briefing session, inhabitants of the area began voicing dissenting demanding the conservation of the natural environment of this green area. The inspector system serves as the third party, independent of both the administration and the inhabitants. Before finalizing the geometric line form of the road to be constructed, some surveys of animals and plants found along the walking trails carried out intensively in the northern area, which is approximately 50 ha, of the Aioiyama green area. The natural environment inspector submitted a plan for changing the geometric line form of the road decided upon by city planning, and it was approved by the city planning council. If the shelter structure or the retaining wall structure is adopted at the location where large slope faces are produced by excavation or landfill, and if the bridge structure is adopted at the place where stream-lines and walking trails intersect, it leads to a reduction of approximately $40\%$ in the areas for which change is planned. Furthermore, approximately $20\%$ of the area to be changed is restored by returning soil to the roof of the shelter.

  • PDF

Development of the Corrosion Deterioration Inspection Tool for Transmission Tower Members

  • Woo, Sangkyun;Chu, Inyeop;Youn, Byongdon;Kim, Kijung
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.293-298
    • /
    • 2016
  • Recently, interests for maintenance of transmission tower are increasing to extend life of structures and reduce maintenance cost. However, existing classical diagnosis method of corrosion deteriorated degree on the transmission tower steel members, visual inspection, has a problem that error often due to difference of inspector's individual knowledge and experience. In order to solve the problem, this study carried out to develop the corrosion deterioration inspection tool for transmission tower steel members. This tool is composed of camera equipment and computer-aided diagnosis system. We standardized the photographing method by camera equipment to obtain suitable pictures for image processing. Diagnosis system was designed to evaluate automatically degree of corrosion deterioration for member of transmission tower on the basis of the RGB color image processing techniques. It is anticipated that developed the corrosion deterioration inspection tool will be very helpful in decision of optimal maintenance time for transmission tower corrosion.