• Title/Summary/Keyword: construction facilities

Search Result 2,717, Processing Time 0.038 seconds

A Study on the Estimation Measure of Delay Cost on Work Zone Using the Traffic Flow Model (교통류 모형을 이용한 도로 점용공사 구간의 지체비용 산정방안)

  • Kim, Yunsik;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.120-129
    • /
    • 2016
  • The user cost is an important analysis item which should be considered together with life-cycle of facility, administrator cost and discount rate in LCCA for efficient asset management of SOC facilities. Especially, a significant delay cost occurs often for users in the road field due to a work zone for cleaning and maintenance, and in such case, the administrator should consider the administrator cost as well as the user cost for more rational decision making. However, the user cost has not been considered in most decision making steps until recently and relevant studies also have not been carried out actively. In this study, the methodology to estimate the user cost and delay cost required in the decision making step using the traffic flow model and the direct benefit estimation model in the traffic facility investment evaluation guideline is suggested. And, the traffic flow model was estimated on 4 national highway sections where maintenance was actually carried out in 2014 using VISSIM and, the user cost and the delay cost were estimated based on the suggested methodology. The analysis result showed that the average user cost of $17,569,000KRW/km{\times}day$ occurred on Section A with approximately 30,000 AADT before a work zone occurred, and in case the first lane was blocked for maintenance, the delay cost of $10,193,000KRW/km{\times}day$ (158%) on average occurred additionally. The delay cost of $1,507,000KRW/km{\times}day$ (115%) and $1,985,000KRW/km{\times}day$ (119%) occurred on Sections B and D with approximately 20,000 AADT respectively and the delay cost of $262,000KRW/km{\times}day$ (105%) occurred on Section C with approximately 10,000 AADT. This result of this study was estimated based on the simulation of traffic flow model so that there is a limitation in its actual application. A study ot develop a highly appropriate model using actual observation data and improve the possibility to apply it through the verification using the simulation will be necessary in future.

Recent Progress in Air-Conditioning and Refrigeration Research: A Review of Papers Published in the Korean Journal of Air-Conditioning and Refrigeration Engineering in 2014 (설비공학 분야의 최근 연구 동향: 2014년 학회지 논문에 대한 종합적 고찰)

  • Lee, Dae-Young;Kim, Sa Ryang;Kim, Hyun-Jung;Kim, Dong-Seon;Park, Jun-Seok;Ihm, Pyeong Chan
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.7
    • /
    • pp.380-394
    • /
    • 2015
  • This article reviews the papers published in the Korean Journal of Air-Conditioning and Refrigeration Engineering during 2014. It is intended to understand the status of current research in the areas of heating, cooling, ventilation, sanitation, and indoor environments of buildings and plant facilities. Conclusions are as follows. (1) The research works on the thermal and fluid engineering have been reviewed as groups of heat and mass transfer, cooling and heating, and air-conditioning, the flow inside building rooms, and smoke control on fire. Research issues dealing with duct and pipe were reduced, but flows inside building rooms, and smoke controls were newly added in thermal and fluid engineering research area. (2) Research works on heat transfer area have been reviewed in the categories of heat transfer characteristics, pool boiling and condensing heat transfer and industrial heat exchangers. Researches on heat transfer characteristics included the results for thermal contact resistance measurement of metal interface, a fan coil with an oval-type heat exchanger, fouling characteristics of plate heat exchangers, effect of rib pitch in a two wall divergent channel, semi-empirical analysis in vertical mesoscale tubes, an integrated drying machine, microscale surface wrinkles, brazed plate heat exchangers, numerical analysis in printed circuit heat exchanger. In the area of pool boiling and condensing, non-uniform air flow, PCM applied thermal storage wall system, a new wavy cylindrical shape capsule, and HFC32/HFC152a mixtures on enhanced tubes, were actively studied. In the area of industrial heat exchangers, researches on solar water storage tank, effective design on the inserting part of refrigerator door gasket, impact of different boundary conditions in generating g-function, various construction of SCW type ground heat exchanger and a heat pump for closed cooling water heat recovery were performed. (3) In the field of refrigeration, various studies were carried out in the categories of refrigeration cycle, alternative refrigeration and modelling and controls including energy recoveries from industrial boilers and vehicles, improvement of dehumidification systems, novel defrost systems, fault diagnosis and optimum controls for heat pump systems. It is particularly notable that a substantial number of studies were dedicated for the development of air-conditioning and power recovery systems for electric vehicles in this year. (4) In building mechanical system research fields, seventeen studies were reported for achieving effective design of the mechanical systems, and also for maximizing the energy efficiency of buildings. The topics of the studies included energy performance, HVAC system, ventilation, and renewable energies, piping in the buildings. Proposed designs, performance performance tests using numerical methods and experiments provide useful information and key data which can improve the energy efficiency of the buildings. (5) The field of architectural environment was mostly focused on indoor environment and building energy. The main researches of indoor environment were related to the evaluation of work noise in tunnel construction and the simulation and development of a light-shelf system. The subjects of building energy were worked on the energy saving of office building applied with window blind and phase change material(PCM), a method of existing building energy simulation using energy audit data, the estimation of thermal consumption unit of apartment building and its case studies, dynamic window performance, a writing method of energy consumption report and energy estimation of apartment building using district heating system. The remained studies were related to the improvement of architectural engineering education system for plant engineering industry, estimating cooling and heating degree days for variable base temperature, a prediction method of underground temperature, the comfort control algorithm of car air conditioner, the smoke control performance evaluation of high-rise building, evaluation of thermal energy systems of bio safety laboratory and a development of measuring device of solar heat gain coefficient of fenestration system.

