• Title/Summary/Keyword: collection cost

Search Result 513, Processing Time 0.03 seconds

Collection and Utilization of the Construction Labor Information Using PDA and Barcode (PDA 및 바코드 기술을 이용한 건설 노무정보의 수집 및 활용)

  • Oh Se-Wook;Kim Young-Suk;Lee Jun-Bok;Kim Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.65-75
    • /
    • 2004
  • Labor management has been considered as an important task in construction industry. However, labor management has not yet been systematically performed because of the wide variety of factors of construction industry such as the field work, the complexity of the work process, the daily employment. Most of the present labor managements are performed to collect the information of the number of labors input during the work period, and to calculate labor cost. The information of activities performed by labors can be effectively used to analyze project status related to schedule, cost and productivity, but the present labor management systems are not based on the activities. The main objective of this research is to develop a labor information management system using IT tools in order to measure the number of labors input on the activities, and to convert the labor information into productivity data. It is anticipated that the effective use of the developed system would be able to effectively assist the scheduling and cost management of a project.

Estimation of Construction Equipment Production Rates: Focus on Efficiency Rate (건설기계 시공능력 산정에 관한 연구 : 작업효율 중심으로)

  • Park, Hee-Sung;Han, Ye Lyeong;Huh, Youngki;Ahn, Bang Ryul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1D
    • /
    • pp.67-72
    • /
    • 2008
  • Heavy equipment is a very important factor for successful construction implementation. Also, the cost for heavy equipment is a major part of construction cost. Therefore, the estimation of equipment cost is a critical job in the construction planning phase. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability per hour and cost. Although the performance of equipment has been improved, the efficiency rates in the formula are not updated lately. Therefore, this research performed several site visits to measure construction equipment working time and then calculates the efficiency rates for hydraulic backhoe, loader, and dump truck. The results show that the measured efficiencies of backhoe and loader are higher than current ones and vice versa for dump truck. This research proposes the needs for a standardized calculation formula and systematic and long-term data collection and measurement for updating efficiency rates for heavy equipment.

An Analysis of the Effect of Platform Information Quality and Customer Information Quality on Customer Loyalty to Online to Offline Platforms (O2O 플랫폼 충성도에 플랫폼 정보 품질과 고객 정보품질이 미치는 영향 분석)

  • Park, Jun Sung;Park, Heejun
    • Journal of Korean Society for Quality Management
    • /
    • v.52 no.1
    • /
    • pp.23-42
    • /
    • 2024
  • Purpose: This study aims to investigate the impact of two types of information quality, which are platform-oriented information quality and customer-oriented information quality, on customers' decision-making processes in the Online to offline (O2O) platform environment. Grounded in the product brokering efficiency model, which encompasses screening cost, evaluation cost, and decision quality, a model framework was developed. Furthermore, this study explores how these decision-making processes affect customer loyalty. Methods: Given that food delivery apps are the most widely used O2O service in Korea, this study targeted users of these apps for data analysis. We conducted hypothesis testing through a purposive sampling methodology focusing on food delivery app users. A Partial Least Squares Structural Equation Modeling analysis was conducted to analyze the data. The data collection occurred via an online survey from October to December 2021, with a total of 212 respondents participating. Results: The results of this study revealed the significant role of information quality in helping customers' decision processes while using food delivery apps. Specifically, it was found that platform-oriented information positively influences decision quality, while customer-oriented information significantly affects both the reduction of evaluation cost and the enhancement of decision quality. Additionally, the study indicated that lower evaluation costs and higher decision quality lead to increased platform loyalty. However, a reduction in screening cost did not have a significant impact on platform loyalty. Conclusion: While previous studies have overlooked the existence of two sides, service provider and user, in a platform, this research holds significance in its analysis of how information quality impacts loyalty by utilizing the two kinds of information quality. Practitioners can enhance customer loyalty to the platform by enriching customer-oriented information, thereby reducing customers' evaluation costs and encouraging more loyal usage of the platform.

