• 제목/요약/키워드: construction delays

검색결과 181건 처리시간 0.031초

도심지 건설공사 건설 자재의 효율적 재주문시점 산정 방안에 관한 연구 (The research of Economical Re-oder point Estimating Method for building construction on the Downtown Area)

  • 윤정숙;김근환;조영식;김창덕
    • KIEAE Journal
    • /
    • 제13권1호
    • /
    • pp.159-165
    • /
    • 2013
  • Recently buildings are being constructed on the downtown area. In most building construction sites on the downtown area, the need for adequate material inventories are critical in order to avoid project delays and cost increases due to inappropriate deliveries of key materials. However immoderate material inventories cause increasing inventory cost. Therefore, we need a proper management material inventories. This research re-establishes the existing safety stock and analyzes relationship between safety stock and service level. It suggests an economical re-order point based on safety stock considering service level, various demand and delivery time.

구조설계정보 통합 관리에 의한 철근 물량 산출 자동화 기초 연구 (Basic study about Automatic Rebar Quantity Estimation Integrated with Structural Design Information)

  • 성수진;임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.109-110
    • /
    • 2015
  • Estimation of rebar quantity may be used as an index to evaluate the economic feasibility of structural designs. However, when using the software to estimate the rebar quantity, there may be some limitations such as data loss caused by human errors and estimation delays caused by increased input time, since the information on arrangement of rebar is inserted manually. To solve the problems of such quantity estimation software, it is necessary to develop a method on automatic input/output of structural design information for quantity estimation and an algorithm for accurate estimation of rebar quantity. The purpose of this study is to improve the existing rebar quantity estimation by connecting with the database on information related to rebar estimation and the algorithm for rebar estimation, in order to develop an algorithm to estimate an accurate, net rebar quantity. The study result can be used as basic data for development of software for efficient structural designs and automatic framework estimation of buildings.

  • PDF

산화마그네슘 및 재유화형 분말수지를 사용한 시멘트계 불연단열재의 단열특성 (Insulation Property of Cement-based Non-combustible Inorganic Insulation Using MgO and Redispersible Polymer Powder)

  • 손배근;송훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.120-121
    • /
    • 2021
  • The organic insulation material has excellent thermal insulation property, but it is difficult to expect fire stability, and semi inorganic insulation only delays combustible hour but it is difficult to expect fire stability. In this study, thermal insulation property of cement-based non-combustible inorganic insulation using cement and non combustible materials and redispersible polymer powder was studied. As a result of the experiment, the thermal insulation property decreased as the use of redispersible polymer powder increased, but the heat insulation property improved when using the appropriate amount.

  • PDF

황산염나트륨 자극제를 사용한 플라이 애쉬 혼입 시멘트 페이스트의 초기 수화 특성에 관한 기초적 연구 (A Study on Sodium Sulfate Activited the Hydration Properties of Fly Ash-cement Paste)

  • 왕자호;순양;이한승
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.129-130
    • /
    • 2021
  • In order to solve the problem of low early-age compressive strength of high volume fly ash concrete. This paper studies the effect of 2% sodium sulfate (Na2SO4) as a chemical activator on the paste with 40% fly ash content and a water-binder ratio of 0.30. The results indicate that the addition of Na2SO4 can effectively improve the early-age compressive strength of the fly ash-cement system, and the strength improvement rate on the first day reached nearly 70%. In addition, calorimetric analysis reveals that the incorporation of Na2SO4 promotes the early hydration of cement and fly ash, increases the cumulative hydration heat and delays the heat peak of the aluminum phase.

  • PDF

PROJECT COMPLEXITY AS A MODERATOR OF PERFORMANCE BIAS TOWARDS OVERRUN

  • Li liu;Andrew Nguyen;James Arvanitakis
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.38-45
    • /
    • 2011
  • Studies have shown that infrastructure projects have continued to experience significant delays and cost overrun over an extended period of time and no evidence of learning ever have happened [1] [2]. Various causes contribute to the bias towards overrun [3]. This study contributes to literature by developing and subsequently validating a set of hypothesized relationships between project complexity and project performance. The results show that project complexity is associated with both the magnitude and variance of overrun. Further, the extent and magnitude of the positive bias towards overrun are moderated by project complexity.

