• Title/Summary/Keyword: cast-in-concrete

Search Result 499, Processing Time 0.023 seconds

Evalution for Mechanical Property and Durability of Miner's Shotcrete (광산용 숏크리트의 역학적 특성 및 내구성 평가)

  • Nam-Gung, Kyeong;Ma, Sang-Joon;Lee, Kyeo-Re;Yun, Kyong-Ku
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.2
    • /
    • pp.1461-1468
    • /
    • 2015
  • Mostly mine support(Rock bolt and Support) which is currently general for reinforcements of a large scale tunnel is applied, Some executing a reinforcement to Poor ground by cast-in-place shotcrete. However On domestic mine conditions that couldn't having every time after mine tunnel excavation, it couldn't ensure the field batch plant which is a fixed in an issue of economies and site security, constructing it by supply gets from shotcrete materials combined in neighborhood ready mixed concrete manufacturing plants. carried shotcrete in ready mixed concrete manufacturing plants as migration length and time are falling off in quality. But, it is difficult for construction quality control By quality control arbitrariness absence at on-scene. In the present study, carry out Laboratory Test by kinds and percentages of accelerating agent for evalution of Mechanical Property and Durability of Shotcrete.

Development of Long-Span Railway Bridges Design Using IPC Girder (IPC 거더를 이용한 장지간 철도교 설계에 관한 연구)

  • Jang, Won-Seok;Park, Jun-Myung;Park, Sun-Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.4
    • /
    • pp.149-158
    • /
    • 2003
  • It is customary that tendons and sectional dimensions are calibrated and tendon forces are applied at once at the initial stage to keep the subsequent stresses occuring at different loading stages within the allowable stresse in prestressed concrete (PSC) bridge design. However, this traditional tensioning method usually results in a too conservative sectional depth in view of ultimate capacity of a girder. A new design method which can realize the reduction of sectional depth of PSC girder is theoretically suggested in this study. Tendons are tensioned twice at different loading stages: the initial stage and the stage after fresh slab concrete is cast. It can be shown that according to this technique, sectional depth can be significantly reduced and larger span can be realized compared to traditional ones. In this paper, there is an example about the design of bridge by means of new PSC design theory, having a longer span than a existing railway bridge. Also, a new method by continuous tendon profiles is presented to be continuous a IPC bridge.

Experimental Evalution of Structural Behavior on SRC type TEC-BEAM to RC Column Connection (SRC형 TEC-BEAM과 RC기둥 접합부 구조적 거동의 실험적 평가)

  • Ju, Young Kyu;Kim, Do Hyun;Chung, Kwang Ryang;Kim, Sang Dae
    • Journal of Korean Society of Steel Construction
    • /
    • v.14 no.3
    • /
    • pp.463-470
    • /
    • 2002
  • The TEC-Beam system is a composite beam consisting of structural tee, precast concrete, and cast-in-site reinforced concrete slab. The preliminary test of the proposed system was performed for simple beams, showing good behavior. However, for the field application of the system. TEC-Beam - RC column connection was required to produce a mechanism that transfers the force occurring in the lower part of the TEC-Beam. Thus, this study developed a connection mechanism that transfers the force occurring in the lower part of the TEC-Beam. Thus, this study developed a connection wherein the section of the TEC-Beam was enlarged and the lower part reinforced. Two setups of the proposed system were experimentally investigated. using the anchorage length of reinforcement., i.e., length of the increased section, as test parameter. It could be concluded from the result that the proposed system shows good structural behavior, with potential applicability in the field.