A Study on Accounting for Nursing Cost by Korean Diagnosis Related Groups (K - DRGs) (종합병원(綜合病院)의 간호행위양상(看護行爲樣相)에 따른 간호원가(看護原價) 산정(算定)에 관(關)한 연구(硏究))

  • Oh, Hyo-Sook
    • Journal of Korean Public Health Nursing
    • /
    • v.3 no.2
    • /
    • pp.5-46
    • /
    • 1989
  • The current medical payment Insurance Rates in Korea stipulate charges for medical treatment by the doctor, pharmaceutist, medical technician and maternity nurse. But unfortunately didn't specify those charges for nursing done by the professional nurse. Only basic nursing fee is accounted insufficiently in current medical insurance fee schedule. therefore, Being face with covering entire people by medical insurance by 1991, It seems that the problems pertaining to operating the hospital and medical insurance system would be incessantly expanded in that no mention is made of medical charges rendered by major medical producer service in the current system, For that reason, this study made an attempt to clarify the importance the professional nursing puts of the current medical payment. The purpose of this study was to accounting nursing fee which diveded into the current medical fee schedule. (Method) 1. Data collection; Importance and difficulties in nursing activities was conducted in 'S' National University Hospital. Total nursing activities were selected 72 items which included direct care and indirect care. This study was conducted to evaluating the degree of importance and difficulties according to nursing activities through questionnaire to 204 RN. and so relative difficulties (acuity) were computered because the nursing cost level of each nursing service was differently established by the equivalent coefficient according to degree of relative difficulty and time required. 2. Calculation of cost according to nursing activities; After 47 nursing activities were selected in General surgery nursing units, calculation of nursing cost was as follows Cost of Nursing activity = (relative difficulty X Average hourly wage and benefits of nurse) + material cost of nursing -t- Average nursing administration cost So, Calculated cost by nursing activities was compared to current non-insured and insurance rate. 3. Calculation of nursing cost by K - DRG ; Total of 578 patients who were hospitalized in General Surgery units from January to March 1988 ware classified by K - DRG After estimation of total nursing cost based on the K-DRG, verified the appropriateness of basic nursing fee in medical insurance rate (Results) 1. Analysis of degree of importance and difficulties were 4.16 and 3.67 based on 5 point scale. This score were judged that it is worthy specifying the nursing fee 2. The nursing cost of 47 nursing service items in general surgery patients showed that the average cost of nursing activity was \1374.5 and The lowest cost was \217 of 'oral administration nursing' item, The highest cost was \11,025 of 'saline enematill clear' item 3. The result of comparison between the calculated cost by nursing activities against the current non-insured and insurance rate showed that 13 items(27.7%) involved to payment of insurance rate, 9 items(19.1%) involved to non-insured rate, remainder 25 items (53.2%) were not charged anywhere of total 47 nursing activities 4. When calculated cost by nursing activities was 100. current insurance rate was 62.3, non-insured rate was 176.6. Therefore this showed that most of non-insured rate were higher than calculated nursing cost. The insurance rate, however, were lower than it. Reim-bursement was imputed to non-insured patients. So the current rate system became estrainged from cost system. When Remainder 25 items of nursing activities compared' to \1390 of daily basic nursing fee per patient belonged to payment as a insurance fee schedule, basic nursing fee schedule was 1-2% of calculated cost of nursing activities. Therefore it showed that nursing fee was not counted adequately in it. 5. Nursing cost by K-DRG estimated in chart review based on counting number of nursing activities and length of stay The result showed that average amount of total nursing cost was \183828.1 Comparison of nursing cost calculated by K- DRG and basic nursing fee schedule showed that only 12.3% of nursing cost was charged (Conclusion) From the above research result, It is fact that nursing prime cost should be estimated more accurately and included adequately in current medical payment system. The payment system of nursing activities should be introduced not only nursing activities of drug administration and injection fee belonged to insurance fee schedule but also most nursing activities belonged not to mekical fee schedule. Even if introducing payment system of nursing activities, It should be estimated scientific method of Accounting nursing cost So nurses could offer nursing care of good quality, thereby they could make a great contribution not merely to the convalescence of the patient but to the promotion of the people's health.

