During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.
Change requests occur persistently in the construction phase of a construction project. The law requires that the contract amount be adjusted in accordance with the relevant regulations when there is a change in the construction amount due to the design change in the construction contract. SAVE international, on the other hand, defines the value methodology as a systematic and structured approach to improving projects, products and processes. Design Changes in the construction projects require organizational efforts to improve value and quality. However, the law does not include change requests in which the VE object is fixed and related data is collected and function analysis can be derived in a short time. Therefore, it is necessary to apply VE to the design change procedure, which can further improve the value of construction work. The application derived from this study need to be presented as simply as possible without compromising the basic concept of VE. If the application is extended to the field and proved to be effective, it is expected to contribute to the overall value of construction work.
The 3th International Conference on Construction Engineering and Project Management
/
pp.203-211
/
2009
Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.
Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.371-375
/
2015
Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.
정부기관은 공사계획단계 및 시공 중 발생하는 설계변경으로 인한 공사비 증가가 23,663억 원에 달하는 것으로 발표한바 있다. 설계변경은 표준화가 어려운 건축설계의 특성으로 인해 발생하는 현상으로 발주자의 요구사항변경, 관련 제도, 설계 부적정, 현장여건 등 건설프로젝트 전반에 걸쳐 그 원인이 존재하기 때문에 기본설계 및 중간설계 단계에서 완벽한 설계를 한다 하더라도 설계변경을 예방하고 감소시키는 데에는 한계가 있다. 또한 공사계획 및 시공단계에서 단편적 인 검토만으로 설계변경안을 선정하는 현행 관리프로세스는 또 다른 설계변경을 유발시켜 재시공과 그에 따른 공사비 증가의 주된 원인이 되고 있어, 공사계획 및 시공 중 발생한 설계변경에 효율적으로 대처하는 방안이 요구되고 있다. 이에 본 연구에서는 CM 발주방식의 건축프로젝트를 대상으로 건설사업관리자가 프로젝트 수행 중 발생하는 설계변경에 대하여 다수의 설계변경안을 비용, 성능, 시공성 측면에서 복합적이고 정량적으로 평가하여 적정 설계변경안을 선정할 수 있는 의사결정지원 프로세스의 논리구조와 기본모형을 제시하였다.
본 연구는 민간기업에서 시행한 아파트 단지의 조경공사 중 식재설계변경의 유형과 변경의 타당성을 분석하여 공기업과 비교 고찰함으로써 조경공사 시에 발생하는 식재설계 변경을 객관적이고 효율적으로 관리하기 위한 기초 자료 제시를 목적으로 수행하였다. 본 연구의 결과 다음과 같은 다섯 가지를 얻을 수 있었다. 첫째, 민간기업에서 시행한 아파트 단지 조경공사에서 발생한 설계 변경 중 식재공사에서 발생한 비율이 61.8%를 차지하고 있음으로써 식재 부분이 설계변경의 주된 대상이 되는 것으로 나타났다. 둘째, 이러한 설계변경원인으로는 주로 공기부족 등 현장 여건과 관련되는 것이었고, 특히 체계적 설계변경보다는 현장에서 구두 설계변경승인으로 이루어지는 것으로 나타났다. 셋째, 식재설계의 설계변경은 한 건의 설계변경 승인에 7~48회의 동시다발적으로 발생하는 특징을 보이고 있었다. 넷째, 민간기업에서 발생하는 조경식재공사 설계변경 유형은 '이용자를 고려한 설계변경', '이미지 개선을 위한 설계변경', '유지관리의 용이성을 위한 설계변경', '설계내역 불일치로 인한 설계변경', '타 공종과의 관계로 인한 설계변경', '현장조사 미비로 인한 설계변경', '시공성을 고려한 설계변경' 등 총 7가지의 조경식재공사 설계변경 유형으로 구분할 수 있었는데 이것은 공기업에서 추진하는 설계변경 유형과 크게 다르지 않은 것으로 나타났다. 넷째, 이들 7가지 중 민간기업의 경우, '이용자를 고려한 설계변경'과 '이미지 개선을 위한 설계변경'이 전체 설계변경의 빈도에서 과반수를 넘는 것으로 나타나 공기업의 '이용자를 고려한 설계변경'과 '설계내역 불일치로 인한 설계변경'으로 나타난 것과 상이한 점을 보이고 있었다. 다섯째, 식재공사 설계변경 과정의 경우 민간기업은 공기단축을 통한 공사비용 절감 차원에서 선(先)시공 후(後)승인의 관행을 보이고 있는 것으로 나타났지만, 공기업의 경우 현장에서 설계변경 사유가 발생하였을 시 현장 상황 및 변경내용을 검토하고 반영하여 설계변경 절차를 보이는 등 상이한 절차를 거치는 것으로 나타났다. 이상의 결과는 조경공사 중 식재설계 변경의 유형은 공기업, 사기업에 관계없이 7개의 범주로 설계변경의 유형은 동일하나, 설계변경의 주된 사유와 절차는 상이한 점이 있는 것으로 나타남으로써 식재설계 변경은 조경공사의 성격에 따라 합리성과 효율성 차원에서 유동성 있게 적용하는 것이 바람직한 것으로 사료되었다.
Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.
The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.
본 연구는 'A'공사에서 발주된 아파트 단지 조경식재공사에서 발생하는 설계변경의 유형과 설계변경의 적합성 인식을 분석함으로써 향후 조경식재공사의 설계변경을 효율적으로 관리하기 위한 기초 자료 제시를 목적으로 수행하였는바 다음과 같은 결론이 도출되었다. 첫째, 2기 신도시 건설 이후 'A'공사에서 발주하여 시행된 수도권 현장 자료를 중심으로 조사 분석을 실시하여 '이미지 개선을 위한 설계변경', '설계내역의 불일치로 인한 설계변경', '현장조사 미비로 인한 설계변경', '이용자 미 고려로 인한 설계변경', '시공성의 고려로 인한 설계변경', '유지관리의 용이함을 위한 설계변경', '타 공종과의 관계로 인한 설계변경' 등 총 7가지의 조경식재공사 설계변경 유형을 구분할 수 있었다. 둘째, 17개 주거단지에서 총 553건의 조경공사 설계변경이 있었고, 그 중 조경식재공사 설계변경은 37.6%에 해당하는 208건이 나타났다. 또한, 식재 설계변경으로 인하여 생기는 공사비의 유동성으로 인해 당초 계획된 공사비의 변경으로 부정적인 영향을 낳는 것으로 파악되었다. 셋째, 조경식재공사 설계변경은 '이미지 개선에 의한 설계변경'과 '설계내역 불일치에 의한 설계변경'이 조경식재공사 설계변경에서 절대적인 부분을 차지하고 있는 것으로 나타났다. 넷째, 조경분야 전문가를 대상으로 타당성 검증을 실시한 결과, 본 연구에서 도출한 7가지의 조경식재공사 설계변경 유형의 통계값이 모두 유의한 것으로 나타났다.
The 9th International Conference on Construction Engineering and Project Management
/
pp.823-830
/
2022
The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.