A Design Model on Outdoor Space of Elementary School based on Participatory Approach - Case Study on Seoul Don-Am Elementary School - (참여디자인 방법론을 적용한 초등학교 옥외공간 계획모형 - 서울 돈암초등학교를 대상으로 -)

  • Hue, Youn-Sun;Im, Seung-Bin
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.38 no.5
    • /
    • pp.1-11
    • /
    • 2010
  • The outdoor space of an elementary school is the most familiar and most educational area for children. A paradigm shift in education has demanded a new role and direction for these outdoor spaces. The construction of children-friendly spaces, however, lags behind. The child-participatory design process is very meaningful at a time when many outdoor spaces have difficulties in reflecting the varied and specific demands of children. This study realized the necessity for a design that includes a child-participatory design process in construction the outdoor spaces of elementary schools. Through reference study and a theoretical approach of related laws, this study established a child-participatory design process model and applied it to Seoul Don-Am Elementary School. The design process included playing games and providing interesting tools to increase the participation of children in suggesting and presenting their opinions more freely. The design process of this study is described in five steps(eliciting interest in and recognition of the target space, Understanding children's expectations and the expressing thereof, Establishing factors for planning, Visualizing and arranging spaces, and Decision-making and building a final design plan). This process was applied to the planning and design of an outdoor space for Seoul Don-Am Elementary School. In this study, it is clear that the design of the participators and experts have a different purpose. Thus, the process of the design has more meaning than the final product. In addition, it is expected that an improvement in both tangible and intangible designs will be seen. Using a participatory design process, this study successfully improved the facilities and arrangement planning of an outdoor space. At the same time, it also enhanced the interest and participation of children in the process of creating the kind of school they desire. The significance of this study is that it has suggested an effective model to reflect the demands of children, the true users of the outdoor space, and the results were actually applied to elementary school outdoor planning and designing. This study enhanced the awareness of school members in the process of building the school's outdoor space.

