• Title/Summary/Keyword: concrete rehabilitation

Search Result 314, Processing Time 0.027 seconds

Thin Bonded Concrete Overlay for Concrete Pavement Rehabilitation (콘크리트포장의 박층 콘크리트 덧씌우기공법)

  • 윤경구;이형준;엄주용;서영찬
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.04a
    • /
    • pp.635-642
    • /
    • 1997
  • This research focused on the development of concrete overlay and test, which was conducted at 88 Highway 105k, 2 lanes of 290 m. The field application test consists of 6 cm and 10 cm bonded concrete overlay and 25 cm unbonded concrete overlay, using the slag cement for opening lanes for traffic early. The overlay were placed in a day. The whole period of traffic closing wes 8 day and it was reopened to traffic after concrete overlay has cured for 3 day. 5 cracks were founded when the field test section was investigated after 1 month, but all these may not make significant problems to overlay because these initiated and growed at the same line of repair section. The rideability and skid resistance become much better like in the new pavement after overlay. The structural capacity against deflection was much. which were verified by FWD(Falling Weight Deflectometer). The field test section is being used in a good condition and the results of field application and pavement performance analysis are encouraging. This rehabilitation methods may be adopted in Korea after a more field performance verifications.

  • PDF

A Study on Strengthening of R/C T Girder Bridge using Standardized Strengthening Technique with Fiber Plastic(I) (표준화된 섬유보강공법을 적용한 RC T형 교량의 성능향상연구(I))

  • 심종성;오홍섭;임채옥
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.10a
    • /
    • pp.545-548
    • /
    • 1999
  • The purpose of this study is application of strengthening technique of R/C concrete bridge by standardization of repair and rehabilitation. For that, experiment to bridge is necessary, and through the experiment, this study can identify the efficiency o applied method and analysis of design parameters with can't get in the laboratory experiment. This study will prove the structural behavior of R/C type girder bridge which is deteriorated but repaired and rehabilitation from standardized strengthening method with fiber plastic.

  • PDF

Development of the Repair and Rehabilitation Methods for R/C Structures (철근콘크리트 구조물의 보수 보강 신기술 개발)

  • Sim, Jong-Sung;Hong, Young-Kyun;Choi, Long;Im, Chang-Duck
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.04a
    • /
    • pp.207-211
    • /
    • 1995
  • As the construction industry has been developed since 1970, there is a great needs to develop the methodology for repair and rehabilitation of the damaged reinforced concrete structures. Numerous materials which are currently used in construction field without any regulations are examined in terms of their serviceabilities and effectiveness. Structural behavior of repaired beams are investigated both statically and dynamically. This paper summarize the overall research plan, which is sponsored by KICT, in 1994.

  • PDF

Maintenance, Repair and Rehabilitation (MR&R) Practice for Concrete Bridge Decks

  • Hong, Tae Hoon
    • Architectural research
    • /
    • v.7 no.2
    • /
    • pp.81-89
    • /
    • 2005
  • Over the years, existing bridges have had various degrees of maintenance to extend the service life. As the existing bridges continue to deteriorate, however, each Department of Transportation (DOT) of the United States of America faces increasing demands on the limited funds available for bridge maintenance. Therefore, it is very important for State Department of Transportations to establish Maintenance, Repair, and Rehabilitation (MR&R) strategies for bridge structures such that funds get allocated for appropriate maintenance over the service life. This paper identifies the state-of-art and the state-of-practice of MR&R actions and the use of MR&R strategies in concrete bridge decks. In addition, a questionnaire survey was conducted to identify the type and timing for MR&R actions as well as existing MR&R strategies taken in concrete bridge deck by each DOT. This paper also presents the results of the survey.

Application on Geotextiles for the Roadbed Reinforcement of the Concrete Track Rehabilitation (콘크리트궤도 개량공사시 노반 보강을 위한 토목섬유의 적용)

  • Lee, Il-Wha;Jang, Seung-Yup;Han, Sung-Wu;Kim, Yong-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1802-1806
    • /
    • 2007
  • The most important factor is the roadbed bearing capacity at concrete track construction. Particularly, in case of rehabilitation, it is essential to secure the uniform roadbed stiffness to prevent the irregular settlement. In this study, reinforced effect of the geotextiles is investigated which is applied to concrete track rehabilitation. The geotextiles is installed two or three layers as the condition of the ground and structure. The reinforced effect of geotextiles is confirmed by the strain gage attached on the geotextiles surface.

