Improved Scheme to Manage Engineering Man-hour in a Plant Project

플랜트 프로젝트에서의 설계시간 관리 기법 개선 방안에 관한 연구

  • Received : 2008.11.27
  • Accepted : 2009.02.20
  • Published : 2009.03.30

Abstract

The global plant construction market has grown dramatically since 2000. As the market grows, domestic EPC contractors are expanding to meet its needs and have made great strides in terms of economic indicators from a decade ago. Larger projects involve a number of risk factors, such as volatile oil prices, however, and thus require quantitative and elaborate project management techniques for the ultimate success of a project's profitability. In addition, many Korean companies face difficulties in predicting potential risks and problems due to a lack of experience in dealing with the global market trend toward projects based on the Cost-re(Cost Reimbursable) contract as opposed to those based on the LSTK(Lumpsum Turnkey) contract. This study will examine methods and types of man-hour management according to plant project contract types. Further, it will explore the man-hour management system for successful completion of projects by satisfying the client's needs and enhancing the convenience in engineers' using the system. Additionally, this study will analyze the current system and identify its problems to address potential problems.

Keywords