The research of Economical Re-oder point Estimating Method for building construction on the Downtown Area |
Yun, Jung-Suk
(광운대학교 건축공학과)
Kim, Geun-Hwan (광운대학교 건축공학과) Jo, Young-Sik (광운대학교 건축공학과) Kim, Chang-Duk (광운대학교 건축공학과) |
1 | Kang HG, Ha YS, Im CW, Kim CD, Yu JH, Efficiency Analysis for RFID-based Curtain Wall of Unit Type Construction, Journal of Korea Institute of Construction Engineering and Management, 2008:9(3):206-213 |
2 | Lee JM, Kim CD, Yu, JH, Determination Method of Order Quantity based Dynamic Materials Information , Architectural Institute of Korea, 2009:25(12):145-153 |
3 | Alessandro P, Daria B, Riccardo M, Arrigo P, Optical safety stock levels of subassemblies and manufacturing components, International journal of production economics, 2007:147-159 |
4 | 김길선, 김재환, 김희탁, 서창적, 어윤양, 유시정, 유한주, 황복주, 디지털 시대의 생산시스템과 SCM, 법문사 , 2004 |
5 | Im, KS, Han SH, Jung DY, Ryu CK, Choi SK, Inventory Management in Construction Operations Involving on-site Fabrication of Faw Materials, Journal of Korea Institute of Construction Engineering and Management, 2008:9(1):187-198 |
6 | Jung DY, Park SH, Han SH, Determining the Reliable Inventory Level Using Probabilistic Inventory Model, 2005 Korean Society of Civil Engineers(KSCE) Annual Convention, 2005:4857-4862 |