A Study on Improving Performance Bond System for Efficient Execution of Public Construction Works (효율적인 공사수행을 위한 공사이행보증제도 개선방안 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.21-29
    • /
    • 2020
  • This study analyzed problems of operating performance bond for public works and derived some suggestions for improvement. The Contract Law for Government Owner requires to submit performance bond which guarantees performing the construction contractor pays back compensation money when the obligation is not executed. Currently, first bid eligibility for participation is exactly required for executing company of performance bond obligation, not considering volume, technical level, and special type of remaining works. In collaboration contract, if guarantee accident occurs, it is obliged for remaining collaboration contractors to be qualified to fulfill the whole contract. This study proposes following improvement plan to solve problems of current performance bone in public works. Firstly, qualification criteria must be deregulated exceptionally for selecting proper contractor, which executing performance bond obligation, considering progress and characteristics of remaining works. Secondly, In collaboration contract, the prerequisite of remaining contractors' should be deregulated as 'implementation requirement of the remaining works'from'implementation requirement of the whole work'. Finally, defect responsibility should be included in liabilities of performance bond by specifying that owner or guarantee agency bear them.

Improved Scheme to Manage Engineering Man-hour in a Plant Project (플랜트 프로젝트에서의 설계시간 관리 기법 개선 방안에 관한 연구)

  • Shin, Ji-Roh;Moon, Seung-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.5 no.1
    • /
    • pp.51-59
    • /
    • 2009
  • The global plant construction market has grown dramatically since 2000. As the market grows, domestic EPC contractors are expanding to meet its needs and have made great strides in terms of economic indicators from a decade ago. Larger projects involve a number of risk factors, such as volatile oil prices, however, and thus require quantitative and elaborate project management techniques for the ultimate success of a project's profitability. In addition, many Korean companies face difficulties in predicting potential risks and problems due to a lack of experience in dealing with the global market trend toward projects based on the Cost-re(Cost Reimbursable) contract as opposed to those based on the LSTK(Lumpsum Turnkey) contract. This study will examine methods and types of man-hour management according to plant project contract types. Further, it will explore the man-hour management system for successful completion of projects by satisfying the client's needs and enhancing the convenience in engineers' using the system. Additionally, this study will analyze the current system and identify its problems to address potential problems.

  • PDF

A Study on the Application Scheme of the Warranty delivery system in Domestic Private Finance Initiative (국내 민간투자사업의 성능발주제도 도입에 관한 연구)

  • Kim, Dae-Kil;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.527-530
    • /
    • 2007
  • The construction market has gradually become complexity, variety and specialization, and then owner's requirements about quality has become various. In order to solve the problem such as stated above, advanced constructions in France, United Kingdom, Japan and United States have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction since 1960s. In addition to, domestic constructions have been meeting with international competition because of the open BOT market from FTA. Finally, this study proposed new warranty delivery system model in PFI on considering domestic status by benchmarking the delivery process and the characteristics of the warranty contract which is applied to PFI of global.

  • PDF

A Basic Study on Effective Adjustment Method for Construction Escalation/De-Escalation Price (건설공사 중 물가변동에 따른 효율적인 계약금액 조정에 관한 기초 연구)

  • Sung, Ju-yong;Kim, Dong-jin;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.3-11
    • /
    • 2019
  • The construction of a facility is an act whereby infrastructure such as roads and railways and other facilities such as housing and office spaces are constructed, and due to the characteristics of the relevant industry where such construction is carried out in a custom order method, it requires a long period of time mostly. While the construction is carried out over a long period of time, fluctuations in the price of raw materials required for the construction occur. Therefore, the cost of the construction also fluctuates inevitably. The fluctuation of the construction cost meshes closely with the profit of a constructor and the efficiency of government spending. Therefore, it is necessary to maintain the construction cost at a reasonable level by adjusting the construction cost rationally in order to secure the required construction quality and spend the budget efficiently. The buffer system for solving such problem is the contract amount adjustment system by fluctuations in prices (Escalation/De-Escalation). In this study, the method combining the escalation method based on the item adjustment method was suggested for an efficient contract amount adjustment method. In addition, it is proposed that there be an investigation and codification of matters not applied to government acts and regulations on contracts related to the adjustment of fluctuations in prices legally.

Assessment of Accident Level Based on Contract Amount by Type of Construction (공사유형별 건설수주액을 고려한 건설재해수준 평가기법)

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.2
    • /
    • pp.157-163
    • /
    • 2021
  • The accident rate is obtained by dividing the number of accidents by the number of regular workers. In the case off construction work, however, the accident rates are not accurately figured out, because they use the approximate number of regular workers, which is estimated based on the amount of construction work and the labor ratio. In addition, the current accident rate estimation method does not reflect the characteristics of construction types, such as building, civil, plant, etc. This study is conducted with the aim of presenting a supplementary method of accident rate assessment that incorporates the characteristics of type of construction. For the purpose of this, correlation and regression analysis are executed to verify the relationships between number of accidents and the amount of construction contract, and several equations are derived which shows the relationship between the number of accidents by accident types and amount of constract by construction types. The result shows that the non-residential work amount and the number of accidents showed a proportional relationship, while the civil work amount and the number of accidents showed an inversely proportional relationship. The results of this research are expected to calibrate the construction accident rates and to be used as an auxiliary indicator to determine the trend of annual accident rates by comparing the values with usual years.