Improvement Strategy & Current Bidding Situation on Apartment Management of Landscape Architecture (공동주택 조경관리 입찰 실태와 개선방안)

  • Hong, Jong-Hyun;Park, Hyun-Bin;Yoon, Jong-Myeone;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.48 no.4
    • /
    • pp.41-54
    • /
    • 2020
  • This study was conducted to provide basic data for a transparent and fair bidding system by identifying problems and suggesting improvement measures through an analysis of the bidding status for construction projects and service-related landscaping of multi-family housing. To this end, we used the data from the "Multi-Family Housing Management Information System (K-apt)" that provides the history of apartment maintenance, bidding information, and the electronic bidding system to examine the winning bid status and amount, along with the size and trends of the winning bids by year, and the results of the selection of operators by construction type. As a result, it was found that out of the total number of successful bids (36,831), 4.4% (16,631) were in the landscaping business, and the average winning bid value was found to be about 24 million won. According to the data, 73% of the landscaping cases were valued between 3 million won and 30 million won, and 58.6% of the cases were in the field of "pest prevention and maintenance". 36% of the total number of bids were awarded from February to April, with "general competitive bidding" accounting for 59.8% of the bidding methods. As for the method of selecting the winning bidder, 55% adopted the "lowest bid" and "electronic bidding method," and 45% adopted the "qualification screening system" and "direct bidding method." As an improvement to the problems derived from the bidding status data, the following are recommended: First, the exception clause to the current 'electronic bidding method' application regulations must be minimized to activate the electronic bidding method so that a fair bidding system can be operated. Second, landscaping management standards for green area environmental quality of multi-family housing must be prepared. Third, the provisions for preparing design books, such as detailed statements and drawings before the bidding announcement, and calculating the basic amount shall be prepared so that fair bidding can be made by specifying the details of the project concretely and objectively must be made. Fourth, for various bidding conditions in the 'business operator selection guidelines', detailed guidelines for each condition, not the selection, need to be prepared to maintain fairness and consistency. These measures are believed to beuseful in the fair selection of landscaping operators for multi-family housing projects and to prepare objective and reasonable standards for the maintenance of landscaping facilities and a green environment.

A reevaluation of the castles and palaces of Goryeo Gangdo (江都) using GIS (고려 강도(江都)의 성곽과 궁궐 재고찰)

  • KANG, Dongseok
    • Korean Journal of Heritage: History & Science
    • /
    • v.54 no.4
    • /
    • pp.174-191
    • /
    • 2021
  • Gangdo (江都), a reproduction of Gaegyeong, was the capital of Goryeo for 39 years. However, due to the urgent wartime situation of the Mongol invasion and the geographical features of Ganghwa Island, the castle system and palace layout were somewhat different from those of Gaegyeong. Gangdo's castle can be understood as a triple castle system consisting of outer castle, middle castle, and inner castle. First, the outer castle was the first to be completed, and it was built at the forefront to prevent the Mongol army from invading in the first place. It is presumed that the section was between Huamdon and Hwadodon in the outer castle during the Joseon Dynasty. The middle castle can be seen as the present 'Middle Castle', a castle built of earth on the outskirts of the Ganghwa-mountain Castle. Considering the sophistication and robustness of the construction method confirmed in the archaeological research, this castle is thought to have been built under a meticulous plan. In other words, as the capital city, it was completed 'at last' as recorded in the Koryo History, after a long 18-year construction process to protect palaces, government offices, and private houses. The inner castle was a castle with the character of a palace. This corresponds to the Old Castle of Ganghwabu (江華府) during the Joseon Dynasty, and it almost coincided with the scale of the composition of Gaegyeong's palace castle. It was a complex functional space, featuring the integration of the palace and the imperial castle, where the main government offices and ancillary facilities, including the palace, were located. Based on the documentary record that these palaces were similar to Gaegyeong's palace, the palace map was overlapped with that of Gaegyeong. The central axis of the building from Seungpyeongmun (昇平門) to Seongyeongjeon (宣慶殿) coincided with Kim Sangyongsunjeol Monument in Ganghwa- Goryeo Palace. Therefore, it seems that the palace of Gangdo had the same basic structure as that of Gaegyeong. However, the inner palace and annexed buildings must have been arranged in consideration of the topographical conditions of Ganghwa, and this is estimated to be the Gunggol area in Gwancheong-ri.