  • PDF

Development of the Performance Measurement Model of Electronic Medical Record System - Focused on Balanced Score Card - (균형성과표를 활용한 전자의무기록시스템의 성과측정 모형개발)

  • Lee, Kyung Hee;Kim, Young Hoon;Boo, Yoo Kyung
    • Korea Journal of Hospital Management
    • /
    • v.21 no.4
    • /
    • pp.1-12
    • /
    • 2016
  • The purpose of this study are suggest to performance measurement model of Electronic Medical Record(EMR) and Key Performance Index(KPI). For data collection, 665 questionnaires were distributed to medical record administrators and insurance reviewers at 31 hospitals, and 580 questionnaires were collected(collection rate: 87.2%). Regarding methodology, Critical Success Factor(CSF) and index of the information system were derived based on previous studies, and these were set as performance measurement factors of EMR system. The performance measurement factors were constructed by perspective using BSC, and analysis on causal relationship between factors was conducted. A model of causal relationship was established, and performance measurement model of EMR system was proposed through model validation. Analysis on causal relationship between performance management factors revealed that utility cognition of the learning & growth perspective factor had causal relationship with job efficiency(${\beta}=0.20$) and decision support(${\beta}=0.66$) of the internal process perspective factors, and security had causal relationship with system satisfaction(${\beta}=0.31$) of the customer perspective factor. System quality had causal relationship with job efficiency(${\beta}=0.66$) and decision support(${\beta}=0.76$) of the internal process perspective factors, all of which were statistically significant(P<0.01). Job efficiency of the internal process perspective had causal relationship with system satisfaction(${\beta}=0.43$), and decision support had causal relationship with decision support satisfaction(${\beta}=0.91$) and job satisfaction (${\beta}=0.74$), all of which were statistically significant(P<0.01). System satisfaction of the customer perspective had causal relationship with job satisfaction(${\beta}=0.12$), job satisfaction had causal relationship with cost reduction(${\beta}=0.53$) of the financial perspective, and decision support satisfaction had causal relationship with productivity improvement(${\beta}=0.40$)of the financial perspective(P<0.01). Also, cost reduction of the financial perspective had causal relationship with productivity improvement(${\beta}=0.37$), all which were statistically significant(P<0.05). Suitability index verification of the performance measurement model whose causal relationship was found to be statistically significant revealed that $X^2/df=2.875$, RMR=0.036, GFI=0.831, AGFI=0.810, CFI=0.887, NFI=0.838, IFI=0.888, RMSEA=0.057, PNFI=0.781, and PCFI=0.827, all of which were in suitable levels. In conclusion, the performance measurement indices of EMR system include utility cognition, security, and system quality of the learning & growth perspective, decision support and job efficiency of the internal process perspective, system satisfaction, decision support satisfaction, and job satisfaction of the customer perspective, and productivity improvement and cost reduction of the financial perspective. In this study, it is expected that the performance measurement indices and model of EMR system which are suggested by the author, will be a measurement tool available for system performance measurement of EMR system in medical institutions.

Enhanced Production of Phaeodactylum tricornutum (Marine Diatoms) Cultured on a New Medium with Swine Wastewater Fermented by Soil Bacteria

  • Kim, Mi-Kyung;Chang, Moo-Ung
    • Journal of Microbiology and Biotechnology
    • /
    • v.16 no.12
    • /
    • pp.1947-1953
    • /
    • 2006
  • There have been a number of studies of methods for recycling animal wastewater to provide new bioresources. In the present work, a marine algal culture medium, designated KEP II, was prepared by adding swine waste (3% v/v) fermented by soil bacteria to a dilution of f/2 culture medium (CT). When Phaeodactylum tricornutum was grown in batch culture in KEP II, the cells lasted long at the exponential phase producing the specific growth rate and biomass; the production of total amino acids and secondary metabolites rose up to 5-fold. It also substantially enhanced the maximum quantum yield of photo system (PS) II of P. tricornutum, greatly increased the level of thylakoid membranes containing PS, and stimulated the production of pyrenoids, including enzymes for $CO_2$ fixation in chloroplasts. KEP II should improve the cost efficiency of industrial mass batch cultures and the value of microalgae for long-term preservation of fresh aquaculture feed as well as production of anticancer and antioxidant agents. Specifically, a low-cost medium for growing the diatoms of aquaculture feed will be economically advantageous.