  • PDF

A Study for Drainage Pipe Construction Method using a Boring Machine (천공장치를 이용한 배수설비 연결관 시공 기술에 관한 연구)

  • Chang, Jae-Goo;Kang, Seon-Hong;Kim, Dong-Eun;Jung, Tae-Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.6
    • /
    • pp.869-875
    • /
    • 2011
  • Ministry of Environment has been promoting BTL business of the sewer rehabilitation which continues from 2005 up to now. Sewer rehabilitation is classified into three parts : wastewater pipe rehabilitation, rainwater pipe rehabilitation and drainage equipment rehabilitation. Drainage equipment rehabilitation is that drainage pipe connects wastewater pipe directly without water-purifier. In the drainage equipment construction, it is inevitable to have the damage of ground structures(wall, gate and U drain, etc) when an open excavation method is used. Therefore it is necessary to develop non-excavation method to connect drainage pipe and wastewater pipe like jacking method to avoid the damage of ground structure. This paper has conducted an analysis of the non-excavation method using a boring machine attached to backhoe, which is issued the verification certificate of environmental technology according to the Development of and Support for Environmental Technology Act, article.7. The index set in this analysis was sectionalized to the condition of construction, the grade of drainage pipe, the size of excavated hole, the amount of waste cement concrete and asphalt concrete and the benefit effect compared to open excavation method.

Experimental Fatigue Performance of Concrete Slab with I-shaped Steel (I 형강 격자 상판의 피로 성능에 관한 실험적 연구)

  • 박창규;김용곤;김철환;이재형;정영수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10a
    • /
    • pp.541-546
    • /
    • 2000
  • Recently, there have been increased mush concerns about repair and rehabilitation works for aged concrete structures to keep up with rapid economic growth in Korea since the early 1970's. In particular, it is believed in these days that there are significantly increasing number of aged concrete bridge slabs, which are strongly needed to construct and rehabilitate by innovative construction method. The objective of this research is to develop the new construction method of concrete slab in bridge structure, which can contribute to minimize the traffic congestion during the repair and rehabilitation works of aged concrete slab, and can also sufficiently assure the quality through the minimization of in-situ works at the site. I-beams with punch holes, which are substituted instead of main reinforcing steels in concrete slabs, will be manufactured in accordance with the specification in the factory, and will be preassembled into the panel. After erecting the preassembled panels in the site, concrete will be poured into the slab panel. This test is to investigate physical properties of I-Beam with punch holes itself, and then to investigate structural properties of assembled I-Beam panels through static and fatigue test, of which can be utilized for the development of new construction method of concrete slab in bridge structure.

  • PDF

Experimental study for Concrete-filled I-beam Grid Slab (I 형강 격자 상판에 대한 실험적 연구)

  • 박창규;석윤호;김철환;김용곤;정영수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.458-463
    • /
    • 2000
  • Recently, there are increasing much concerns about repair and rehabilitation works for aged Concrete Structures which had been constructed on around the 1970's for rapid economic growth in Korea. In particular, it is believed that there are many aged concrete slabs for Highway bridges in these days. Thus new construction method of concrete slabs are strongly needed to minimize the traffic congestion during the repair works. The objective of this research is to develop the new constructional method of concrete slab in bridge structure, which can contribute to minimize the traffic congestion to be occurred during the repair and rehabilitation works of aged concrete slab, and can also assure the reliable quality through the minimization of in-situ works at the site. I-beams with punch holes will be manufactured in accordance with the specification in the factory, and will be preassembled into the panel. After erecting the preassembled panels in the site, concrete will be poured into the slab panel. This research is to investigate physical properties of I-Beam with punch holes itself, and then to investigate structural properties of assembled I-Beam panels through static and fatigue test, of which result can be utilized for the development of the new constructional method for concrete slab in bridge structure.

  • PDF