  • PDF

건설프로젝트의 품질결함의 발생요인간 상관분석 (A Correlation Analysis of Influence Factors of Nonconformity in Construction Projects)

  • 지성준;차용운;한상원
    • 한국건설관리학회논문집
    • /
    • 제16권2호
    • /
    • pp.21-28
    • /
    • 2015
  • 공사비 증가와 공기 지연 등 건설프로젝트에 악영향을 미치는 건설품질결함은 지속적으로 발생하고 있다. 그간 결함을 유발시키는 원인들을 규명하기 위한 연구는 다수 있었으나, 원인들 간의 상관관계를 분석한 연구는 충분히 이루어지지 않았다. 본 논문에서는 국내 30개 프로젝트에서 발생한 1,241건의 부적합 사례 중 831건의 건축공종 부적합 사례를 토대로 건설품질결함의 발생요인을 발생단계, 발생현상, 기인원인, 처리방안으로 나누어 이들 간의 상관관계를 분석하고자 한다. 상관분석을 통해 부적합은 주로 조달 및 시공단계에서 기능결함 및 시공결함의 형태로 발생함을 알 수 있었다. 주로 작업자의 실수, 조악한 품질의 자재사용, 그리고 잘못된 시공방법에 의해 발생되는 품질결함은 주로 특채, 수리, 재작업의 방법으로 처리되어 공사비 증가 및 공기 지연을 가져옴을 알 수 있었다. 본 논문은 향후 품질결함의 발생과정을 규명하고 효율적인 품질결함 방지대책을 수립하는 데에 있어 중요한 이론적 배경과 정량적 지표를 제공했다는 데 그 의의가 있다.

실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석 (Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju)

  • 홍정호;이동욱
    • 대한토목학회논문집
    • /
    • 제34권2호
    • /
    • pp.667-676
    • /
    • 2014
  • 본 연구는 제주특별자치도 내 실적공사비가 적용된 도로현장을 중심으로 물가변동에 따른 실적공사비 등락률 산정의 문제점을 분석하기 위하여 실시되었다. 본 연구를 위하여 제주특별자치도 내 9개 도로공사 현장을 중심으로 실적공사비방식, 표준품셈방식, 건설공사비지수방식에 따른 등락률을 비교 분석하였다. 분석결과 9개 현장 중 약 56%인 5개 현장에서 실적공사비의 지수조정률이 표준품셈과 건설공사비지수의 지수조정률에 비해 낮게 산정되었다. 이는 실적공사비가 적용됨에 따라 물가변동으로 인한 계약금액 조정 성립요건이 지연되고 있다는 것을 알 수 있으며, 이에 따라 공사 준공 전 물가변동으로 인한 계약금액 조정횟수의 감소와 함께 물가변동금액 역시 차이를 보일 수 있음을 의미한다. 또한, 건설공사비지수 사례분석 결과, 도로부문에 대한 지수를 적용하여 지수조정률을 산출하였으나 지수조정률이 2.0%~9.4%까지 산정되어 이는 공사금액 및 물가변동 적용시기에 따라 상당한 영향을 미치는 문제점이 나타났다.

