• 제목/요약/키워드: building phase

검색결과 1,033건 처리시간 0.021초

건축공사 설계단계에서의 시공엔지니어링 업무 수행에 따른 시공성 평가 방안 (Evaluation Method of Constructability Performance by Implementing Construction Engineering at the Design Phase of Building Construction)

  • 김태훈;조규만
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.128-129
    • /
    • 2018
  • With the increase of tall building construction, efforts for enhancing constructability are required from the pre-construction stage. Therefore, in this study, we proposed an evaluation method of constructability performance by performing construction engineering activities at the design phase. Based on some results of previous studies, we estimated the importance of design factors and categories influencing the constructability in each engineering activity related to temporary work and then presented a method for evaluating the constructability performance of design alternatives.

  • PDF

시공단계에서의 BIM 도입 저해요인에 관한 기초연구 (A Study on Obstacle Reasons of BIM in Construction Phase)

  • 김지선;유승규;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.61-62
    • /
    • 2011
  • Construction plans for large construction projects are problems such as Incompatibility of information, omissions due to technical limitations of 2D CAD. In addition to, Plan established for the validation such as process, cost and construction technology plan is difficult. By occurring Frequent changes in the course of business, Inefficiency of management has occurred. In the construction process, there is occurred costs and construction delays due to reconstruction or communication error. In this study, It was deemed BIM will complement Existing 2D CAD problem. And, BIM case studies in the construction phase of domestic construction were analyzed, How to apply BIM in the construction phase investigated.

  • PDF

건설사업 성과목표수립 단계의 필요성에 관한 연구 (The Necessity of Performance Goal Setting Phase for Construction Project)

  • 전미연;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.159-162
    • /
    • 2011
  • The goal setting and performance measurement is essential tool for performance management. If appropriate goal setting and performance measurement is not done, problems may arise in the management. Therefore, in order to improve the efficiency of building production that management is essential. In addition, the construction project objectives established at the planning phase give considerable influence on the success of the construction project. Therefore, objective of this paper is to suggest the necessity of performance goal setting phase. This paper analyzes problems of goal setting phase and suggests the way to improve about problems.

  • PDF

BIM기반 통합설계프로세스의 국내 적용 가능성에 관한 연구 (A Study on the Adaptability of BIM-based Integrated Building Design Process in Domestic Architectural Design Firms)

  • 이진희;전한종
    • 한국실내디자인학회논문집
    • /
    • 제16권6호
    • /
    • pp.19-27
    • /
    • 2007
  • As AEC(architecture, engineering and construction) industry becomes larger and more complex, much information is going into each part and phase. Therefore, the existing building design process has to change and collaboration is emphasized among participants in various fields. The purpose of this study is to compare and analyze existing building design process and integrated building design process based on BIM using a IDEF0 methodology. And then, it establishes a desirable domestic integrated building design process application plan focusing on the design phase of domestic cases. As a result of analysis, flowing conclusions are included ; Firstly, problems occur on the existing building design process that are accomplished with focusing on the outcome. It makes much errors because of 2D-based information. Another problems is that collaboration doesn't go on smoothly. But, integrated building design process is accomplished with the collaboration and the coordination which pursues change and perfects cooperation. Secondly, BIM is a process of effecting optimum integrating, re-using information, and expense reduction throughout the life-cycle of a building. Moreover, it establishes a basis for the integrated building design process to build a collaboration system.

설계단계에서의 BIM기반 통합설계 프로세스 적용 방안에 대한 연구 (Application of BIM-Based Integrated Building Design Process at the Design Phase)

  • 서창석;함남혁;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.195-199
    • /
    • 2010
  • Today, as construction industry grows rapidly, technology has advanced throughout the whole industrial world. Architectural design phase has gone digital from the traditional method of drawing which was an important means in the past, and Building Information Modeling(BIM), an emerging new paradigm, changed architectural design process. So this paper studies the difference between a 2D-based and a BIM-based design process which are currently applied to domestic, and proposes a BIM-based integrated design process in order to help establish BIM to domestic efficiently.

  • PDF

Influence Factors and Management based on Phase of Building Construction for the Improvement of Post Occupancy Indoor Air Quality

  • Lim, Hyoung-Chul
    • 한국건축시공학회지
    • /
    • 제11권6호
    • /
    • pp.576-586
    • /
    • 2011
  • In recent years, pollution in residential spaces has been a significant area of concern. In particular, the indoor air quality (IAQ) of an apartment building before occupancy, which is related to the interior material, is a serious problem. Unlike previous research, which has mainly focused on pollution control after construction, this study has derived influencing factors and priority of management with a controlling schedule for IAQ. The objectives of this research are 1) control of schedule or improvement of management for IAQ, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall?based apartment buildings and in column?based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.