The Records and Archives Administrative Reform in China in 1930s (1930년대 중국 문서당안 행정개혁론의 이해)

  • Lee, Won-Kyu
    • The Korean Journal of Archival Studies
    • /
    • no.10
    • /
    • pp.276-322
    • /
    • 2004
  • Historical interest in China in 1930s has been mostly focused on political characteristic of the National Government(國民政府) which was established by the KMT(中國國民黨) as a result of national unification. It is certain that China had a chance to construct a modern country by the establishment of the very unified revolutionary government. But, it was the time of expanding national crises that threatened the existence of the country such as the Manchurian Incident and the Chinese-Japanese War as well as the chaos of the domestic situation, too. So it has a good reason to examine the characteristic and pattern of the response of the political powers of those days. But, as shown in the recent studies, the manifestation method of political power by the revolutionary regime catches our attention through the understanding of internal operating system. Though this writing started from the fact that the Nationalist Government executed the administrative reform which aimed at "administrative efficiency" in the middle of 1930s, but it put stress on the seriousness of the problem and its solution rather than political background or results. "Committee on Administrative Efficiency(行政效率委員會)", the center of administrative reform movement which was established in 1934, examined the plan to execute the reform through legislation by the Executive Council(行政院) on the basis of the results of relevant studies. They claimed that the construction of a modern country should be performed by not political revolution anymore but by gradual improvement and daily reform, and that the operation of the government should become modern, scientific and efficient. There were many fields of administrative reform subjects, but especially, the field of records and archives adminstration(文書檔案行政) was studied intensively from the initial stage because that subject had already been discussed intensively. They recognized that records and archives were the basic tool of work performance and general activity but an inefficient field in spite of many input staff members, and most of all, archival reform bring about less conflicts than the fields of finance, organization and personnel. When it comes to the field of records adminstration, the key subjects that records should be written simply, the process of record treatment should be clear and the delay of that should be prevented were already presented in a records administrative meeting in 1922. That is, the unified law about record management was not established, so each government organization followed a conventional custom or performed independent improvement. It was through the other records administrative workshop of the Nationalist Government in 1933 when the new trend was appeared as the unified system improvement. They decided to unify the format of official records, to use marker and section, to unify the registration of receipt records and dispatch records and to strengthen the examination of records treatment. But, the method of records treatment was not unified yet, so the key point of records administrative reform was to establish a unified and standard record management system for preventing repetition by simplifying the treatment procedure and for intensive treatment by exclusive organizations. From the foundation of the Republic of China to 1930s, there was not big change in the field of archives administration, and archives management methods were prescribed differently even in the same section as well as same department. Therefore, the point at issue was to centralize scattered management systems that were performed in each section, to establish unified standard about filing and retention period allowance and to improve searching system through classification and proper number allowance. Especially, the problem was that each number system and classification system bring about different result due to dual operation of record registration and archives registration, and that strict management through mutual contrast, searching and application are impossible. Besides, various problems such as filing tools, arrangement method, preservation facilities & equipment, lending service and use method were raised also. In the process this study for the system improvement of records and archives management, they recognized that records and archives are the identical thing and reached to create a successive management method of records and archives called "Records and Archives Chain Management Method(文書檔案連鎖法)" as a potential alternative. Several principles that records and archives management should be performed unitedly in each organization by the general record recipient section and the general archives section under the principle of task centralization, a consistent classification system should be used by classification method decided in advance according to organizational constitution and work functions and an identical number system should be used in the process of record management stage and archive management stage by using a card-type register were established. Though, this "Records and Archives Chain Management Method" was developed to the stage of test application in several organizations, but it was not adopted as a regular system and discontinued. That was because the administrative reform of the Nationalist Government was discontinued by the outbreak of the Chinese-Japanese War. Even though the administrative reform in the middle of 1930s didn't produce practical results but merely an experimentation, it was verified that the reform against tradition and custom conducted by the Nationalist Government that aimed for the construction of a modern country was not only a field of politics, but on the other hand, the weak basis of the government operation became the obstacle to the realization of the political power of the revolutionary regime. Though the subject of records and archives administrative reform was postponed to the future, it should be understood that the consciousness of modern records and archives administration and overall studies began through this examination of administrative reform.

