Browse > Article
http://dx.doi.org/10.5345/JKIBC.2011.11.6.576

Influence Factors and Management based on Phase of Building Construction for the Improvement of Post Occupancy Indoor Air Quality  

Lim, Hyoung-Chul (Department of Architectural Engineering, Changwon University)
Publication Information
Journal of the Korea Institute of Building Construction / v.11, no.6, 2011 , pp. 576-586 More about this Journal
Abstract
In recent years, pollution in residential spaces has been a significant area of concern. In particular, the indoor air quality (IAQ) of an apartment building before occupancy, which is related to the interior material, is a serious problem. Unlike previous research, which has mainly focused on pollution control after construction, this study has derived influencing factors and priority of management with a controlling schedule for IAQ. The objectives of this research are 1) control of schedule or improvement of management for IAQ, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall?based apartment buildings and in column?based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.
Keywords
IAQ (indoor air quality); influencing factor; phase of building construction; apartment building;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Choi YJ, Shim HS, Present Condition Indoor Air Quality after Remodeling in Apartment Units. Proceedings of the architectural institute of korea conference; 2007 Oct 26; Seoul, Korea. Seoul (Korea): the Architectural Institute of Korea; 2007. p. 1013-4.
2 Kim CN, Kim YK, Kim SS, Kang DH, Choi DH, Kim KW. The Development of estimation program of indoor air pollution concentration according to air exchange rate and pollutant emission rate of finishing building materials. Proceedings of the architectural institute of korea conference; 2007 Oct 26; Seoul, Korea. Seoul (Korea): the Architectural Institute of Korea; 2007. p. 913-4.
3 Lee YK. Research on Method of Experiment based on Schedule regarding to IAQ. Journal of the society of Air-conditioning and refrigerating engineers of korea. 2004 Jan;33(1):11-11.
4 Koh EH. Research on Analysis by Simulation about pollution of Newly Constructed House regarding to Interior Material [Master's Thesis]. Seoul (Korea): Chung-Ang University; 2005. 42 p.
5 Han KW, Kim HJ, Jung CH, Kim YD, Lee YK. A study on the actual condition of the indoor air quality in the new apartment house. Journal of the architectural institute of korea. 2006 Sep;22(9):267-8.   과학기술학회마을
6 Yeo MS. Guide of Evaluating Performance for Improving IAQ about Apartment House. Journal of the Korean Green Building Committee. 2006 Mar;7(1):37-14.
7 Bang JD, Kim DS, Kang HG, Jang SJ, You SD. The Research of Efficiency in Construction Schedule. Bundang (Korea): Korea National Housing Corporation; 1999. 157 p.
8 Shin BS, Shin HC, Hong HS, Choi KH. A Study on Implementation of the Sustainable Living Condition. Bundang (Korea); Korea National Housing Corporation; 2006. 66 p.
9 Architectural Institute of Korea. Standard Specification of Construction. Seoul (Korea): Kimoondang; c2006. Chapter 1, General Rules; p. 12-7.