Analyzing the Market Structure of Asian Construction Contracts : A Perspective on Korean Construction Firms (국내 건설기업의 아시아 계약실적 구조 분석)

  • Lee, Kang-Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.5
    • /
    • pp.623-630
    • /
    • 2019
  • As the Asian region becomes strategically important in the international construction market, competition among construction firms has been more intense. While existing literature on the Asian construction market have mainly focused on qualitative approaches to market entry strategies and risk assessment, quantitative research to explain the dynamic competitive structure of the market has been rarely conducted. To address this issue, this study analyzes the structure of contract performance in the Asian region based on the data from 3,996 projects awarded to Korean construction firms from 2009 to 2017. In addition, this study applies a mathematical model using both static (market concentration) and dynamic (market mobility and instability) analyses. Consequently, the static analysis indicates that market concentration led by top-four firms tends to be increased, and on the dynamic aspect, the market position of Korean construction firms is recently weakened and fluctuated in most of the Asian regions and the construction sectors. The methodology and result of this paper would be meaningful not only to understand the underlying structure of industry-level performance but also to provide a useful reference for establishing competitive strategies towards the Asian market.

A Study on the Improvement of Supervision Works related to Changes in Construction Projects (공공공사의 설계변경과 관련한 감리업무 개선방안에 대한 연구)

  • Kwon Chan-Soon;Kim Man-Chul;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.246-249
    • /
    • 2003
  • we classified major changes into changes based on design deficiency, changes based on the different conditions between job site and contract documents, and changes based on the Owner's need. Then we compare and analyzed applicable regulations for supervision and work performance status at the site, and elicit problems of supervision performance based on mutual contradiction in regulations, bringing up a similar example. Based on the above, we brought up a way of improvement for the elicited problem, comparing and analyzing the laws/contract provisions/instructions related with the changes and the work performance at the jobsite, and verified through interviews with professionals of various fields for the improvement. Finally this study could elicit a way of improvement in the supervision work in conjunction with changes in civil works.

  • PDF

Application of Partnering and Constructability in the Design Development Phase of Public Design-Build Projects (공공부문 일괄사업 실시설계단계의 파트너링과 시공성 분석 적용방안)

  • Nam, Yong-Ho;Yeon, Hee-Jung;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.531-534
    • /
    • 2007
  • In the current domestic design-build contract, design and construction are separated due to prohibition of outside work. but instead the design-build contract adopts a method of fulfilling each assignment as a joint venture, which makes it difficult for participants to communicate each other and often require changes of design. also, It is difficult to performance efficiency project that they don't want to share useful information related to design and construction. In this study suggests how to maxmize the effiency of the project by proposing a process model connected with an efficient partnering and constructability in a deign development phase of design-build constract.

  • PDF

An Analysis on Expanding Construction Insurance and Estimating Necessary Budget (건설공사보험 확대 당위성 및 예산소요 분석 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.94-102
    • /
    • 2014
  • This study analyzes necessity of expanding construction insurance and estimates required budget. Construction insurance is obliged by National Contract Law and Local Contract Law to protect projet owners and contractors from any unexpected construction risk such as financial losses in construction process. Currently the contracts of design-build and alternate-bid projects as well as PQ project, which are greater than 20 billion won, require the contractors to provide construction insurances in Korea. Insurance premiums are borne by the public project owner. Those contractors whose contract volume is less than 20 billion won burden all risks of projects at their cost. This causes equity problem. Because small-and-medium contractors are discriminated against large contractors since insurance-obliged projects are performed by large contractors and insurance premiums are borne by the public project owner. On the other hands, in all engineering projects, regardless of volume, insurance premiums are borne by the project owner. Therefore current regulation has to be improved, by expanding to all public projects. The average ratio of unobliged projects is 46%, in recent 3 years, prime cost of insurance companies is estimated 0.2%. Moreover considering risks of each construction type, prime cost of unobliged works is estimated as 0.13%. Hence additional necessary budget is estimated to be 2.09 billion won if total volume of public work is 3.5 trillion won. And 2.39 billion won is derived if total volume of public projects is 4 trillion won.

Development of Construction Cost Model through the Analysis of Critical Work Items (코스트 중요항목 분석을 통한 공사비 예측모델 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.212-219
    • /
    • 2003
  • In construction project planning and control, a cost model performs a critical role such as cost determination on a contract stage and cost tracing. The model can maximize owner's profit and value within the project budget and optimize cost management works on overall construction implementation stages. A BoQ(Bill of Quantities) generally adopted in a unit price contract has been applied as an important tool for cost control and forecast. However a previous cost model based on the BoQ has shown limitations in that it requires too detailed information and heavy manpower on cost management and difficulty in keeping relationship with construction planning, scheduling and progress management. The each cost items and unit prices which constitute of construction works are individually very important management factors but the relative weight for each items and prices have a difference on the contents and conditions of each conditions of each construction works. In consideration of this structural mechanism of cost determination, this research is aimed at examining the critical factors affecting the construction cost determination and propose and verify a new cost forecasting model which is more simple and efficient and also keeps the accuracy of cost management.