Design and Management Direction of Smart Park for Smart Green City (스마트 그린시티 구현을 위한 스마트 공원 설계·관리 방향)

  • Kim, Yong-Gook;Song, Yu-Mi;Cho, Sang-kyu
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.48 no.6
    • /
    • pp.1-15
    • /
    • 2020
  • The purpose of this study is to propose a direction for designing and managing a smart park for realizing a smart green city and to present measures in the landscape field to foster related industries. The research process is as follows. First, the concept of a smart park was operationally defined through a literature review, and three principles to be considered in the process of creation and management were established. Second, in terms of the three principles, problems and implications for improvement were derived through an analysis of established cases of smart parks in new and pre-existing cities. Third, a pool of designs and management standards for each spatial component of a smart park was prepared through literature and case studies, and then further refined through brainstorming with experts in related fields. Fourth, measures were suggested to the government, local governments, and the landscape field to promote smart park creation and management. The main findings are as follows. First, the concept of a smart park is defined as "a park that contributes to securing the social, economic, and environmental sustainability of cities and local communities by supporting citizens' safe and pleasant use of parks and improving the management and operational efficiency by utilizing the digital, environment, and material technologies." Second, the three principles of smart parks are to improve the intrinsic value of parks, to improve the innovative functions of parks to solve urban problems, and to make the design, construction, and management process smart. Third, improvement implications were derived through the analysis of cases of smart parks creation in new and pre-existing cities. Fourth, the directions for smart park design and management were suggested in five aspects: green area, hydroponic facility area, road and plaza area, landscape facilities area, and park design method. Fifth, as for policy implications for revitalizing the construction and management of smart parks, the development of smart park policy business models by city growth stage, and park type, the promotion of pilot projects, the promotion of smart park projects in connection with the Korean New Deal policy, and smart park policies led by landscape experts were presented.

Analysis of Local Government Environmental Impact Assessment (EIA) Ordinances and Preparation of Consultation Guidelinesfor EIA - A Case of Incheon Metropolitan City - (지방자치단체 환경영향평가 조례 현황 분석과 협의 지침서 작성 방안 - 인천광역시 사례를 중심으로 -)

  • Lee, Jongook;Cho, Kyeong Doo
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.4
    • /
    • pp.226-240
    • /
    • 2022
  • Local governments over a certain size in Republic of Korea may conduct Environmental Impact Assessment (EIA) considering regional characteristics if it is necessary, in accordance with Article 42 of the 「Environmental Impact Assessment Act」. However, it was investigated that the number of local government EIA operation in many local governments was less than initial expectations. In order to improve it, the status of ordinances and consultation guidelines which are different for each local government need to be compared, and the institutional issues forthe relevant local governments must be found considering regional characteristics. Furthermore, detailed regulation and guidance on the local government EIA procedure should be included in the consultation guidelines and related information need to be provided. In this study, focusing on the case of Incheon Metropolitan City, the status of local government EIA ordinances in metropolitan cities and provinces with a similar condition was investigated, and the types and scope of target projects were compared and analyzed. In addition, consultation guidelines forIncheon Metropolitan City were written, and improvements on the procedure flow and overall schedule designation derived from the process were presented. In the case of Incheon Metropolitan City, there were no detailed information officially announced regarding the regulations of the local government EIA ordinance and follow-up management, so the administrative system of the local government needed to be reinforced in this field. Meanwhile, considering the status of local environment and geography, some target project types were deemed necessary to be added: port construction projects, water resource development projects, railroad construction projects, and military facilities installation projects. The results of this study will provide useful information to local governments which want to improve their operation effectiveness by reorganizing the local government EIA system and preparing specific guidelines.

