Earthquake safety of existing buildings has gained considerable importance after earthquakes which have occurred in our country especially in the last 30 years. Performance based assessment methods have been widely used for existing reinforced concrete structures. This study aims to investigate the earthquake performances of the building stock located in Van Lake basin in Eastern Anatolia of Turkey. The case study of buildings has been modeled on and the structural performances have been determined by employing the non-linear methods described in the latest Turkish Earthquake Code published in 2007. The Van lake basin is located on the very seismically active in a region. On October 23, 2011, a magnitude of Mw 7.2 earthquake struck the Van province in eastern Turkey. The earthquake ground motion was recorded as about 0.1g in Bitlis province. Performance evaluations have been performed by taking samples from each district consisting urban building stocks of Bitlis. A total of 16 reinforced concrete buildings have been evaluated. Among them, 53% of those buildings were determined in the Fully Operational performance level; 13% of them in the Life Safety performance and 34% of them could not be evaluated because of the ratio of the effective mass of first mode to the total mass of the buildings was smaller than 0.70. Therefore, incremental equivalent seismic load methods, which are a part of Turkish Earthquake Code -2007, cannot be used.
Misir, I. Serkan;Ozcelik, Ozgur;Girgin, Sadik Can;Kahraman, Serap
Structural Engineering and Mechanics
/
v.44
no.6
/
pp.763-774
/
2012
Reinforced concrete frame structures with masonry infill walls constitute the significant portion of the building stock in Turkey. Therefore it is very important to understand the behavior of masonry infill frame structures under earthquake loads. This study presents an experimental work performed on reinforced concrete (RC) frames with different types of masonry infills, namely standard and locked bricks. Earthquake effects are induced on the RC frames by quasi-static tests. Results obtained from different frames are compared with each other through various stiffness, strength, and energy related parameters. It is shown that locked bricks may prove useful in decreasing the problems related to horizontal and vertical irregularities defined in building codes. Moreover tests show that locked brick infills maintain their integrity up to very high drift levels, showing that they may have a potential in reducing injuries and fatalities related to falling hazards during severe ground shakings.
Journal of the Korea Institute of Building Construction
/
v.4
no.1
/
pp.105-110
/
2004
Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.
Fire hazards in an apartment building that represents the average households in Korean were investigated by conducting a full-scale experiment. This experiment attempts to analyze fire hazards using materials, and furnishings common to Korean housing stock. Experimental results are compared to the predictions of the C-FAST and smoke transport computer model. Comparisons between experimental data and C-FAST data are performed only to a living-room fire. Flashover occurred at approximately 380 seconds in a fire experinent, and at approximately 420 seconds in Zone-Model. Based on all of data between experimental data between experimental data and Zone-Model data, it is concluded that the safe egress time is at least 250 seconds.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.81-82
/
2023
Since the COVID-19 pandemic, the importance of remote work has been emphasized, and new digital technologies are rapidly being developed. One such digital technology is the metaverse, which combines reality and virtual space to create an expanded digital world. The metaverse can provide online collaborative spaces that visualize and transmit information and data in real-time. When applied to construction sites, this technology is expected to enable more efficient and stable project management. However, research on construction metaverses, both domestically and internationally, is still inadequate. In this study, 16 influential factors for promoting the application of metaverses to the construction industry were identified through the initial stages of the system dynamics technique. These performance factors were classified into four categories: systemrelated factors for metaverse site construction, device-related factors, user-related factors, and construction site-related factors. It is expected that this study will promote research on the activation of Con-Metaverse by developing casual loop diagrams(CLD) to identify the relationship between each performance factor and constructing stock & flow diagrams(SFD) for simulations in future studies.