The Application of CBR for Improving Forecasting Performance of Periodic Expenditures - Focused on Analysis of Expenditure Progress Curves -

  • Yi, June Seong
    • Architectural research
    • /
    • v.8 no.1
    • /
    • pp.77-84
    • /
    • 2006
  • In spite of enormous increase in data generation, its practical usage in the construction sector has not been prevalent enough compared to those of other industries. The author would explore the obstacles against efficient data application in the arena of expenditure forecasting, and suggest a forecasting method by applying Case-based Reasoning (CBR). The newly suggested method in the research, enables project managers to forecast monthly expenditures with less time and effort by retrieving and referring only projects of a similar nature, while filtering out irrelevant cases included in database. Among 99 projects collected, the cost data from 88 projects were processed to establish a new forecasting model. The remaining 10 projects were utilized for the validation of the model. From the comprehensive study, the choice of the numbers of referring projects was investigated in detail. It is concluded that selecting similar projects at 12~19 % out of the whole database will produce a more precise forecasting. The new forecasting model, which suggests the predicted values based on previous projects, is more than just a forecasting methodology; it provides a bridge that enables current data collection techniques to be used within the context of the accumulated information. This will eventually help all the participants in the construction industry to build up the knowledge derived from invaluable experience.

Design and Implementation of single antenna RFID Shelf for FIFO Management of marine materials (선박용 자재 선입/선출관리를 위한 단일안테나 RFID shelf의 구축에 관한 연구)

  • Jang, Won-Tae
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.3
    • /
    • pp.456-461
    • /
    • 2011
  • In this paper, design and Implementation of single antenna RFID Shelf for FIFO management of marine materials, and propose a design as one effective solution of the problem. The goals of the proposed design and system are as follows: cost saving, RFID data validation. Cost problem occurs by the use of many RFID readers. Data problems in the steel structure is generated by the use of radio wave (RFID). In addition, material data from RFID Shelf system, is expected to be used FIFO design information for the vessel information system. Through the proposed RFID Shelf System, it is expected to systematic management and efficient business processes for the vessel information system.

Carbon nanotube/silicon hybrid heterojunctions for photovoltaic devices

  • Castrucci, Paola
    • Advances in nano research
    • /
    • v.2 no.1
    • /
    • pp.23-56
    • /
    • 2014
  • The significant growth of the Si photovoltaic industry has been so far limited due to the high cost of the Si photovoltaic system. In this regard, the most expensive factors are the intrinsic cost of silicon material and the Si solar cell fabrication processes. Conventional Si solar cells have p-n junctions inside for an efficient extraction of light-generated charge carriers. However, the p-n junction is normally formed through very expensive processes requiring very high temperature (${\sim}1000^{\circ}C$). Therefore, several systems are currently under study to form heterojunctions at low temperatures. Among them, carbon nanotube (CNT)/Si hybrid solar cells are very promising, with power conversion efficiency up to 15%. In these cells, the p-type Si layer is replaced by a semitransparent CNT film deposited at room temperature on the n-doped Si wafer, thus giving rise to an overall reduction of the total Si thickness and to the fabrication of a device with cheaper methods at low temperatures. In particular, the CNT film coating the Si wafer acts as a conductive electrode for charge carrier collection and establishes a built-in voltage for separating photocarriers. Moreover, due to the CNT film optical semitransparency, most of the incoming light is absorbed in Si; thus the efficiency of the CNT/Si device is in principle comparable to that of a conventional Si one. In this paper an overview of several factors at the basis of this device operation and of the suggested improvements to its architecture is given. In addition, still open physical/technological issues are also addressed.

A System Design and Implementation for Geotechnical Engineering Field Application of Drone (드론의 지반공학분야 활용을 위한 시스템 설계 및 구현)

  • Kim, Taesik;Jung, Jinman;Min, Hong
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.16 no.3
    • /
    • pp.173-178
    • /
    • 2016
  • Many studies have been carried out on monitoring the target by cooperating a drone with remote sensors recently. This monitoring system uses static sensors to measure environmental data and drones to collect measured data. In geotechnical engineering, inspectors go around measuring the safety of construction site and it is impractical to compose a network among numerous sensors in terms of the cost efficiency. In this paper, we propose a data collection system based on interaction between a drone and a few sensors that are installed around the target structure for geotechnical projects. Through experimental results, we also verify the availability and the time and cost efficiency of the proposed system comparing with using inspectors.