COVID-19가 건설프로젝트 리스크에 미치는 영향 (Study on the Risk Factors of Construction Projects since COVID-19)

  • 이재현;이성현;이동훈
    • 한국건설안전학회 논문집
    • /
    • 제4권1호
    • /
    • pp.1-8
    • /
    • 2021
  • 현재 유행하고 있는 COVID-19는 '세계보건기구' 설립 이래 가장 많은 사망자가 발생한 대유행이다. 수많은 건설 프로젝트에도 상당한 영향을 미칠 것으로 예상된다. COVID-19가 건설업계를 강타한 이후, 그들이 감당해야 할 위험은 매년 줄어들었다. 그러나 COVID-19의 장기화로 인해 대기 지연, 자재 공급, 경제적 손실의 위험이 증가했다. 정확한 대책은 파악이 필요할 것이며 현재 건설사업 중 리스크가 더 큰 비중으로 완화될 수 있어야 한다. 따라서 이번 연구는 COVID-19로 인해 국내 건설사에 건설사업에 영향을 미친 위험요소를 분석하고 규명하는 것을 목적으로 한다. 이전 건설 프로젝트의 리스크를 바탕으로 조사, 가중치 부여 등을 통해 리스크 사례 연구, COVID-19 관련 리스크 등을 추출한다. 각 위험 요소는 AHP 분석 기법을 기반으로 계산된다. 이에 따라 COVID-19로 인해 건설공사 리스크 연구 결과가 달라질 것으로 예상된다. 그것은 현재 상황과 이후의 전염병 상황에 대처하기 위해 제시될 것이다.

도로건설사업 시공단계 성과평가 프레임워크 연구 (Analysis on Performance Assessment Framework of Construction Phase for Road Construction Projects)

  • 문준부;이강욱;윤성민
    • 대한토목학회논문집
    • /
    • 제43권6호
    • /
    • pp.801-809
    • /
    • 2023
  • 대규모로 진행되는 도로건설사업에서 비용 초과와 공기 지연이 지속적으로 발생하고 있지만 이를 사전에 관리하고 대비할 수 있는 성과평가 체계 연구는 미흡한 실정이다. 또한 긴 공기를 가진 도로건설사업은 시공과정에서 많은 요인들에 영향을 받기 때문에 도로만의 특성을 고려한 성과 평가를 실시하고, 추후 유사한 사업에 대비할 필요가 있다. 따라서 본 연구는 도로건설사업의 시공단계 성과평가 프레임워크를 개발하여 도로건설사업의 성과관리 방안을 제시하고자 한다. 본 연구는 각종 유관기관에서 도로건설사업 시공단계의 정보를 수집하고 속성정보에 따라 데이터베이스를 구축하였다. 또한 사업의 착공·준공시점 간 시간차에 대해 비용 표준화를 실시하였고, 성과평가를 위한 지표를 도출하여 분석을 실시하였다. 본 연구는 도로건설사업 시공과정의 절대적, 상대적 비용·일정 성과를 정량적으로 분석함으로써 성과평가 연구의 고도화 가능성과 신규 도로건설사업 계획 시 활용방안을 보여준다.

철도 교량공사의 적정공사기간 산정을 위한 비작업일 산정에 관한 연구 (A Study on Considering Non-Working Days for Determination Normal Project Duration in the Railway Bridgework Construction)

  • 채수민;이상혁;박형근
    • 대한토목학회논문집
    • /
    • 제41권5호
    • /
    • pp.601-608
    • /
    • 2021
  • 최근 건설공사에서 근로기준법의 개정, 이상 기후의 증가로 인한 작업가능일수의 감소와 비작업일수의 증가에도 불구하고 이를 반영한 표준 건설공사기간이 마련되어 있지 않다. 이로 인해 현장에서 적정공사기간을 산정하더라도 예기치 못한 상황에 의해 공기지연이 발생하고 있는 실정이다. 따라서 본 연구에서는 기존의 방식에 건설 제반여건의 변화와 기후변화를 반영한 철도 교량공사의 비작업일수 산정방법을 제시하고, 이 산정방법을 철도 교량공사에 반영하여 전국의 지역별·월별 비작업일수를 산정하였다. 그 결과, 국내의 지역별·월별 비작업일수를 도출하였고, 이를 통해 지역적 특성과 공종별 특성을 반영한 정확한 공사기간의 규정 및 기준의 필요성을 제시했다.