Influence of joint modelling on the pushover analysis of a RC frame

  • Costa, Ricardo;Providencia, Paulo;Ferreira, Miguel
    • Structural Engineering and Mechanics
    • /
    • v.64 no.5
    • /
    • pp.641-652
    • /
    • 2017
  • In general, conventional analysis and design of reinforced concrete (RC) frame structures overlook the role of beam-column (RCBC) joints. Nowadays, the rigid joint model is one of the most common for RCBC joints: the joint is assumed to be rigid (unable to deform) and stronger than the adjacent beams and columns (does not fail before them). This model is popular because (i) the application of the capacity design principles excludes the possibility of the joint failing before the adjacent beams and (ii) many believe that the actual behaviour of RCBC joints designed according to the seismic codes produced mainly after the 1980s can be assumed to be nominally rigid. This study investigates the relevance of the deformation of RCBC joints in a standard pushover analysis at several levels: frame, storey, element and cross-section. Accordingly, a RC frame designed according to preliminary versions of EN 1992-1-1 and EN 1998-1 was analysed, considering the nonlinear behaviour of beams and columns by means of a standard sectional fibre model. Two alternative models were used for the RCBC joints: the rigid model and an explicit component based nonlinear model. The effect of RCBC joints modelling was found to be twofold: (i) the flexibility of the joints substantially increases the frame lateral deformation for a given load (30 to 50%), and (ii) in terms of seismic performance, it was found that joint flexibility (ii-1) appears to have a minor effect on the force and displacement corresponding to the performance point (seismic demand assessed at frame level), but (ii-2) has a major influence on the seismic demand when assessed at storey, element and cross-section levels.

Strength of PSC Bridge Decks using Half-Depth Precast Panel with Loop Joint (루프이음 반단면 프리캐스트 패널을 이용한 PSC 바닥판의 강도평가)

  • Chung, Chul Hun;Kim, Yu Seok;Hyun, Byung Hak;Kim, In Gyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5A
    • /
    • pp.433-445
    • /
    • 2009
  • The panels are used as a composite part of the completed deck. They replace the main bottom transverse deck reinforcement and also serve as a form surface for the cast-in-place concrete upper layer that contains the top of deck reinforcement. Research has also demonstrated that mechanical shear ties on the top of the panels are required. In a composite deck with precast panels, it is required to notice behavior of transverse joints between panels. In this paper, static tests of composite deck with shear ties and loop joints were conducted. From the results, the validity of loop joints for continuity of deck was observed. Also, a composite behavior was abserved between precast panel and slab concrete. Tested composite decks with shear ties have 140~164% ultimate strength than have no shear ties due to the increase of composite action. Therefore, the shear ties between the slabs were sufficient to enforce composite flexural behavior to failure.

A study on structural performance of steel brackets in vertical shaft connected to double-deck tunnel (복층터널 연결 수직구용 철재브래킷 구조성능 연구)

  • Shin, Young-Wan;Min, Byeong-Heon;Nam, Jung-Bong;Lee, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.3
    • /
    • pp.363-375
    • /
    • 2019
  • Since the double-deck tunnel is deeply constructed in the city, it is necessary to secure the installation space of air supply and exhaust, escape passage stairs, elevator, distribution facilities and connection tunnels in the vertical shaft for the double-deck tunnel. Also, in order to minimize the effect of construction on adjacent area, it is necessary to construct the concrete structures at high speed in vertical shaft after tunnel excavation. Therefore, the slabs and the stairs in vertical shaft are needed to be constructed using precast concrete, and the rapid construction techniques of bracket for supporting the inner precast structure are needed. The bracket installation methods include cast-in-place concrete, precast concrete and steel. In this study, the improvement of the steel brackets with good economical efficiency and good workability was carried out in consideration of the improvement of the construction speed. We have developed a new bracket that is optimized through bracket shape improvement, anchor bolt position adjustment and quantity optimization. As a result of the structural performance test, it was confirmed that the required load supporting capacity was secured. As a result of structural performance test for bar type anchor bolt and bent anchor anchor bolt, it was confirmed that the required load carrying capacity was secured and that the load bearing capacity of bent anchor bolt was large.

Application of numerical simulation for the analysis and interpretation of pile-anchor system failure

  • Saleem, Masood
    • Geomechanics and Engineering
    • /
    • v.9 no.6
    • /
    • pp.689-707
    • /
    • 2015
  • Progressive increase in population causing land scarcity, which is forcing construction industry to build multistory buildings having underground basements. Normally, basements are constructed for parking facility. This research work evaluates important factors which have caused the collapse of pile-anchor system at under construction five star hotel. 21 m deep excavation is carried out, to have five basements, after installation of 600 mm diameter cast in-situ contiguous concrete piles at plot periphery. To retain piles and backfill, soil anchors are installed as pit excavation is proceeded. Before collapse, anchors are designed by federal highway administration procedure and four anchor rows are installed with three strands per anchor in first row and four in remaining. However, after collapse, system is modeled and analyzed in plaxis using mohr-coulomb method. It is investigated that in-appropriate evaluation of soil properties, additional surcharge loads, lesser number of strands per anchor, shorter grouted body length and shorter pile embedment depth caused large deformations to occur which governed the collapse of east side pile wall. To resume work, old anchors are assumed to be standing at one factor of safety and then system is analyzed using finite element approach. Finally, it is concluded to use four strands per anchor in first new row and five strands in remaining three with increase in grouted and un-grouted body lengths.