The economic consequences of large earthquakes require a revolutionary change in the seismic performance objective of residential and commercial buildings. The majority of total construction costs consist of non-structural and architectural costs. Therefore, the aim of this research is to upgrade current Life Safety performance objectives and to offset adverse effects on country's economy after an occurrence of large earthquakes. However, such a proposal cannot easily prove the feasibility of cost-benefit analysis in structural design. In this paper, six generic reinforced concrete frames and dual system structures designed based on Turkish Seismic Code were used in cost analysis. The study reveals that load bearing structural systems with Immediate Occupancy performance level in seismic zones can be achieved with negligible costs.
This study investigates the effects of soft story, short columns, heavy overhangs, pounding, and construction and workmanship quality parameters on seismic response of reinforced concrete buildings through nonlinear static and dynamic procedures. The accounted parameters are selected for their common use in rapid screening of RC buildings. The 4- and 7-story buildings designed according to pre-modern codes are used to reflect majority of the existing building stock. The relative penalty scores are employed in this study to evaluate relative importance of certain irregularities in the existing rapid seismic assessment procedures. Comparison of relative scores for the irregularities considered in this study show that the overall trend is similar. The relatively small differences may be accounted for regional construction practices. It is concluded that initial-phase seismic assessment procedures based on architectural features yield in somewhat similar results independent of their bases. However, the differences in the scores emphasize the proper selection of the method based on the regional structure characteristics.
Many of logistics-related research in automobile industry has focused on inbound logistics and procurement. Research into outbound logistics is relatively few. As a starting research into outbound logistics in automobile industry, this paper examined its logistics network problems with three aspects - location strategy, inventory strategy and transportation strategy. We proposed alternatives of logistics network design resolution, and presented three practical scenarios based on those alternatives. Based on interview, on-site visit and internal data collection processes, we identified major domestic outbound logistics problems such as redundant logistics bases, inefficient delivery policy, insufficient inventory capacity, inventory stock quality deterioration, inefficient transportation system, and etc. In order to cope with those problems, we proposed such strategic alternatives as introduction of hub-and-spoke system, integration of logistics bases, introduction of (automatic) parking building, diversification of transportation mode, and etc. At the same time, we constructed three practically executable scenarios based on those ideas. The first is "Center Hub" scenario, the second is "Metropolitan Hub" scenario. The third and last scenario is "Regional Consolidation of Warehouses (distribution centers)".
International Journal of Advanced Culture Technology
/
v.11
no.3
/
pp.231-235
/
2023
Currently, China's urban landscape is undergoing a gradual shift from incremental development to stock renovation. Furthermore, the planning and development objectives of urban communities have evolved from solely focusing on physical space construction to promoting sustainable development within a humanistic society. The current approach to community planning and construction, which emphasizes a singular dimension of residential life, overlooks the multifaceted aspects of community life and production. This oversight leads to a lack of attention to interpersonal relationships within the community, difficulties in establishing a connection between people and their environment, and numerous other issues. Consequently, this paper seeks to redefine the concept of sociality within community spaces by considering the continuum of time and space within communities. It aims to delineate the roles of "power" and "rights" within the community context, with a particular focus on everyday life, in order to reevaluate strategies and methods for fostering dynamic community development.
Patrick T.I. Lam ;Albert P. C. Chan ; Akintola Akintoye ;Arshad Ali Javed
International conference on construction engineering and project management
/
2011.02a
/
pp.389-394
/
2011
In many parts of the world, low cost housing used to be built and maintained by the governments, based on designs and detail specifications prepared by the public sector with construction carried out by contractors. Results vary due to differences in design standards, workmanship and property management, depending also on the neighbourhood's care of the estates and their pattern of usage. In the UK, where Private Finance Initiative (PFI) has been used for infrastructure projects, there have been successful cases of city estate being transformed by PFI. These PFI housing schemes involve new-build, refurbishment as well as facility management. Unlike traditional construction, which is based on prescriptive specifications, PFI housing is based on output specifications. A study has been undertaken to compare the two specification approaches as they are applied to housing estate. Results are enlightening and serve as good reference to cities such as Hong Kong SAR and Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.