Changes in Construction and Characteristics during the Period of Foundation and Change of the Garden Pond Site in Guhwang-dong, Gyeongju (경주 구황동 원지(九黃洞 園池) 유적 창건 및 변화 시기의 조영과 성격 변화)

  • KIM, Hyungsuk
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.3
    • /
    • pp.102-118
    • /
    • 2022
  • Gyeongju, the capital of Silla, is the very essence of the culture and technology of the thousand-year-reign of Silla. However, few studies have been conducted on the landscape sites of the capital of Silla other than Donggung Palace and Wolji Pond, due to the lack of related data. Therefore, this study examined the construction characteristics and nature of the garden pond in Guhwang-dong, whose complete appearance was identified through excavation following Donggung Palace and Wolji Pond. Since the excavation of the garden pond in Guhwang-dong, Gyeongju, there have been disagreements in academia as to whether it is a palace pond or a temple pond of Bunhwangsa Temple. Considering the unique characteristic of the garden pond that it is divided into two periods, it was interpreted that it would have functioned as a ritual facility related to Ryong (oriental dragon) belief in the 6th to 7th centuries, the first period, and as a garden pond with enhanced landscaping functions in the 8th to 9th centuries, the second period. In addition, it is highly probable that it was the site of Cheongyeongung Palace (青淵宮) and Jochujeong Pavilion (造秋亭) mentioned in the literature records. The "ㄹ"- shaped waterway, a characteristic facility of the first period, was found; however, considering its width and depth, it is insufficient to conclude that it was a simple drainage facility. Rather, it is more likely that it functioned as a passageway for the conceptual entry of Ryong during Ryong rituals. Furthermore, some have suggested that it may have been a ceremony-related Yusang-goksu (流觴曲水) facility. These facilities related to Ryong rituals were reorganized in the second period. Specifically, the nature of the garden pond was changed centered on the landscaping function in connection with the addition of a curved revetment, garden stone, and pavilion buildings, and the dismantlement of the "ㄹ"-shaped waterway and hexagonal building. As for nature, it can be regarded as a royal facility in terms of decorative elements including the ritual function of the first period and the gwimyeonwa (ghost face tiles) of the second period. Judging from the fact that the upper part of the embankment adjacent to the west side of the site was removed, it is very apparent that the main building was located on the upper part of the embankment. There would not have been a large-scale building site because it served the functions of ritual and recreation, rather than being the residence of the king.

Project of Improving Good Agriculture Practice and Income by Intergrated Agricultural Farming (미얀마 우수농산물 재배기술 전수사업)

  • Lee, Young-Cheul;Choi, Dong-Yong
    • Journal of Practical Agriculture & Fisheries Research
    • /
    • v.16 no.1
    • /
    • pp.193-206
    • /
    • 2014
  • The objectives of the project are to increase farmers' income through GAP and to reduce the loss of agricultural produce, for which the Korean partner takes a role of transferring needed technologies to the project site. To accomplish the project plan, it is set to implement the project with six components: construction of buildings, installation of agricultural facilities, establishment of demonstration farms, dispatching experts, conducting training program in Korea and provision of equipments. The Project Management Committee and the Project Implementation Team are consisted of Korean experts and senior officials from Department of Agriculture, Myanmar that managed the project systematically to ensure the success of the project. The process of the project are; the ceremony of laying the foundation and commencing the construction of training center in April, 2012. The Ribbon Cutting Ceremony for the completion of GAP Training Center was successfully held under PMC (MOAI, GAPI/ARDC) arrangement in SAl, Naypyitaw on June 17, 2012. The Chairman of GAPI, Dr. Sang Mu Lee, Director General U Kyaw Win of DOA, officials and staff members from Korea and Myanmar, teachers and students from SAl attended the ceremony. The team carried out an inspection and fixing donors' plates on donated project machineries, agro-equipments, vehicles, computers and printer, furniture, tools and so forth. Demonstration farm for paddy rice, fruits and vegetables was laid out in April, 2012. Twenty nine Korean rice varieties and many Korean vegetable varieties were introduced into GAP Project farm to check the suitability of the varieties under Myanmar growing conditions. Paddy was cultivated three times in DAR and twice in SAl. In June 2012, vinyl houses were started to be constructed for raising seedlings and finished in December 2012. Fruit orchard for mango, longan and dragon fruit was established in June, 2012. Vegetables were grown until successful harvest and the harvested produce was used for panel testing and distribution in January 2013. Machineries for postharvest handling systems were imported in November 2012. Setting the washing line for vegetables were finished and the system as run for testing in June 2013. New water tanks, pine lines, pump house and electricity were set up in October 2013.