An Effect Analysis of Lead Time Changes on Investment Evaluation of a Nuclear Power Plant Construction : A Trade-Off Analysis Between a Construction Cost and Lead Time (원자력발전소 건설 리드타임의 변화가 투자프로젝트 평가에 미치는 효과분석: 발전소 건설비용과 리드타임 간의 상쇄효과분석)

  • Kim, Gyu-Tai;Lee, Byung-Gook;Oh, Chi-Jae
    • IE interfaces
    • /
    • v.12 no.3
    • /
    • pp.414-423
    • /
    • 1999
  • A nuclear power plant requires a huge amount of initial investment and long construction lead time. As we expect that there may exist a relationship between investment and construction lead time, a number of researchers have reported that nearly a half of investments is incurred due to time factors such as the time value of money and inflation or escalation rates. Therefore, we investigated in this paper a relationship between the initial investment and the construction lead time of a nuclear power plant construction, and proposed a method for a trade-off analysis between the annual equivalent worth and the investment alternatives to reduce the construction lead time. Finally, we presented a real case to numerically explain the steps of the method presented in this paper.

  • PDF

The state of Act and Policy for Recycling of Construction Industry Wastes

  • Ahn, Ji-Whan;Lee, Yong-Hee;Kim, Hyung-Seok;Lee, Bong-Han;Kim, Hwan;Oh, Jae-Hyun;Gung, Yeon-Nam;Kang, Byung-Ok;Kim, Kyung-Soo
    • Proceedings of the IEEK Conference
    • /
    • 2001.10a
    • /
    • pp.671-674
    • /
    • 2001
  • In Korea, because of the shortage of reclaimed lands and disposal sites and the small size of national land, A political measure for construction wastes recycling is needed. therefore we studied the current state of construction wastes recycling and the act for it. And we analyzed problems and unreasonable regulations regarding the wastes. So we suggested an alternative act to increase the construction wastes recycling.

  • PDF

Application of the Robot for Curtain Wall Installation in a High Building (고층 빌딩 커튼월 시공 작업에서의 로봇 활용에 관한 연구)

  • Lee, Soung-Yel;Ko, Bong-Soo;Lee, Kye-Young;Lee, Sang-Heon;Ohk, Young-Mu;Han, Chang-Soo
    • Proceedings of the KSME Conference
    • /
    • 2003.11a
    • /
    • pp.1488-1493
    • /
    • 2003
  • Recently, higher and bigger building is trend of the construction. Accordingly the building material is getting bigger and construction equipments are developed. But operation is still depends on human resource. Therefore there have several problems that are safety, laborious operation, and shortage of worker. In the various construction sites, the automation in construction is introduced to solve these problems. This paper proposed the automation system in construction that installs curtain wall in a high building. The system is expected effects that are reduction of a construction period, retrenchment of the cost and assurance of safety.

  • PDF

A Case Study on the Discrete Segmental Retaining Wall in Highway Construction (분리형 보강토공법의 고속도로 적용사례)

  • 노한성;최영철
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.10a
    • /
    • pp.337-344
    • /
    • 2001
  • The application of mechanically stabilized earth wall(MSEW) with segmental front panel has been increasing in highway construction due to its cost-effectiveness. However, some failures during construction have been reported and many field engineers are reluctant to select this method for important structure. One of the main reasons may be that there is no moderate specification for design and construction of MSEW yet. This paper discussed the main results of analysis on a case of block-type segmental retaining wall in highway construction. Based on the results, some recommendations on design and construction method of MSEW are presented.

  • PDF

Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation (4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성)

  • Song, Sung-Yol;Yang, Jeong-Sam;Myung, Tae-Sik
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).

Delay Factor Analysis and Process Enhancement System Development Focusing on Masonry Work (조적공사에서의 작업 지연 요소 도출 및 개선 시스템 제안)

  • Park, Min Ha;Lee, Hye Lin;Ko, Yong-Ho;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.119-120
    • /
    • 2015
  • Appropriate management of the finish works in construction project is one of most important activities that must be conducted considering the total duration of the project. Masonry work is a fundamental process that is performed in the preliminary steps of finish works. However, it has been investigated that the analysis of delay factors affecting masonry work has been neglected in the domestic construction site. Therefore, this study deducts delay factors affecting masonry work by literature review and survey on site engineers and labors. This study has been conducted as a preliminary step of developing a construction project interference management system which is expected to suggest objective information for the decision making in construction sites.

  • PDF

Existing and progress control research of Existing quantity the integrated information Uses WBS-CBS. (WBS-CBS통합정보의 실적수량에 의한 기성 및 진도관리에 관한 연구)

  • Ahn, Jae-Hong;Lee, Young-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.261-264
    • /
    • 2009
  • Construction projects are managed by focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. This paper proposes existing and progress control research of existing quantity the integrated information uses WBS-CBS. Schedule and cost are most important in construction projects. Specially, progress and cost are relationship of the managing integrated in many construction management. The quantity of materials for the works of construction is the base to create activities and a network. The quantity of materials of materials for the elemens of a building is a base of cost estimation and resource. allocation. This study suggest method for relating the schedule and cost information through the case study of construction field engineers.

  • PDF

Effects of Length of Down Conductor on Transient Ground Impedance (인하도선 길이에 따른 과도접지임피던스 특성)

  • Lee, B.H.;Jeong, D.C.;Lee, S.B.;Lee, T.H.;Jung, H.U.;Lee, K.S.;Lee, S.C.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07c
    • /
    • pp.2235-2237
    • /
    • 2005
  • This paper presents the transient impedance behaviors of grounding systems to lightning impulse current. The potential rise and effective impulse ground impedance of the test grounding electrodes were measured as a function of the rise time of impulse currents and lengths of down conductor. The transient ground impedances strongly depend on the configuration and size of grounding electrodes, the impulse current shapes and lengths of down conductor, and the inductance of reduce of grounding electrode inductance is an important factor to improve the transient ground impedance.

  • PDF

Analysis of Building Service System Construction Flow (건축설비 공사 하자 사례 유형 분석 및 대책)

  • Park, Jin-Kwan;Park, Jong-Il
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.548-553
    • /
    • 2006
  • The aim of this paper is to analysis mechanical system flaw in building service system construction. From this paper, most mechanical flaws are from design mistakes, material flaws, other engineering construction's negligence of construction execution and careless system operation managements. Through this study, the author suggested the way to reduce mechanical flaw, during construction process from drawing survey before execution start to completion of construction.

  • PDF

Development of Support System in Preparing Placing Drawings for the Improvement of Efficiency of Reinforcing Steel Works

  • Hyeon-Yong Park;Tai-Kyoung Kang;Yoo-Sub Lee;Hun-Hee Cho;U-Yeol Park;Hyun-Oak Jung;Kyo-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1370-1376
    • /
    • 2009
  • Reinforcing steel works should be carefully controlled by the construction manager considering the severe fluctuation of the price of reinforcing steel bars and for the safety of structure in building constructions. In particular, preparing rebar placing drawings needs more effort and time than before because of the emergence of higher and more complicated buildings. Moreover, the experience of field engineers or foremen (fabricators or detailers) in preparing placing drawings gives rise to the differences in fabricated bar type and quantity of bars used. To address these problems, this study proposed the support system in preparing placing drawings for reinforcing steel works efficiency. In the near future, if this system can be made available on the web, multiple end-users will be able to share the result; the efficiency of rebar supply chain management will also be improved.

  • PDF