Shear Behavior of Reinforced Concrete Beams according to Replacement Ratio of Recycled Coarse Aggregate (순환 굵은골재 치환율에 따른 철근콘크리트 보의 전단거동)

  • Kim, Sang-Woo;Jeong, Chan-Yu;Jung, Chang-Kyo;Kim, Kil-Hee
    • Journal of the Korea Concrete Institute
    • /
    • v.24 no.2
    • /
    • pp.157-164
    • /
    • 2012
  • This study evaluates the shear performance of reinforced concrete beams with recycled coarse aggregates. A total of six specimens with various replacement ratios of recycled coarse aggregates (0%, 50%, and 100%) and different amount of shear reinforcement were cast and tested in this study. A finite element analysis was performed to predict the shear behavior of the specimens with natural or recycled coarse aggregates. The FE analysis was performed using a two-dimensional nonlinear FE analysis program based on the disturbed stress field model (DSFM), which is an extension of the modified compression field theory (MCFT). Experimental results showed that the specimens with 50% and 100% replacement ratios of recycled coarse aggregates had the similar shear strength compared to the specimen with natural aggregates, regardless of the replacement ratios of recycled coarse aggregates and the amount of the shear reinforcement. Furthermore, the comparison between experimental and analytical results showed that the proposed numerical modeling methods and the analytical model, DSFM, can be successfully used to predict the shear behavior of reinforced concrete beams with recycled coarse aggregates.

Assessment of damages on a RC building after a big fire

  • Ada, Mehmet;Sevim, Baris;Yuzer, Nabi;Ayvaz, Yusuf
    • Advances in concrete construction
    • /
    • v.6 no.2
    • /
    • pp.177-197
    • /
    • 2018
  • This paper presents a case study about the damages on the structural elements of a cast in place reinforced concrete (RC) building after a big fire which was able to be controlled after six hours. The fire broke off at the $2^{nd}$ basement floor of the building, which has five basements, one ground, and two normal floors. As a result of intensely stocked ignitable materials, it spread out to the all of the upstairs. In visual inspection, most of the typical fire damages were observed (such as spalling, net-like cracks, crumbled plasters, bared or visible reinforcement). Also, failures of the $2^{nd}$ basement columns were encountered. It has been concluded that the severity failures of the columns at the $2^{nd}$ basement caused utterly deformation of the building, which is responsible for the massive damages on the beam-column connections. All of the observed damages were categorized related to the types and presented separated regarding the floors. Besides to the visual inspection, the numerical analysis was run to verify the observed damaged on the building for columns, beams, and the connection regions. It is concluded from the study that several parameters such as duration of the fire, level of the temperature influence on the damages to the RC building. Also, it is highlighted by the study that if the damaged building is considered on the overall structural system, it is not able to satisfy the minimum service requirements neither gravity loads nor earthquake conditions.

Structural Behaviour of TEC-BEAM Connection with Steel Column Under Cyclic Loading (반복하중을 받는 TEC-BEAM 철골브라켓 접합부 거동평가)

  • Ju, Young Kyu;Kim, Ji Young;Kim, Myeong Han;Jung, Kwang Ryang;Kim, Sang Dae
    • Journal of Korean Society of Steel Construction
    • /
    • v.14 no.1
    • /
    • pp.51-58
    • /
    • 2002
  • To reduce the story height for high-rise buildings, the TEC Beam is developed as a new composite beam composed of structural tee, precast concrete, stirrup, and site-in-cast reinforced concrete slab. The preliminary test of the proposed system was performed for simple beams and it showed a good behavior. However, for the field application of the system, it is required to develope a steel moment resisting connection using steel brackets on which upper rebars of the TEC BEAM are anchored. In this paper, three types of the proposed system are experimentally investigated. The parameters of the test are as follows: (1) the spacing of transverse bars, (2) the ratio of width of rebar's layer to bracket length. Specimens were classified as semi-rigid full strength by the Eurocode 4. It could be concluded that the proposed moment resisting system shows a good structural behavior and may be applicable in the filed.