Browse > Article
http://dx.doi.org/10.20931/JKICS.2021.4.1.001

Study on the Risk Factors of Construction Projects since COVID-19  

Lee, Jae-Hyun (Department of Architectural Engineering, Hanbat National University)
Lee, Seong-Hyeon (Department of Architectural Engineering, Hanbat National University)
Lee, Donghoon (Department of Architectural Engineering, Hanbat National University)
Publication Information
Journal of the Korea Institute of Construction Safety / v.4, no.1, 2021 , pp. 1-8 More about this Journal
Abstract
COVID-19, which is currently in vogue, is a pandemic with the largest number of deaths since the establishment of the "World Health Organization". It is also expected to have a significant impact on countless construction projects. After COVID-19 hit the construction industry, the risk that they needed to cover, decreased every year. However, the prolonged COVID-19 increased the risks of air delays, material supply, and economic losses. The exact measurements will be needed to be identified and the risks of the current construction projects must have a mitigated risk with a greater proportion. Therefore, the purpose of this study is to analyze and identify the risks that have influenced construction projects to the domestic construction companies due to COVID-19. Based on the risks of the previous construction projects, risk case studies, and risks related to COVID-19, are extracted through surveys, weights. Each risk factor are calculated based on the AHP analysis technique. Thus, it is expected that the results of the risk research on construction projects will change due to COVID-19. It will be presented to cope with the current situation and later pandemic situations.
Keywords
Pendemic; COVID-19; Analytic Hierarchy Process; Risk;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Korea Disease Control and Prevention Agency, https://coronaboard.kr/
2 Ministry of Employment and Labor. 2019 Sanub Jaehae Hyeonhwang [2019 The Present Condition Industrial Accident]. pp. 14
3 Park Yongseong (2012). "Decision-making by AHP-theory and practice", Kowoo
4 Satty, T.L (1980) "The Analytic Hierarchy Process", Mc Graw Hill.
5 Byun Soo-Young, Chung Min-Hee, Park Jin-Chul, Rhee Eon-Ku (2010). "A Study on the Influencing Factors for the Application of Hybrid Renewable Energy Systems" (2010-6) pp. 333-340.
6 Ahn Sanghyun (2015). "A Case Study of the Risk Identification in Construction Project" Korea Institute of Construction Engineering and Management (2015-1) pp. 15-23.
7 Keun-Tae Cho, Seong Joon Kim, Dae-Sik Kim, Young-Woo Cho, Jong-In Lee (2003). "Priority Setting for Future Core Technologies using the AHP" (2003) pp. 41-46.
8 Ministry of Employment and Labor. 2017 Sanub Jaehae Hyeonhwang [2017 The Present Condition Industrial Accident]. pp. 16.
9 Ministry of Employment and Labor. 2018 Sanub Jaehae Hyeonhwang [2018 The Present Condition Industrial Accident]. pp. 15.
10 Chung Yeon-Kyo, Chung Byeong-Hwa (2014). "Analysis of Effect of Risk Factors on the Success of Risk Management" (2014-8) pp. 443-449.
11 Shim Jae-Choon (2005). "A Study on the Criteria of Site Decision of the Cultural Complex" Arichitectural Institute of Korea (2005-10) pp. 105-112.
12 Minseok Kim (2021). "A Study on Architectural Approaches Corresponding to the Post-COVID Era", Arichitectural Institute of Korea (2021-2) pp. 67-75.