A Whole LCA of the Sustainable Aspects of Structural Systems in Tall Buildings

  • Trabucco, Dario;Wood, Antony;Vassart, Olivier;Popa, Nicoletta
    • 국제초고층학회논문집
    • /
    • 제5권2호
    • /
    • pp.71-86
    • /
    • 2016
  • This paper summarizes the results of a two-year-long research project conducted by the CTBUH on the life cycle assessment (LCA) of tall building structural systems. The research project was made possible thanks to a $300,000 contribution from ArcelorMittal and the support of some of the most important structural engineering firms and players in the tall building industry. The research analyzed all life phases of a tall building's structural system: the extraction and production of its materials, transportation to the site, construction operations, final demolition of the building, and the end-of-life of the materials. The impact of the building structure during the operational phase (i.e., impact on daily energy consumption, maintenance, and suitability to changes) was also investigated, but no significant impacts were identified during this phase.

농촌 지역사회개발의 학습단계와 주민역량강화 -자립형 농촌공동체 만들기 사업을 중심으로- (Learning Phase and Capacity Building in the Rural Community Development - Focusing on the Independent Rural Community Creation Project -)

  • 김경희;오대민;정충섭
    • 농촌지도와개발
    • /
    • 제24권1호
    • /
    • pp.49-61
    • /
    • 2017
  • The community development program is a project to design to develop rural areas and to enhance the situation of rural community. Participation in community development is the key to promoting efficiency for community development. The purpose of this study was to discuss the result of application of learning phase for capacity building of community development. This study examined cases from rural area, using examples from eight communities that have been able to get people's participation. These examples suggest that the learning phases for rural communities include five important factors: sharing the perception, setting a goal, goal refinement, empowerment, vision setting. After completing the rural community development program, the result of each steps were analyzed. The result of this study contributes to knowledge about phase for capacity building in the community development and suggests ways to increase of effectiveness of rural development program and promote participation based on an understanding of a rural community development context.

설계단계에서 적정 기계설비 공사비 산정을 위한 BIM 정보표현수준(BIL) 개선안 (A Proposal of BIL for Reasonable Cost Estimation of Mechanical Contracts and Construction in Design Phases)

  • 박보성;김선혜
    • 설비공학논문집
    • /
    • 제29권12호
    • /
    • pp.663-672
    • /
    • 2017
  • Building information modeling (BIM) technology based on 3D modeling has been applied to the entire domestic construction industry since 2010. It can calculate quantity take-off considering construction productivity at design phase. Based on this, it is possible to improve the reliability of construction cost prediction of design phase in the process of cost estimation. However, Building Information Level (BIL) defined by Ministry of Land, Infrastructure and Transport and Public Procurement Service does not seem to offer doable environment due to the lack of detailed application items. By calculating construction cost that meets Construction Cost Estimate Accuracy by American Association of Cost Engineers (AACE) through quantity take-off and cost estimation based on 3D modeling of BIM technology, a BIL improvement proposal at design phase for Mechanical Contracts and Construction is provided here. Results showed that properties including outline and minimum specification of the main equipment, internal main piping, and internal main duct should be defined from the intermediate design phase to have reliable cost estimation.

Modeling and experimental verification of phase-control active tuned mass dampers applied to MDOF structures

  • Yong-An Lai;Pei-Tzu Chang;Yan-Liang Kuo
    • Smart Structures and Systems
    • /
    • 제32권5호
    • /
    • pp.281-295
    • /
    • 2023
  • The purpose of this study is to demonstrate and verify the application of phase-control absolute-acceleration-feedback active tuned mass dampers (PCA-ATMD) to multiple-degree-of-freedom (MDOF) building structures. In addition, servo speed control technique has been developed as a replacement for force control in order to mitigate the negative effects caused by friction and inertia. The essence of the proposed PCA-ATMD is to achieve a 90° phase lag for a structure by implementing the desired control force so that the PCA-ATMD can receive the maximum power flow with which to effectively mitigate the structural vibration. An MDOF building structure with a PCA-ATMD and a real-time filter forming a complete system is modeled using a state-space representation and is presented in detail. The feedback measurement for the phase control algorithm of the MDOF structure is compact, with only the absolute acceleration of one structural floor and ATMD's velocity relative to the structure required. A discrete-time direct output-feedback optimization method is introduced to the PCA-ATMD to ensure that the control system is optimized and stable. Numerical simulation and shaking table experiments are conducted on a three-story steel shear building structure to verify the performance of the PCA-ATMD. The results indicate that the absolute acceleration of the structure is well suppressed whether considering peak or root-mean-square responses. The experiment also demonstrates that the control of the PCA-ATMD can be decentralized, so that it is convenient to apply and maintain to real high-rise building structures.